Timber Joist and Floor Beam Calculator: C24 or GL24h Cross-Sections

Size your C24 and GL24h timber joists or floor beams according to SIA 265 standard. Free calculation tool in your browser, no registration required.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Floor joists: dead loads, live load, and joist spacing

To design joist framing or a floor beam, the construction manager and the carpenter must first establish the exact load breakdown. On a standard residential floor, the live load is typically set at 2 kN/m² in accordance with standard SIA 261, but this value remains fully customisable within the tool depending on the occupancy category (offices, meeting rooms, retail, or storage).

Dead loads encompass the self-weight of the timber structure, decking, wood-based panels, ceiling linings, acoustic or thermal insulation, and any dry or liquid screed. Each component contributes its mass per square metre, transferred to the joists based on the tributary width defined by the centre-to-centre spacing.

By default, the studio opens with a simply supported floor beam over a 4.50 m span and a 0.60 m spacing. The corresponding tributary width directly determines the line load carried by each framing member. The tool applies action combinations for ultimate limit states (ULS) and serviceability limit states (SLS) according to the principles of standard SIA 260, incorporating the combination factors ψ for the chosen occupancy category. Modifying the spacing or the span automatically recalculates support reactions, maximum bending moment, and shear force.

Solid timber C24 sections: bending, shear, and bearing

Standard sawn softwood timber is modelled using strength class C24 according to standard SIA 265. This mechanical grade provides well-defined characteristic properties for calculating bending strength, shear capacity under shear force, and compression perpendicular to the grain at bearings.

The studio applies a linear elastic static calculation based on Timoshenko beam theory on two simple supports. This model accounts for both pure bending deflection and additional shear deformation. The tool compares the structural utilisation ratio to 100% of the design resistance value, clearly showing whether the resulting ratio is below, equal to, or above the allowable threshold.

On site, structural verification extends beyond mid-span:

  • Shear stress at the supports must not exceed the design value for C24 timber.
  • Compression perpendicular to the grain on plates or masonry requires adequate bearing area to prevent local timber crushing.
  • Bearing on existing masonry according to standard SIA 266 requires verifying that the direct bearing stress does not exceed 1.25 times the design strength of the substrate.

An optimisation button helps find the minimum section within the series, selecting the lightest profile with a utilisation ratio at or below 95%.

From solid timber to glulam: when to change section types

When the span exceeds common sawn timber lengths or when the live load requires a beam depth incompatible with headroom requirements, C24 solid timber reaches its limits. Solid members with large cross-sections become difficult to source without drying splits, and deflection often becomes governing.

Switching to homogeneous glued laminated timber (glulam) GL24h or GL28h then becomes the appropriate technical solution. Glulam allows for longer spans while maintaining compact cross-sections. Because its laminations are clear of major defects and finger-jointed with parallel grain, the material features higher moduli of elasticity and characteristic strengths than solid timber.

The integrated material comparison tool immediately displays the material savings achieved by switching from C24 timber to GL24h or GL28h. When an individual member's weight exceeds 100 kg, a manual handling warning highlights the need to plan for a gantry crane or beam lifter for indoor renovation work. If the element exceeds 250 kg, twin-beam configurations can be evaluated to facilitate handling through existing building openings.

Deflection limits and creep: why a timber floor deflects over time

A costly mistake on site is checking solely for ultimate limit state (ULS) load capacity without considering time-dependent deformation. It is common to see floors that are structurally safe against collapse, yet their progressive sag over several seasons causes doors to bind, cracks lower non-loadbearing partitions, and damages bonded floor finishes.

Timber is a viscoelastic material sensitive to variations in ambient humidity. Under sustained loading, initial elastic deflection increases due to time-dependent creep deformation. Standard SIA 265 accounts for this behaviour through service classes. The final deflection is the sum of instantaneous deflection and the creep component resulting from permanent loads and the quasi-permanent portion of the live load.

In the studio, the default deflection limit for a timber floor is set to L/300 of the clear span, which users can adjust to match project requirements. Beneath loadbearing walls or sensitive partitions, standard practice advises a limit of L/500 capped at 10 mm. Systematically checking the final deflection calculated with creep prior to finalising member depth prevents downstream operational disputes.

Floor vibrations: the simplified natural frequency criterion

A timber joist floor can fully satisfy the allowable L/300 deflection limit and remain perfectly stable at the ultimate limit state, yet feel very uncomfortable under normal foot traffic. A springy footfall feel and perceived bounce stem from natural frequencies that are too low combined with insufficient unit mass.

