Free software · 100% in your browser · no data sent

Vibrations of a timber floor in renovation: natural frequency of the joists and added screed

A timber floor can carry the load and still shake at every step: the studio calculates the natural frequency of the joists and compares it with an adjustable minimum.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

In renovation, a screed, tiles or a raised floor are often added on old joists. The strength remains sufficient, and so does the deflection, but the floor becomes springy: it vibrates when people walk, makes the dishes rattle and worries the occupants. Vibration comfort depends on the stiffness of the joists and on the mass they carry.

In the floor beam mode, the Site structural design studio calculates the first natural frequency f₁ = π / (2 L²) · √(E·I / m), with the mass taken from the permanent load and a quasi-permanent share of the imposed load (ψ₂ of the category of use). It compares it with an adjustable minimum frequency, 8 Hz by default, and shows an alert if it is too low. It is a simplified criterion to support decisions, which does not replace the calculation note signed by a civil engineer (SIA 260 to 267).

Worked example: 4.20 m C24 joists with an added screed

Apartment being renovated, solid timber C24 joists of 120 × 220 mm every 0.625 m, span 4.20 m. Existing floor 1.8 kN/m²; a 5 cm screed adds about 1.1 kN/m², giving 2.9 kN/m². Housing, category A: imposed load 2.0 kN/m², ψ₂ = 0.3. Modulus E of 11 000 MPa (C24) and 11 500 MPa (GL24h): default values of the studio, to be checked.

First natural frequency of a joist (simplified criterion, minimum 8 Hz, hand calculation)
OptionMass per joistf₁Verdict
C24 120 × 220, original floor153 kg/m7.79 Hzbelow 8 Hz
C24 120 × 220, screed added223 kg/m6.45 Hzbelow 8 Hz
C24 120 × 220, spacing 0.42 m150 kg/m7.87 Hzbelow 8 Hz
GL24h 140 × 260, spacing 0.625 m223 kg/m9.16 Hzabove
GL24h 160 × 280, spacing 0.625 m223 kg/m10.94 Hzabove

The mass per metre of joist is (g_k + ψ₂ · q_k) × spacing / 9.81: (2.9 + 0.3 × 2.0) × 0.625 = 2.19 kN/m, that is 223 kg/m with the screed. The second moment of area of a 120 × 220 section is 120 × 220³ / 12 = 1.065 · 10⁸ mm⁴, giving E·I = 1.17 · 10⁶ N·m². With L = 4.20 m, π / (2 × 4.20²) = 0.0890, and √(1.17 · 10⁶ / 223) = 72.5: the frequency drops to 6.45 Hz, against 7.79 Hz before the screed.

Reducing the spacing to 0.42 m lowers the mass per joist but is not enough (7.87 Hz): above all, depth is needed. A replacement or doubling joist in GL24h 140 × 260 reaches 9.16 Hz. In the tender, this is the difference between laying the screed as it is and strengthening the joists; a lighter screed or a dry screed is another option to put to the engineer.

The screed brings the frequency down from 7.79 to 6.45 Hz, below the 8 Hz minimum: section depth must be gained, the spacing alone is not enough.

3 frequent mistakes with floor vibrations

Relying on deflection alone

A deflection below L/300 says nothing about comfort. A floor can meet the deflection limit and still vibrate: check the natural frequency as well.

Adding weight without adding stiffness

A heavy screed adds mass without adding stiffness: the frequency goes down. That is the opposite of the effect sought.

Misjudging the state of old joists

Notched or decayed joists, or joists smaller than on the drawing, are less stiff. Record the real sections before entering the values.

Checking floor vibrations in 3 steps

  1. Choose the floor beam mode
    Enter the span, the tributary width (spacing), the old timber floor slab type or the real permanent load, and the category of use.
  2. Set the minimum frequency
    Keep 8 Hz or enter the value chosen by the engineer. The studio shows f₁ and the vibration alert if it is too low.
  3. Compare the solutions
    Change the family (C24, GL24h, GL28h), the section or the spacing and note the frequency obtained; export the sheet for the technical discussion.

Open the free studio →

What the free version does not do for vibration comfort

The studio's criterion is simplified: a single joist on two supports, with no contribution from the screed or from the floor across its width, and no check of the response to walking. The result is a decision aid that replaces neither the calculation note signed by a civil engineer nor a check on site. For the strength and deflection design of the joists, see the page on C24 and GL24h joists.

Soumissions prices the strengthening of the joists and the screed in your tender; the ERP tracks the works and the hours; Portail chantier keeps the calculation sheet and the photos of the existing state site by site.

Frequently asked questions

What natural frequency should a timber floor aim for?

The studio starts from 8 Hz, a common value for a simplified criterion. The value to use and the checking method are set by the engineer.

Why does a heavy screed make the floor vibrate more?

The frequency depends on the ratio between stiffness and mass. The screed adds mass without making the joists stiffer: the frequency goes down.

Do the joists have to be replaced?

Not always: doubling, sistering or extra joists in between may be enough. The studio lets you compare sections; the construction solution is up to the engineer.

Does the studio take the screed into account in the stiffness?

No: the screed is counted as mass. Composite action between timber and screed needs a specific calculation, outside the studio.