Construction Site Structural Studio: load-bearing wall opening, steel and timber beams

Select a steel beam or timber section to open a load-bearing wall, support a floor or purlin: climatic actions, loads, utilisation ratio, deflection, padstones, props, fire-rated encasement and quantity survey.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

How to size a HEB, HEA or IPE beam according to Swiss SIA 260, 261 and 263 standards

To open a load-bearing masonry wall on a French-speaking Swiss construction site, the method relies on a clear process: load rundown, action combinations, and verification of hot-rolled steel sections. The studio analyses the simply supported beam using linear elastic static calculation. You begin by entering the dead loads of the wall above, the floors supported across multiple storeys from zero to six levels with their left and right spans, as well as any roof load.

Combinations at the ultimate limit state (ULS) and serviceability limit state (SLS) are based on the SIA 260 standard, incorporating storey reduction factors and combination factors ψ specific to the building use: residential, offices, meeting rooms, retail, or storage areas. Climatic actions are derived from the SIA 261 standard.

For steel according to the SIA 263 standard, the tool analyses HEA, HEB, IPE, and HEM sections hot-rolled in S235 or S355 grades. It checks the cross-section class, shear resistance, bending with moment-shear interaction, and lateral-torsional buckling risk. The exact deflection includes shear deformation using the Timoshenko beam model. To avoid cracks in the partitions above, the studio applies a default deflection limit of L/500 capped at 10 mm, adjustable to project data. The system compares the stress ratio to 100% of the design value and indicates whether the resulting value is less than or equal to, or greater than that limit.

Omissions that erode an SME's margin on a load-bearing wall removal

Costly on-site mistakes often start with underestimating the self-weight of steel members and their installation within an inhabited space. Many contractors quote the supply of the steel section without anticipating lifting equipment or handling up the staircase. As soon as a beam exceeds 100 kg, manual handling becomes hazardous and requires a beam lifter or hoisting gin. Beyond 250 kg, placing a single beam as underpinning turns into a financial black hole if access is restricted.

The studio flags this threshold and allows you to switch to twin beams. Two lighter sections installed side-by-side as underpinning avoid heavy plant hire and allow manual transport piece by piece. Another frequent oversight concerns ancillary works: heavy-duty temporary propping on both sides with load transfer down to the basement, diamond wall sawing, final dry-pack packing under the ceiling with non-shrink mortar, and fire protection encasement.

On a thick rubble or clay brick wall, omitting concrete spreader padstones on the assumption that the section is strong enough leads to construction site shutdowns during inspections by the civil engineer. The best practice to avoid these margin losses is using the automated quantity takeoff right from the tendering phase to list every technical item before finalising the unit price.

Contractor liability in Switzerland: works contract, SIA 118 standard and civil engineer sign-off

In French-speaking Switzerland, opening a load-bearing wall directly impacts the overall structural stability of the building. The rules governing works contracts under the Code of Obligations (CO) (Code des obligations) as well as the provisions of standard SIA 118 govern the contractor's duty of care and warning. In the event of structural damage or partial collapse, the provisions of the Swiss Criminal Code regarding the rules of the art of building reiterate the safety obligation incumbent upon all parties involved.

The studio provides decision support for pre-sizing, tender pricing, and preliminary feasibility studies. It by no means replaces the work of a civil engineering consultancy. Any permanent structural opening requires a comprehensive structural calculation report and official execution drawings signed off by a civil engineer before wall sawing begins.

The contractor's liability remains fully engaged on the construction site. The professional must verify on site the exact composition of the load-bearing walls, slab span directions, the potential presence of services ducts, and the actual condition of the masonry prior to any demolition, even for seemingly minor interior works.

Snow, wind and altitude: SIA 261 standard actions in the studio

The design of a lintel or roof purlin directly depends on the altitude of the construction site. Standard SIA 261 defines the characteristic ground snow load using the formula:

s_k = max([1 + (h₀/350)²] · 0.4 ; 0.9) with h₀ = h + Δh.

The studio loads the official swisstopo locality directory: by searching a postal code or name, you retrieve the ground altitude at that location. For eight standard localities (Lausanne, Geneva, Sion, Verbier, Bulle, La Chaux-de-Fonds, Zurich, and St. Moritz), the local adjustment Δh and the reference wind velocity pressure q_p0 are also provided. For any other locality, Δh and q_p0 default to 0 m and 0.9 kN/m²: you must verify them using SIA 261 maps and adjust the altitude if the construction site is higher than the town centre.

As soon as the altitude exceeds 2000 m, an orange alert appears in the interface to highlight severe mountain conditions. For roofs, the studio applies the relevant shape coefficient based on pitch and the presence of snow guards. The peak wind velocity pressure q_p(z) also accounts for the selected terrain category (urban area, open countryside, or exposed mountain terrain).

Steel or timber, single or twin profile: selecting the cross-section

The choice of material depends on the headroom available under the slab and the installation method. For timber roof and floor structures, the studio calculates timber according to the SIA 265 standard for solid timber C24 as well as glued laminated timber GL24h and GL28h. It verifies bending, shear, compression perpendicular to the grain at supports, and final deflection including creep based on the service class. The allowable deflection for a floor or purlin defaults to L/300.