To tackle this issue without complicating initial sizing, the studio incorporates a simplified vibration criterion. The fundamental natural frequency of the floor is calculated from the cross-sectional bending stiffness and the total mass mobilised per span. This value is then compared against an indicative threshold of 8 Hz, which can be modified depending on the required acoustic and dynamic performance standards.

When the calculated frequency falls below this threshold, the studio displays a warning. On the construction site, several technical measures can resolve this dynamic softness without excessively oversizing the joist depth:

  • Reducing the joist spacing to increase the number of supports beneath the decking.
  • Installing solid strutting or rigid bridging at mid-span to tie adjacent joists together and distribute point loads.
  • Increasing the mass of the floor assembly using dense boarding or a dry levelling screed.

Carpenter responsibility and tool limitations

This online structural design studio is intended as a decision-support tool for preliminary sizing on the construction site, quantity take-offs, and technical feasibility reviews. Calculations rely on a simply supported beam model using linear elastic analysis: they do not replace a full three-dimensional finite element model or the analysis of structural interactions with the rest of the structural work.

Default material strengths, live loads, and densities are indicative and editable. For timber, the risk of lateral-torsional buckling is merely flagged and assumes continuous lateral restraint by the decking. Fire design checks are not handled for timber in this interface, and snow and wind load estimations rely on the altitude retrieved from the official swisstopo list of localities, with Δh and q_p0 provided for only eight catalogue localities; for others, values must be entered manually according to standard SIA 261.

Using this calculator does not exempt the contractor from obtaining a detailed calculation report and installation drawings prepared by a qualified civil engineer prior to ordering timber cutting or undertaking structural work. The tool runs 100% within your browser: no data is sent to or stored on external servers, and closing the tab resets all inputs immediately. To manage large-scale projects, organise execution variants, and export quantities to a contractor's quote, explore our professional tools on the Portail management platform, discover the bidding module on our Soumissions tender tool, or review advanced engineering and drafting services on our Plans Pro page.

Frequently asked questions

What live load should be used for a residential timber floor joist?

For a residential floor in Switzerland, the recommended live load according to standard SIA 261 is generally set at 2 kN/m². This value accounts for standard domestic furniture and occupants. It is added to permanent loads comprising the self-weight of the joists, decking, insulation, and ceiling. In the calculator, this initial value can be adjusted to match specific project specifications.

How do you choose between solid timber C24 and glulam GL24h?

Solid softwood C24 is well-suited for standard spans and conventional sawn dimensions. Beyond a certain clear span, or when available depth is limited by ceiling height, glued laminated timber GL24h or GL28h is recommended. It delivers higher dimensional stability, superior mechanical strength, and minimises long-term creep deformation over larger spans.

Why is the final deflection calculated with creep larger than the instantaneous deflection?

Timber is sensitive to sustained loads and ambient humidity conditions, defined by the service class under standard SIA 265. Under continuous permanent loading, initial deflection increases progressively over time due to creep. The calculator integrates this creep factor to determine the long-term final deflection, helping prevent cracked partitions and binding joinery.

Why does the calculator check the natural frequency of the timber floor?

A floor may easily carry design loads without risk of failure yet still produce an unpleasant bouncy feel under foot traffic. The studio calculates a simplified fundamental natural frequency and compares it to an indicative 8 Hz threshold. If the value falls below this, the floor may be excessively springy to walk on, indicating that bridging should be added or joist spacing reduced.

Are my calculation inputs saved if I close my browser?

No. The free tool operates 100% locally within your web browser. No calculation data is transmitted or stored on our servers. Closing or refreshing the page immediately resets all entered values. Printouts exported in free mode include a preliminary sizing watermark.

How do you size joist bearings on an existing masonry wall?

The compressive stress perpendicular to the grain exerted by the joist end on its support must not exceed the design bearing capacity of the timber according to standard SIA 265, nor the strength of the masonry according to standard SIA 266. The tool checks that bearing pressure does not exceed 1.25 times the design strength of the supporting masonry and indicates if a reinforced concrete padstone is required.

Does this calculation replace approval by a civil engineer?

No. The calculator provides preliminary structural estimates for conceptual design, technical feasibility, and quantity costings. It relies on a simplified single-span simply supported model. Prior to any execution on the construction site, wall opening, or structural installation, final execution drawings and structural calculations signed by a qualified civil engineer are mandatory.