About this tool
3-metre opening: what the studio calculates for this example
To prepare for opening a load-bearing wall over 3.00 m, the structural studio loads a typical construction site configuration: a clear opening of 3 metres in a 20 cm clay brick wall, carrying one floor above with a reinforced concrete slab, beneath an S235 steel HEB beam resting on two simple supports.
The tool assesses the full load rundown according to the principles of standard SIA 260. You can adjust the number of supported levels (from 0 to 6 storeys), the span of adjacent slabs to the left and right, the presence of a roof with climatic actions from standard SIA 261, or a permanent point load. For snow and wind actions, the altitude is retrieved from the official swisstopo list of localities; the Δh adjustment and the dynamic wind pressure q_p0 are populated for eight localities from the guide (Lausanne, Geneva, Sion, Verbier, Bulle, La Chaux-de-Fonds, Zurich, and St. Moritz). For any other municipality, you can obtain them from the maps in standard SIA 261. An orange alert appears as soon as the altitude exceeds 2000 m.
The calculation applies the model of a beam on two simple supports based on Timoshenko beam theory, taking into account shear deformation in addition to bending. The software plots the bending moment M, shear force V, and deflection w diagrams. The checks compare the internal forces against the design values for steel according to standard SIA 263 (HEA, HEB, IPE, HEM sections) or timber according to standard SIA 265 (C24, GL24h, GL28h). The studio indicates whether the capacity utilization ratio is less than or equal to 100%, without using absolute qualifiers.
Which HEB beam for 3 metres: utilization ratio and deflection limits against cracking
Selecting a steel section to bridge 3 metres is not just a matter of ultimate resistance at ultimate limit states (ULS). When creating an opening beneath masonry, the governing criterion is frequently deformation at serviceability limit states (SLS). Excessive bending causes visible defects in the partitions and finishes on the floor above.
To protect the supported masonry, the default deflection limit is set to L/500, with an automatic cap at 10 mm. For a floor beam or a roof purlin, the studio applies a standard limit of L/300. This value remains entirely customizable according to project requirements.
The "Find minimum section" button scans the selected rolled section family and retains the lightest beam whose utilization ratio remains below or equal to 95%. For openings in thick walls during renovations, the studio also lets you switch to paired sections: two steel beams laid side by side, facilitating manual handling under existing ceilings.
Visual indicators highlight practical site handling constraints:
- Handling alert as soon as the section exceeds 100 kg, recommending the use of a beam lifter or a workshop crane.
- Specific alert beyond 250 kg, encouraging the use of paired sections installed one after the other.
- Check of shear force and moment-shear interaction according to standard SIA 263.
- Check of lateral-torsional buckling risk for the compression flange.
Bearing on clay brick: when a concrete padstone becomes necessary
Transferring support reactions into the existing masonry is the most critical aspect of creating an opening in a load-bearing wall. By concentrating several tonnes over a beam flange width that is often under 20 cm, local compressive stress easily exceeds the bearing capacity of the supporting substrate.
The studio integrates masonry parameters in accordance with standard SIA 266. Five masonry types are offered, with editable design strengths. The software compares direct bearing stress to 1.25 times the design strength of the masonry. As soon as this value is exceeded, a reinforced concrete C25/30 spreader padstone is automatically dimensioned in length and height to spread the load over an adequate surface.
Two particular situations trigger a redirection towards a complete underpinning frame structure:
- If the calculated concrete padstone length exceeds 600 mm.
- If the remaining pier width between the opening and the wall corner or an adjacent aperture is less than 40 cm.
In both configurations, the studio suggests switching to a steel portal frame fitted with two vertical steel columns, thereby preventing crushing or shearing of the residual masonry pier.
Propping, sawing, and dry packing: line items the construction site overlooks
A costly mistake on site is starting diamond wall sawing as soon as a few simple props are placed beneath the adjacent floor slab. A suspended slab does not carry the loads of the wall above: without through-propping directly beneath the masonry itself, the wall decompresses, leading to stepped cracks in the bricks on the upper floor.
The correct method is to install heavy temporary propping on both sides of the masonry, passing through the wall with steel or timber needles to relieve the wall drop before the first cut. A row of props is typically spaced every 0.80 m along the work area.
The studio produces an unpriced bill of quantities listing the precise items essential for preparing a quote:
- Heavy temporary propping on both sides with load-transfer needle beams.
- Wall sawing with diamond discs and corner core drilling.
- Careful demolition, sorting, and removal of masonry rubble.
- Formwork, reinforcement, and pouring of reinforced concrete spreader padstones.
