Lateral torsional buckling of a steel or timber beam: unbraced length and lateral restraint of the flange

A beam strong enough in bending can tip over sideways if nothing holds its compression flange: lateral torsional buckling is handled through the choice of section and of restraint.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

Under a cast concrete slab or tight dry-packing, the top flange of a beam is held: it cannot move sideways. But during the works, or under a timber floor laid on top without fixings, the compression flange is free over the whole span. The beam can then twist and slip sideways well before reaching its bending resistance: this is lateral torsional buckling.

The Site structural design studio offers a box for a laterally restrained top flange and, if it is unticked, an unbraced length from 0 to 14 m. For steel, it calculates the elastic critical moment with a factor C₁ of 1.13 and derives the reduced resistance; for timber, it flags a slender section (depth more than four times the width) with no restraint of the compression face, without checking it. It is an indicative preliminary design, which does not replace the calculation note signed by a civil engineer under SIA standards 260 to 267.

Worked example: HEB 200 or IPE 300 unrestrained over 4 and 6 m

Opening in a load-bearing wall with a design moment of 60 kN·m. Two sections with similar plastic resistance are compared: HEB 200 and IPE 300, S235 steel, γM1 = 1.05. Section properties: catalogue values to be checked. Hand calculation of the critical moment to understand what the studio does.

Critical moment for lateral torsional buckling and relative slenderness (C₁ = 1.13, hand calculation)
SectionUnbraced lengthM_crλ̄_LTM_pl,Rd
HEB 2004.00 m482 kN·m0.56144 kN·m
HEB 2006.00 m292 kN·m0.72144 kN·m
IPE 3004.00 m181 kN·m0.90141 kN·m
IPE 3006.00 m102 kN·m1.20141 kN·m

The critical moment follows the classic formula M_cr = C₁ · π² · E · I_z / L² · √(I_w / I_z + L² · G · I_t / (π² · E · I_z)), with E = 210 000 MPa and G = 81 000 MPa. The HEB 200, wide and stocky (I_z = 2003 cm⁴), keeps a critical moment of 482 kN·m over 4 m, more than three times its plastic resistance of 143.9 kN·m: its relative slenderness λ̄_LT = √(W_pl · f_y / M_cr) is 0.56. The IPE 300, deep and narrow (I_z = 604 cm⁴), drops to 180.5 kN·m over 4 m and 102.2 kN·m over 6 m: its relative slenderness exceeds 1.2.

Above a relative slenderness of about 0.4, the buckling resistance falls noticeably; the studio applies this reduction and may change the section chosen. If the flange is restrained, the utilisation stays at 60 / 143.9 = 42 % for the HEB 200. In the tender, temporary restraint (cross-bracing, packing) or a stockier section are priced; the engineer sets the solution.

Without restraint, the critical moment of the IPE 300 drops to 102 kN·m over 6 m, below its plastic resistance, while the HEB 200 stays hardly affected: restraint of the compression flange changes the choice of section.

3 frequent mistakes with lateral torsional buckling

Ticking the restrained flange box by default

A beam laid under an unfixed timber floor, or waiting for the concrete, is not restrained. Untick the box and enter the real unbraced length between restraint points.

Choosing the lightest section without looking at its shape

For the same resistance, a deep, narrow IPE buckles sideways far more than an HEB. The weight saved can be lost again in temporary restraints or a change of section.

Forgetting the erection stage

During cutting and placing, before the dry-packing, the beam works without restraint. This is often the most unfavourable stage for lateral torsional buckling: propping and packing are planned accordingly.

Checking lateral torsional buckling in the studio in 3 steps

  1. Choose the section family
    In the material and section panel, choose HEB, HEA, IPE or HEM and the steel grade, or a timber family C24, GL24h or GL28h.
  2. Describe the restraint
    Tick the restrained top flange box only if it really is restrained; otherwise enter the unbraced length. For timber, state whether the compression face is held (decking, boarding).
  3. Compare with the minimum section button
    Run the search for the minimum section with and without restraint: the difference in section shows what the lack of restraint costs, to be discussed with the engineer.

Open the free studio →

What the free version does not do for lateral torsional buckling

The studio uses a single C₁ of 1.13 (distributed load, simple supports), treats twin sections as two independent sections and does not check lateral torsional buckling of timber, which it only flags. It calculates neither the cross-bracing nor the connections. It is a decision aid that does not replace the calculation note and the construction drawing signed by a civil engineer. To choose a section by span, see the HEB, HEA and IPE chart.

Soumissions takes the section, its weight and the temporary restraints into your tender; the ERP tracks the installation and the hours; Portail chantier keeps the sheet and the engineer's note site by site.

Frequently asked questions

What is lateral torsional buckling of a beam?

It is an instability: the compression flange moves sideways and the beam twists, before the section reaches its bending resistance.

When can the flange be considered restrained?

When a fixed element prevents it from moving sideways over the whole span: cast slab, tight dry-packing, fixed decking. Otherwise, enter the unbraced length.

Why does an HEB resist better than an IPE?

Its wide flanges give it high lateral stiffness and good torsional stiffness: its critical moment stays high.

Does the studio check lateral torsional buckling of a timber beam?

No: it only flags a slender section without restraint. Hold the compression face or have the beam checked by the engineer.