Take-off for heating, ventilation, plumbing and electrical work from a PDF plan (CFC 23 / 24 / 25)

Place one marker per appliance, follow the pipes by the metre and get a table per layer, ready to carry over into your building services quote.

Open the free studio →

Free, no account: your files stay in your browser.

The electrician, the plumber or the heating engineer prices two families of quantities: items to count (sockets, switches, lighting points, radiators, sanitary appliances) and lengths to measure (pipes, ducts, cable trays). On a crowded services drawing, counting with a highlighter soon leads to duplicates or omissions.

The Take-Off & Métré studio opens the PDF plan in the browser, without uploading the file. Its unit counter places numbered markers sorted by category: each symbol you click is marked on the plan and added up in the table. Polylines follow the pipe runs once the scale is calibrated, one layer per CFC code keeps the installations apart, and everything exports to CSV.

Worked example: MEP count and take-off for a small block of four flats

A block of four identical flats, one per storey. Services drawings as PDFs at 1:50. The count is done on one flat, then carried over to the other three after checking that the plans are identical.

Marker count and lengths measured on the services drawing
ItemUnitPer flatFour flats
Socketspc28112
Switchespc1456
Lighting pointspc1664
Radiatorspc624
Sanitary appliancespc728
Plumbing pipes measured in planm38.50154.00

The five categories of markers total 71 items per flat (28 + 14 + 16 + 6 + 7), i.e. 284 items for the building. The plumbing pipes followed as a polyline come to 38.50 m per flat, so 154.00 m. The plan does not show the vertical parts: three risers over four storeys of 2.80 m add 3 × 4 × 2.80 m, i.e. 33.60 m. The theoretical length comes to 187.60 m.

An allowance of 10% for fittings, drops to appliances and offcuts is taken here as an assumption, to be adapted to your practice and to the specification: 187.60 m × 1.10 gives 206.36 m, rounded up to 207 m. The count feeds the items priced per piece, the length the items priced per metre.

Key figures: 284 items counted and 187.60 m of theoretical pipework, raised to 207 m with a 10% allowance stated as an assumption.

3 common mistakes in an MEP and electrical take-off from plans

Counting the same symbol twice

On a dense plan, a socket is easily counted twice, or not at all. Numbered markers leave a trace on every symbol you have clicked: a glance is enough to spot those without one.

Forgetting vertical lengths

A floor plan only shows the horizontal runs. Risers and drops to the appliances are calculated separately, with the storey height read from the section, and added to the length measured.

Measuring on a schematic diagram

A schematic diagram is not to scale: a length measured on it is wrong. Linear take-off is done on a dimensioned construction drawing, after calibrating on a known dimension.

How to count and measure on a PDF services drawing in 3 steps

  1. Open the plan and prepare the layers
    Drop the PDF into the studio, calibrate the scale on a known dimension and create one layer per CFC code: electrical, heating, ventilation, plumbing. Then prepare the counter categories: sockets, switches, lighting points, radiators, appliances.
  2. Place the markers and follow the pipes
    Click each symbol to place a numbered marker in the right category. Then follow the pipes and cable trays as polylines: lengths add up by layer. Work room by room, in the same order on every storey.
  3. Check the totals and export to CSV
    The summary table gives the number of markers per category and the lengths per layer. Compare it with the list of appliances in the specification, export to CSV, then add the vertical lengths and your allowance in your spreadsheet.

Open the free studio →

What the free version of the MEP take-off does not do

The studio does not recognise symbols: counting remains manual, one marker per click. It measures in plan and adds neither heights nor drops. It does not size any installation and does not check technical requirements. Export is in CSV with the Art Construction notice, and the session is erased when the tab is closed.

Soumissions carries the quantities into the items of a quote, with the price database and files per site. Plans Pro (2D/3D) saves layers and measurements, opens up teamwork and provides exports without a watermark.

Frequently asked questions

Can sockets and light fittings be counted on an architect's plan without an electrical drawing?

Yes, if the symbols are shown on it. Otherwise, place your markers based on the specification or on your own assumptions of equipment per room, and state in the quote that the quantities rest on those assumptions.

How do you allow for heights in pipes and cables?

Measure the horizontal runs on the plan, then add the vertical lengths separately: number of risers or drops multiplied by the height read from the section. This addition is prepared in the spreadsheet.

What allowance should be planned for offcuts and fittings?

There is no single value: it depends on the material, the route and your installation method. The example takes 10% as an assumption. Use the value drawn from your completed jobs and state it in the quote.

Is the marker count exported together with the lengths?

Yes. The CSV export reproduces the summary table: number of units per category, lengths and areas per layer. The file opens in a spreadsheet and carries the Art Construction notice.