- Supply, hoisting, and installation of the steel beam (or paired beams).
- Dry packing under the masonry using high-strength non-shrink mortar.
- Fire-resistant cladding for the beam using RF1-rated boards (EI30 or EI60 in accordance with VKF regulations).
- Structural engineering design services and fee for the structural calculations.
Liability before sawing: civil engineer and duty to notify
The member sizing provided by the structural studio is a technical preliminary sizing tool intended for feasibility studies, option appraisal, and quantity estimation for tenders. It does not under any circumstances replace full engineering services.
Contractually and legally, opening a structural element alters the overall load rundown of the building. The general rules of the Code of Obligations (CO) impose a duty to notify (devoir d'avis) and standard of care on the contractor. Any cutting of a load-bearing wall strictly requires final structural calculations and execution drawings prepared and signed by an independent civil engineer before demolition begins. The contractor's liability remains engaged on the construction site.
The sizing provided is based on a linear elastic structural model of a beam on two simple supports. It does not simulate three-dimensional indeterminate building interactions or overall dynamic behavior under earthquakes in accordance with structural engineering standards. On-site visual inspection, prior masonry test pits, and checking existing reinforcement remain imperative.
What the free version does not do for a 3-metre opening
Access to the structural studio on this page is free of charge, with no prior registration and no account creation. The calculation runs 100% in your web browser: no project data is sent to an external server, nothing is logged in a remote database, and no persistent memory is retained. If you close or refresh the page, all entered data is cleared. Printing the assessment sheet includes an Art Construction watermark, and the CSV export includes a mention of the free tool.
Certain technical limitations apply to the online tool: section properties are derived from nominal dimensions and must be verified against rolling mills' catalogues; imposed loads, materials, and brick strengths are editable default values; the concrete padstone calculation provides geometric dimensions without a rebar schedule; and only eight Swiss localities have their Δh and q_p0 populated for climatic actions.
To integrate these calculations into a comprehensive business management workflow, the paid version offers advanced professional features:
- Cloud-based calculation saves per construction site with version history archiving in the Portail.
- Instant pricing of demolition, padstone, and steel installation items via integration with the ACIP cost database.
- Comprehensive preliminary sizing report without watermarks, customized with your company details, ready for the technical submittal.
- Collaborative team working between the technical design office and site supervision via the Soumissions application.
- Direct handover from preliminary sizing to detailed work quantities for ordering steel and preparing cutting lists. To explore these options, view our offre.
Frequently asked questions
What is the difference between an HEA beam and an HEB beam when opening a 3 m wall?
An HEB section has thicker flanges and a thicker web than an HEA for the same nominal depth. For a 3-metre span, the HEB provides higher stiffness and reduces deflection under heavy loads more effectively. This allows you to minimize structural depth below the ceiling compared to an equivalent HEA section.
How do you choose between a single section and paired sections?
In thick existing walls, handling a solid steel section weighing over 150 kg is difficult without heavy lifting gear. Paired sections allow you to cut a preliminary chase over half the wall thickness, install the first beam, pack it with mortar, and then repeat the process on the opposite face, reducing the risk of structural settlement.
What is the minimum length required for a concrete padstone?
The padstone length directly depends on the transferred load and the compressive strength of the existing masonry according to standard SIA 266. In practice, the padstone must at least match the bearing width of the beam. If the required calculated length exceeds 600 mm, it is advisable to switch to a portal frame with steel columns.
Why is deflection limited to L/500 and 10 mm for a load-bearing wall?
Unlike a roof structure where more flexible deflection is acceptable, brick or concrete masonry tolerates very little movement without cracking. Capping deflection at L/500 with a maximum of 10 mm prevents aesthetic and structural damage to partitions, tiling, and masonry on the floors above.
How do you check the fire resistance of an installed HEB beam?
Unprotected steel loses its load-bearing capacity under elevated temperatures. The studio calculates the clearance needed for fire-resistant cladding rated RF1 according to VKF guidelines, with typical requirements of EI30 or EI60. This board or spray cladding must encase the exposed downstand of the steel section.
Can I use the studio results directly to carry out site work?
No. The studio provides preliminary structural sizing as a decision-making aid for your initial studies and tenders. Opening a load-bearing wall impacts the structural stability of the building: you must have the load rundown, padstones, and propping scheme verified by a chartered civil engineer before the first cut with an angle grinder.
Are my entries saved if I close the browser?
In the free version, the calculation runs entirely in your browser's temporary memory. Nothing is sent or saved on our servers. As soon as you close or refresh the tab, your parameters are lost. To save your options and calculation notes per construction site, use the Portail with the Pro version.