About this tool
Comparing HEB, HEA, IPE and HEM for identical loads
To carry an identical load descent over a given span, each rolled section family features distinct geometrical and mechanical properties according to standard SIA 263. The HEB section offers broad flanges and high overall stiffness. For an equal depth, it withstands greater forces than a HEA section, whose flanges and web are thinner in order to reduce the total steel weight. The IPE section has a tall, narrow shape. It uses material efficiently to take up a bending moment about its major axis, but its narrow width makes it more susceptible to out-of-plane lateral-torsional buckling.
The HEM section includes the heaviest and most massive sections. In building renovation, it is primarily used when headroom is severely limited by room clearances and a high steel cross-section must be concentrated within a reduced vertical space. For an example span set at 3.50 m, the structural module analyses the minimum section of each series in S235 or S355 steel grades. It checks the bending moment, shear force alongside the moment-shear interaction, as well as the risk of lateral-torsional buckling. Two twin profiles placed side by side can also widen the bearing area under a thick load-bearing wall made of existing masonry.
Reading the chart: minimum profile according to clear span
The chart generated in the browser ranks the minimum section required to bridge clear spans ranging from 2 to 6 metres. For each span increment, the tool reviews the HEB, HEA, IPE and HEM series to select the lightest section with a utilisation ratio remaining at or below 95% of the design capacity. This calculation is based on the assumption of a simply supported beam analysed using linear elastic static calculation, including shear deformation in accordance with the Timoshenko beam model.
Reading the chart directly helps the site manager or quantity surveyor identify profile size changes as the span increases. For an identical line load, the bending moment increases with the square of the length, whilst the elastic deflection varies with the fourth power of the span. Consequently, the step up from one section to the next accelerates beyond a 4-metre opening. The chart displays the associated support reactions, making it possible to anticipate the pressure transferred onto wall heads or end pillars as early as the preliminary pricing phase.
Why a lighter IPE is not always more economical
When simply considering the weight per linear metre, an IPE section often appears to be the most cost-effective choice in terms of raw material. However, on the construction site, this weight saving comes with construction constraints that affect the overall cost of the work. When opening up a masonry load-bearing wall, an IPE section has a narrow flange. This reduced width decreases the seating area of the wall preserved above the opening and complicates dry packing with non-shrink mortar beneath the remaining bricks or rubblestones.
Furthermore, the substantial height of an IPE reduces the available headroom and sometimes requires wall sawing higher up, increasing the volume of demolition and rubble removal. The narrowness of the web increases the risk of lateral-torsional buckling during installation prior to pouring slabs or installing lateral bracing. Conversely, a HEB or HEA section offers a wide, stable platform that more readily supports existing masonry. Using twin profiles also allows each member's weight to remain below manual handling limits or reduces the need for heavy lifting equipment on restricted upper floors.
Deflection or resistance: limiting factors according to span
Sizing a steel beam depends on two major criteria set out in standards SIA 260 and SIA 263: ultimate limit state (ULS) resistance and serviceability limit state (SLS). On short spans, the ultimate limit state is usually decisive. The steel cross-section must withstand the maximum bending moment and shear force at the supports, verifying the cross-section class to prevent local buckling.
On medium and long spans, the maximum permissible deflection almost systematically becomes the governing factor. For a load-bearing wall opening, the deflection limit is set at L/500 with an absolute ceiling of 10 mm. This tight threshold is designed to prevent damage to upper floors, such as rendering cracking, sticking door and window frames, or partition wall shearing. For a floor beam or roof purlin, the standard limit is generally set at L/300. A beam may therefore exhibit a utilisation ratio below 100% under pure bending stress, yet be rejected by the tool because its deflection exceeds the serviceability limit specified for the structure.
From example loads to your loads: parameters to adjust
The default chart illustrates a preconfigured load descent. To tailor the outcome to your specific project, several parameters can be modified directly within the interface:
- Premises occupancy and live loads: select the occupancy category (residential, offices, assembly, retail, storage) to apply the ψ factors and action combinations specified in standard SIA 260.
- Floors and walls supported: specify the number of storeys (from 0 to 6), the slab tributary widths on the left and right, the floor type, as well as the height and type of the supported masonry.
