Free software · 100% in your browser · no data sent

SIA 261 categories of use: imposed load on a floor for housing, offices, shops or storage

Turning a flat into an office or an office into a shop changes the imposed load on the floor: the studio shows the effect of the category of use on the beam.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

A change of use is often decided without thinking about the structure: a ground-floor flat becomes a shop, an office floor becomes an archive. Yet SIA 261 sets different imposed loads depending on how the rooms are used, and a beam sufficient for housing may no longer be sufficient for a shop or for storage.

The Site structural design studio offers categories A housing, B offices, C assembly areas, D shopping areas and E storage, with default imposed loads of 2, 3, 4, 5 and 5 kN/m² and the related combination factors ψ. These are adjustable defaults, to be checked in SIA 261 (storage loads depend heavily on what is stored). The result is a preliminary design that does not replace the calculation note signed by a civil engineer (SIA 260 to 267).

Worked example: 5.00 m floor beam by category of use

Main beam of a 20 cm reinforced concrete floor with screed (6.5 kN/m², default value of the studio), span 5.00 m, tributary width 4.00 m. ULS combination 1.35 · g + 1.5 · q. Default imposed loads of the studio. Hand calculation to understand the result.

Design load and moment by category of use (span 5.00 m, width 4.00 m)
Categoryq_k (kN/m²)Load q_Ed (kN/m)Moment M_Ed (kN·m)
A: housing247.1147.2
B: offices353.1165.9
C: assembly areas459.1184.7
D: shopping areas565.1203.4
E: storage565.1203.4

The permanent load per metre of beam is 6.5 × 4.00 = 26.0 kN/m; the imposed load 3 × 4.00 = 12.0 kN/m for offices. The design load is 1.35 × 26.0 + 1.5 × 12.0 = 35.1 + 18.0 = 53.1 kN/m, and the moment 53.1 × 5.00² / 8 = 165.9 kN·m. For a shop, the imposed load rises to 20.0 kN/m: 35.1 + 30.0 = 65.1 kN/m and 203.4 kN·m, that is 22.6 % more.

Categories D and E have the same default imposed load, and therefore the same ULS moment; but for storage the studio applies a higher quasi-permanent factor (0.8 instead of 0.6), which increases the long-term deflection and the mass used for the vibration criterion. In the tender for an alteration, this calculation justifies strengthening or a heavier section; the actual imposed load is set with the engineer according to the planned use.

Changing from offices to a shop raises the design moment from 165.9 to 203.4 kN·m (+22.6 %) on this 5.00 m beam: a change of use is checked before the works.

3 frequent mistakes with categories of use

Keeping the original category after a change of use

A housing floor turned into a shop or a meeting room must be checked with the new category, even if nothing changes in the construction itself.

Treating storage as a fixed value

Archives, shelving or pallets can far exceed the default value. The storage load is set according to what is actually stored.

Forgetting partitions and finishes

A new fit-out often adds partitions, suspended ceilings and heavier floors. These are permanent loads to add to the slab.

Comparing categories of use in 3 steps

  1. Describe the floor
    In the floor beam mode, enter the span, the tributary width and the slab type or its real permanent load.
  2. Choose the category
    Select A, B, C, D or E; adjust the imposed load if the engineer or the planned use requires it.
  3. Compare and export
    Note the section chosen, the utilisation, the deflection and the frequency for each category; export the sheet for the alteration file.

Open the free studio →

What the free version does not do for a change of use

The imposed loads and the factors ψ are defaults that have not been checked against SIA 261. The studio only checks a beam on two supports, without the slab, the columns, the foundations or the fire protection required by the new use. It is a decision aid that replaces neither the calculation note signed by a civil engineer nor the permit for the change of use. For a timber joist or beam, see the page on C24 and GL24h joists.

Soumissions prices the strengthening and the alteration works; the ERP tracks the site and the invoicing; Portail chantier shares the sheet and the supporting documents with the client.

Frequently asked questions

What imposed load for a dwelling?

The studio starts from 2 kN/m² for category A housing. The value to use is the one in SIA 261, to be checked by the engineer.

Is an office more heavily loaded than a dwelling?

Yes, the studio starts from 3 kN/m² for offices against 2 kN/m² for housing. An existing beam may therefore need strengthening.

Why does storage change the deflection but not the moment?

With the default values, D and E have the same imposed load, but a larger share of the storage load is treated as long-lasting: the long-term deflection increases.

Is the studio enough for a change of use?

No: it helps estimate the effect on one beam. The full check of the structure and the permit application still have to be done.