For steel lintels under load-bearing walls according to the SIA 263 standard, the "Find minimum profile" function scans the HEA, HEB, IPE, and HEM series to identify the lightest profile with a stress ratio of 95% or less. The tool also provides a comparative analysis of the various series and a design chart for the minimum section based on the clear span.

In old thick masonry walls, installing two twin profiles sequentially prevents underpinning collapse: a first chase is cut out across half the wall thickness to insert the first beam, it is dry-packed with mortar, and the opposite side is then processed before knocking through the remaining masonry core.

Bearings, concrete spreader padstones and goalpost frames: existing masonry

The load carried by the lintel must be transferred into the existing jambs in accordance with the rules of the SIA 266 standard. The tool offers five masonry types with editable design strengths. Direct compressive stress under the bearing is compared against 1.25 times the design strength of the masonry to account for local confinement.

When bearing stress exceeds this threshold, the studio automatically sizes a C25/30 reinforced concrete spreader padstone, defining its length and depth. The padstone spreads the support reaction across a sufficient masonry area.

Two geometric conditions require abandoning a simple masonry bearing:

  • If the calculated padstone length exceeds 600 mm;
  • If the remaining masonry jamb width on either side of the opening is under 40 cm.

In these specific cases, the studio switches to a steel goalpost frame solution with two steel columns, whose buckling stability is verified about the minor axis.

From sizing to takeoff: props, sawing, demolition, beam, packing and fire-rated encasement

Once the sections are defined, the studio generates a detailed bill of quantities without unit prices, clearly displaying the calculation formulas for each construction site operation. Heavy temporary propping is sized based on one line of props every 0.80 m on each face of the wall to be opened.

The takeoff then includes:

  • Linear or surface diamond wall sawing;
  • Controlled demolition and rubble removal to a licensed dump;
  • Concrete volume for C25/30 load-spreading padstones;
  • Supply, cutting, and erection of the steel or timber beam;
  • Non-shrink dry-pack packing under the slab;
  • EI30 or EI60 fire protection boxing for steel beams (VKF/AEAI directives, RF1 materials);
  • Civil engineer inspection fees.

Four drawings complete the design file: the propped wall elevation showing deflections scaled by 50x, shear force, bending moment and deflection diagrams, the cross-section with fire protection casing, and the bearing detail with its concrete padstone.

What the free version does not do and transitioning to Soumissions, ERP or Portail

The free version runs 100% inside your computer or tablet web browser. Nothing is sent to a server and nothing is saved across the network. The tool uses no browser storage: refreshing or closing the page clears your entries. Printed copies or PDF data sheets carry an Art Construction watermark, and the CSV export references the free version.

This free version contains no unit prices, nor any codes or item texts from the ACIP database. Sizing is limited to a simply supported beam using a linear elastic static model, without 3D analysis or overall building interaction modelling. Imposed loads, slab weights, masonry bulk densities, and timber strengths are editable default values, not cross-referenced against the standard, which you must confirm prior to use. Timber lateral-torsional buckling is merely indicated, timber fire resistance must be verified separately, inclined purlins are not checked for biaxial bending, and concrete padstones do not include reinforcement detailing.

To permanently save your project files by folder, you can switch to our Portail or utilise our management modules. To automatically convert these quantities of lintels, sawing, and props into comprehensive client quotes priced with the cantonal ACIP database, explore our Soumissions software or our complete package at notre offre logicielle.

Frequently asked questions

Does the online calculator replace the services of a civil engineer?

No. The studio serves as a preliminary sizing tool to prepare quotes and check technical feasibility. For any load-bearing wall opening, Swiss regulations require structural calculations and execution drawings endorsed by a civil engineer prior to starting demolition works.

Are my calculations and dimensions saved if I close my browser?

No. The free version runs strictly locally within your browser's RAM. No data is sent to a server or stored in your cache. As soon as you close or refresh the tab, all entered data is cleared.

How can I obtain pricing for steel sections and labour?

The free version generates a material and labour quantity takeoff without any unit prices. To apply cantonal ACIP database reference prices and produce a complete tender submission, pricing is handled via our server-connected professional modules.

Why use twin beams instead of a single HEB profile?

On thick retrofit walls, a single profile can weigh over 250 kg and prove impossible to lift without heavy machinery. Twin beams allow sequential installation across half the wall thickness, reduce the handled component weight, and limit collapse risks during channelling.

How does the studio verify masonry under beam bearings?

The studio compares direct bearing stress to 1.25 times the design strength of the selected masonry (SIA 266 standard). If the stress exceeds this limit, it sizes a C25/30 reinforced concrete padstone or suggests a steel frame if the masonry bearing remains inadequate.

Why is allowable deflection under a load-bearing wall set at L/500 or 10 mm?

A lintel supporting a load-bearing wall carries masonry and partitions on upper floors. Excessive deflection leads to cracking in upper storeys and causes doors to stick. The studio applies this strict limit of L/500 capped at 10 mm to protect the supported structures.

How are snow loads calculated for unlisted municipalities?

The studio imports the official swisstopo locality database and retrieves the altitude of the chosen postal code. Δh and q_p0 are prefilled for only eight standard localities; for any other municipality they default to 0 m and 0.9 kN/m², and must be retrieved from SIA 261 maps.