- Climatic actions according to standard SIA 261: search for your locality by postcode or name to obtain the altitude from swisstopo's official list; the snow adjustment Δh and wind pressure q_p0 are pre-filled for eight locations (Lausanne, Genève, Sion, Verbier, Bulle, La Chaux-de-Fonds, Zürich, St. Moritz) and default to 0 m and 0.9 kN/m² for others: enter them based on regional maps. A visual alert appears above an altitude of 2000 metres.
- Material quality: adjust the steel grade (S235 or S355), or switch to timber (solid timber C24, glulam GL24h or GL28h) according to standard SIA 265, taking into account the service class for creep.
- Strength of supporting masonry: adjust the design value of the support in line with standard SIA 266 to confirm the dimensions of the C25/30 reinforced concrete distribution padstones.
What the chart does not replace
The chart and calculator provide a structural estimate for feasibility studies and price quotes. They are based on a linear elastic analysis of an isolated simply supported beam. They do not account for global 3D building structural analysis, nor load redistributions caused by creating an opening in an existing load-bearing wall.
On the construction site, the capacity of the supports depends on the actual condition of the masonry, the presence of historical cracks, and rebar arrangements. The distribution padstones calculated by the module provide geometric length and height, but do not supply a detailed reinforcement schedule. Likewise, if the remaining wall return is less than 40 cm or if the padstone exceeds 600 mm, the design must switch to a complete steel portal frame. Any load-bearing wall opening requires structural calculations and execution drawings approved by a structural engineer prior to wall cutting. This free pre-sizing tool runs entirely in your browser without saving or sending data. To include these quantities in a complete quote or oversee contractor operations, explore the Soumissions modules or centralise your construction sites on the Art Construction Portail.
Frequently asked questions
How to choose between a HEA and a HEB section for an opening?
A HEA section is lighter but has a greater depth for equivalent load-bearing capacity. A HEB section provides higher resistance and inertia for the same depth, which limits ceiling drop. If the headroom beneath the slab is tight or floor loads are heavy, a HEB is often chosen. For moderate loading with ample clear height, a HEA helps reduce the total weight of steel to be handled.
What deflection limit applies beneath a load-bearing wall?
For a beam beneath a masonry load-bearing wall, the maximum allowable deflection is set at L/500 of the span, capped at an absolute maximum of 10 mm. This strict requirement prevents render cracks, shear failure in mortar joints, and binding of windows or doors on upper floors. For an ordinary floor or roof without supported masonry, the standard allowance is generally L/300.
When should twin profiles be specified instead of a single beam?
Twin profiles are recommended when the wall to be opened is thick, ensuring adequate bearing under both faces of the masonry. They also offer a practical solution on construction sites with awkward access: lifting two separate 120 kg sections is much easier than moving a single massive 240 kg beam without heavy lifting gear.
Why check the strength of the masonry beneath the bearings?
The total load carried by the beam is concentrated onto its two bearing zones. According to standard SIA 266, the compressive stress transmitted to the existing masonry must not exceed 1.25 times its design strength. If this limit is exceeded, the wall is at risk of localised crushing. Casting a reinforced concrete distribution padstone or installing vertical steel posts then becomes mandatory.
How are snow and wind climatic loads calculated?
The module applies the formulae from standard SIA 261. The ground snow load is derived from the site altitude and the local adjustment factor Δh. It is subsequently adjusted by a shape coefficient based on roof pitch. The dynamic wind pressure depends on the base value q_p0 and surrounding terrain roughness.
Is my calculation data sent to or stored on a server?
No. In this free version, all algorithms run 100% inside your web browser. No entered data, quantities or drawings are transferred to a server or kept in browser memory. Refreshing the page or closing the tab clears all your input. Export prints feature an Art Construction watermark.
Does this pre-sizing tool replace a project designed by a structural engineer?
No. The calculator is a technical aid for assessing feasibility and preparing tender take-offs. It replaces neither an on-site physical inspection of the existing structure, nor comprehensive design calculations, nor reinforcement and installation drawings approved by a qualified structural engineer before opening masonry on the construction site.