HEA or HEB column frame under an opening in a load-bearing wall: buckling and supports

When the remaining pier is too narrow or the masonry too weak, the beam sits on two steel columns taken down to a footing: here is how the studio flags it and how to read the buckling check.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

Opening a load-bearing wall often ends with good news: the beam finds its bearing on the remaining masonry, with or without a concrete padstone. But in fragile old brick, or when the remaining pier is only a few tens of centimetres wide, the concentrated load crushes the wall. The reaction must then be taken down to the ground through two columns: this is the frame.

The Site structural design studio first checks direct bearing (average stress compared with 1.25 times the design strength of the masonry f_xd), then a padstone up to 600 mm. If nothing is enough, or if the pier drops below 40 cm, it shows the frame alert and looks for two HEA or HEB columns up to size 300, checked for buckling about the weak axis and taken down onto a concrete footing. It is a preliminary design to support decisions: it replaces neither the calculation note signed by a civil engineer (SIA standards 260 to 267) nor the construction drawing.

Worked example: frame under a 3.60 m opening in old brick

Renovation of a small apartment building: a 3.60 m opening in a load-bearing wall of old perforated brick, design span 3.80 m, remaining pier 30 cm on one side. The beam carries an ULS design load of 55 kN/m (example value). Storey height 2.60 m, columns pinned at top and bottom. Section properties: catalogue values to be checked. Hand calculation to understand the result.

Reaction and buckling of a frame column (S235 steel, γM1 = 1.05, curve c, hand calculation)
StepFormulaValue
Reaction per support55 × 3.80 / 2104.5 kN
Buckling length1.0 × 2.60 m (pinned-pinned)2.60 m
HEA 100: slenderness λ260 cm / 2.51 cm (iz)103.6
Relative slenderness λ̄103.6 / 93.91.103
Buckling factor χcurve c, α = 0.490.483
Resistance N_b,Rd0.483 × 2120 mm² × 235 / 1.05229 kN

The support reaction is half of the total load: 55 × 3.80 / 2 = 104.5 kN. The 30 cm pier is below the 40 cm minimum used by the studio: the masonry cannot take this concentrated load, hence the frame. For a column pinned at both ends, the buckling length equals the height, 2.60 m. With a radius of gyration iz of 2.51 cm, the HEA 100 has a slenderness of 103.6 and a relative slenderness of 1.103 (93.9 for S235 steel). On curve c, the reduction factor is 0.483 and the buckling resistance 229 kN, a utilisation of 104.5 / 229 = 46 %.

The same calculation gives 334 kN for an HEA 120 and 471 kN for an HEA 140. If the foot could be fixed (factor 0.7, length 1.82 m), the HEA 100 would rise to 322 kN: this is why the end connections matter as much as the section. In the tender, this means two columns, two base plates, one footing per column and the temporary propping; the footing and the anchors are for the engineer.

With 104.5 kN per support and a pinned height of 2.60 m, an HEA 100 works at about 46 % in buckling; the footing and the connections remain to be designed by the engineer.

3 frequent mistakes with a column frame

Designing the column for plain compression

A slender 2.60 m column does not fail by crushing but by buckling: its real resistance can drop to half of the section resistance. Forgetting the factor χ overrates the column by a factor of two.

Assuming a fixed foot without a detail

A base plate laid on mortar is not a fixed end. If the calculation assumes 0.7 × the height while the foot is pinned, the resistance used is too high. Keep the full length until the engineer has detailed the connection.

Forgetting the footing and the ground

The reaction goes down to the slab or to the ground. A thin ground-bearing slab or fill can punch through under 100 kN. The footing is sized with the bearing capacity of the soil, to be checked on site.

Checking a column frame in the studio in 3 steps

  1. Describe the opening and the wall
    In the load-bearing wall opening mode, enter the clear span, the thickness, the type of masonry, the remaining pier and the storey height, then the loads carried.
  2. Read the bearing alert
    The studio compares the bearing stress with 1.25 · f_xd, tries a padstone, then shows the frame alert and the two HEA or HEB columns chosen, or reports that none is suitable.
  3. Print the sheet for the engineer
    Export the sheet or the CSV: reaction, section, columns and number of props are a basis for the discussion with the civil engineer who signs the calculation note.

Open the free studio →

What the free version does not do for a frame

The studio checks the columns for buckling about the weak axis only, without a moment at the top, without bearing eccentricity and without connections. It does not size the footing or the base plates and does not check the overall stability of the frame. It is a decision aid that replaces neither the calculation note and the construction drawing signed by a civil engineer nor the check on site. For direct bearing on masonry, see the page on padstones; for large openings, the one on 4 to 5 m spans.

Soumissions takes the steel weight, the padstones and the propping into the items of your tender; the ERP tracks the site and the hire of props; Portail chantier files the calculation sheets and the signed drawings site by site.

Frequently asked questions

When is a frame needed instead of a padstone?

When the masonry cannot take the load even with a 600 mm padstone, or when the remaining pier is narrower than 40 cm according to the studio's criterion. The engineer confirms the choice.

Why buckling about the weak axis?

An H section is much less stiff in the direction of its flanges. Without intermediate restraint, this is the direction in which the column buckles first.

Can the steel columns be replaced with timber?

The studio only offers HEA or HEB columns. A timber column is possible, but it must be designed separately, with its connections and its protection against moisture.

Does the studio design the column foundation?

No. It shows a concrete footing without a calculation. The bearing capacity of the soil and the reinforcement must be checked by the engineer, with a geotechnical study if needed.