Point load on a beam: column or purlin carried, bending moment and support reactions

A storey column or a purlin bearing on the steel beam concentrates the load at one point: the moment and the reactions change with its position.

Open the free studio →

Free, no account: an indicative preliminary design, which does not replace the calculation note signed by an engineer.

In alteration work, a column from the storey above or a roof purlin sometimes lands right above the future opening. The beam no longer carries only the wall and the slab, spread along its length: it also receives a concentrated load. The maximum moment moves towards that point and the nearest support takes the largest share.

The Site structural design studio accepts one permanent point load P and its position from the left support, in addition to the distributed loads. It takes it into account in the M, V and deflection diagrams, in the reactions and therefore in the bearing padstones. It is a preliminary design to support decisions, which does not replace the calculation note signed by a civil engineer (SIA standards 260 to 267).

Worked example: 40 kN column on a 4.00 m steel beam

Opening in a load-bearing wall, design span 4.00 m. A column from the storey above transmits an ULS design load of 40 kN; the beam also carries 12 kN/m distributed (example values). Simple supports. Hand calculation to understand the studio's diagrams.

Moment and reactions under a point load P = 40 kN (span 4.00 m, hand calculation)
SituationLeft reactionRight reactionMaximum moment
P at 1.00 m from the left support30.0 kN10.0 kN30.0 kN·m
P at 1.50 m25.0 kN15.0 kN37.5 kN·m
P at midspan (2.00 m)20.0 kN20.0 kN40.0 kN·m
12 kN/m alone24.0 kN24.0 kN24.0 kN·m
P at 1.50 m + 12 kN/m49.0 kN39.0 kN60.0 kN·m

For a load P placed at distance a from the left support and b = L − a from the right one, the reactions are P · b / L and P · a / L, and the moment under the load is P · a · b / L. At 1.50 m: 40 × 2.50 / 4 = 25 kN on the left, 15 kN on the right, and 40 × 1.50 × 2.50 / 4 = 37.5 kN·m. The moment is largest when the load is at midspan, 40 × 4 / 4 = 40 kN·m; but the support near the column takes the most when the load moves towards it.

With the distributed load of 12 kN/m, the left reaction is 12 × 4 / 2 + 25 = 49 kN and the right one 24 + 15 = 39 kN. The shear force is zero at the column, where the moment is 49 × 1.50 − 12 × 1.50² / 2 = 73.5 − 13.5 = 60.0 kN·m, against 24 kN·m for the distributed load alone. In the tender, the point load may require a heavier section and a larger padstone on the column side.

A 40 kN column at 1.50 m raises the moment from 24 to 60 kN·m and loads the left support with 49 kN: the exact position of the column must be measured before choosing the beam.

3 frequent mistakes with a point load

Spreading the column load over the whole span

Turning 40 kN into 10 kN/m over 4 m gives a moment of 20 kN·m instead of 40 kN·m at midspan: the beam would be undersized by half.

Checking only the less loaded support

When the column is close to a support, that support takes most of the load. The padstone and the masonry on that side must be checked for this reaction.

Ignoring the propping of the column during the works

The upper column must be supported during cutting and placing. Temporary propping is planned under it, not only along the wall.

Entering a point load in the studio in 3 steps

  1. Describe the beam and the distributed loads
    Choose the mode, the span, the storeys carried, the slab, the category of use and, if needed, the roof.
  2. Add the point load
    Enter P (permanent load, in kN) and its position from the left support; it must be positive and inside the span.
  3. Read the diagrams and the supports
    Open the M, V and deflection diagrams view and the padstone card: compare both supports and export the sheet.

Open the free studio →

What the free version does not do with point loads

The studio accepts a single permanent point load, on a beam with two simple supports, with no variable point load and no continuous support. It checks neither the upper column nor its load path, nor the local introduction of the load into the beam (stiffeners). It is a decision aid that does not replace the calculation note signed by a civil engineer. For a standard opening without a concentrated load, see the page on the 3 m opening with an HEB.

Soumissions prices the beam, the padstones and the propping of the column; the ERP tracks the hours and the hire of props; Portail chantier keeps the sheet and the construction drawing site by site.

Frequently asked questions

Where is the moment largest under a point load?

Under the load, and it is largest when the load is at midspan: P · L / 4. With a distributed load as well, it usually stays at the column.

Does the studio accept several point loads?

No, a single permanent point load. Several columns or purlins need a calculation by the engineer.

Is a larger padstone needed on the column side?

Often yes: the reaction at that support increases. The studio checks each support and suggests a padstone or a frame if necessary.

Is the column load a permanent load?

The studio treats it as permanent. If it includes a share of imposed load or snow, the engineer must split the two.