Timber creeps: under a permanent load, its deflection keeps growing for years, all the more so when the timber is damp. A beam that works in a heated living room can become too flexible under a terrace roof or an open eaves overhang. The estimator and the carpenter therefore need to know in which environment the member will live.
The Site structural design studio asks for the timber service class: 1 dry indoors, 2 sheltered, 3 outdoors. It calculates the final deflection including creep, w_fin = w_g · (1 + k_def) + w_q · (1 + ψ₂ · k_def), with default k_def values of 0.6, 0.8 and 2.0 depending on the class, and also reduces the design strength in class 3 (factor 0.8 by default). These values can be changed and are to be checked in SIA 265; the result is a preliminary design that does not replace the calculation note signed by a civil engineer.
Worked example: 4.00 m C24 beam in service class 1, 2 or 3
Solid timber C24 beam of 140 × 240 mm, span 4.00 m, on two supports. Permanent load 2.0 kN/m, imposed load 2.0 kN/m (housing, ψ₂ = 0.3). Modulus E 11 000 MPa. Deflection limit L/300 = 13.3 mm. Hand calculation, without shear deformation (the studio adds it: its deflections are slightly larger).
| Service class | k_def | Final deflection | L/300 limit |
|---|---|---|---|
| 1: dry indoors | 0.6 | 10.5 mm | 13.3 mm |
| 2: sheltered | 0.8 | 11.4 mm | 13.3 mm |
| 3: outdoors | 2.0 | 17.3 mm | 13.3 mm |
| 3: outdoors, C24 160 × 280 | 2.0 | 9.5 mm | 13.3 mm |
The second moment of area of the 140 × 240 section is 140 × 240³ / 12 = 1.613 · 10⁸ mm⁴. The instantaneous deflection under a distributed load of 2.0 kN/m over 4 000 mm is 5 × 2.0 × 4000⁴ / (384 × 11 000 × 1.613 · 10⁸) = 3.76 mm, for the permanent load as for the imposed load. In class 1: 3.76 × 1.6 + 3.76 × (1 + 0.3 × 0.6) = 6.02 + 4.44 = 10.45 mm. In class 3: 3.76 × 3.0 + 3.76 × 1.6 = 11.28 + 6.02 = 17.29 mm, beyond the 13.3 mm allowed.
The same member passes indoors and fails outdoors. In class 3, a 160 × 280 mm section (second moment of area 2.927 · 10⁸ mm⁴, instantaneous deflection 2.07 mm) comes back to 9.52 mm. In the tender, the service class decides the section, the choice between C24 and glulam and the protection of the timber; it is set with the architect and the engineer.
For the same 4.00 m C24 beam, the final deflection goes from 10.5 mm indoors to 17.3 mm outdoors: the service class can require a deeper section.
3 frequent mistakes with the service class
Designing an eaves overhang in class 1
An open shelter or a pergola is not a heated room. Entering class 1 underestimates creep and gives a section that is too small.
Confusing service class and use class
The service class is used to calculate strength and deformations; the use class concerns the durability and protection of the timber. They are two separate notions.
Forgetting creep under the permanent load
The permanent share creeps fully; the imposed load creeps only for its quasi-permanent share. Calculating only the instantaneous deflection understates the real long-term deflection.
Taking the service class into account in 3 steps
- Choose the timber family
In the material and section panel, choose C24, GL24h or GL28h and the section, or let the studio find the minimum section. - State the environment
Set the service class: 1 dry indoors, 2 sheltered, 3 outdoors. Check the deflection limit (L/300 by default, adjustable). - Read the final deflection
The SLS deflection card shows the deflection and the limit; compare the classes and export the sheet or the CSV.
What the free version does not do for timber
The values of k_def, strength and modulus are adjustable defaults that have not been checked against SIA 265. The studio does not check lateral torsional buckling of timber (it only flags it), nor connections, nor the fire resistance of a timber member. It is a decision aid that does not replace the calculation note signed by a civil engineer. For floor joists and purlins under snow, see the corresponding pages.
Soumissions takes the section, the timber volume and the protection into the items of your tender; the ERP tracks fabrication and installation; Portail chantier keeps sheets and details site by site.
Frequently asked questions
What is the timber service class?
It describes the moisture conditions in which the member works: dry indoors, sheltered or outdoors. It affects the design strength and the creep.
What does k_def represent?
It is the factor that turns the instantaneous deflection into the long-term deflection. The studio starts from 0.6, 0.8 and 2.0 depending on the class; to be checked in the standard.
Does glulam creep less?
The studio applies the same default k_def to C24 and to glulam; GL24h has a slightly higher modulus, so a smaller instantaneous deflection.
Is a beam sheltered under an eaves overhang in class 2?
Often, if it is protected from rain. The exact class depends on the exposure: it is decided with the engineer.