Take-off for structural work, masonry and reinforced concrete (CFC 211) from a PDF plan

Take slab areas, lengths of load-bearing walls, concrete volumes and formwork areas straight off the PDF plan, with nothing to install.

Open the free studio →

Free, no account: your files stay in your browser.

In structural work, the quote hinges on a few heavy quantities: cubic metres of concrete, square metres of formwork, running metres of load-bearing walls. An error of a few centimetres on a thickness, or a forgotten slab opening, is multiplied by the whole floor area.

The Take-Off & Métré studio opens the PDF plan in the browser; the file stays on your computer. You calibrate the scale, draw the slabs as polygon areas while subtracting the openings, measure the walls as cumulative lengths and enter a height to obtain wall areas and volumes. Each measurement goes into a layer with the code CFC 211.

Worked example: structural take-off for a house, reinforced concrete slab and walls

A house in French-speaking Switzerland, ground-floor plan at 1:50. To be priced: the 22 cm slab over the ground floor and the 20 cm reinforced concrete load-bearing walls, storey height 2.60 m. The slab measures 96.00 m² with a stair opening of 4.20 m²; the walls total 38.50 m.

Structural take-off measured on the PDF plan (CFC 211)
ItemCalculationQuantity
Slab, net area96.00 − 4.2091.80 m²
Slab, concrete (22 cm)91.80 × 0.2220.20 m³
Walls, area of one face38.50 × 2.60100.10 m²
Walls, concrete (20 cm)7.70 × 2.6020.02 m³
Wall formwork, both faces100.10 × 2200.20 m²
Total reinforced concrete20.20 + 20.0240.22 m³

The slab is drawn as a polygon of 96.00 m²; the stair opening, linked to it as a void, brings the net area down to 91.80 m². With a height of 0.22 m, the studio shows 20.196 m³, rounded to 20.20 m³. The footprint of the walls is 38.50 × 0.20 = 7.70 m², which gives 20.02 m³ over a height of 2.60 m. The length of 38.50 m multiplied by that height gives 100.10 m² per face, hence 200.20 m² of formwork.

The openings in the walls have not been deducted here: the rule is set in the studio (no deduction, all openings, or above a threshold) and must be confirmed against the specification and the measurement practice of the trade. The slab soffit formwork covers 91.80 m².

For this storey, the take-off gives 40.22 m³ of reinforced concrete, 200.20 m² of wall formwork and 91.80 m² of slab formwork.

3 common mistakes in a structural work and reinforced concrete take-off

Measuring without checking the scale of the plan

A PDF that was reduced when printed, or scanned, is no longer at the 1:50 shown in the title block. A scale that is 3% out distorts the slab area by about 6%, and the concrete volume with it. Calibrate on a dimension written on the plan.

Forgetting slab openings or counting them twice

Stairs, service shafts, chimney: each opening removes concrete and slab formwork, but adds edge formwork. Linked to the slab as voids, they remain visible in the take-off.

Confusing wall length with the area to be formed

A wall is formed on two faces, and the stop ends are not included in the centre-line length. State in the description whether the quantity is for one face or two, and measure the walls by thickness.

How to do a structural work take-off (CFC 211) in 3 steps

  1. Open the plan and set the scale
    Drop the PDF plan into the studio and display the page of the storey to be priced. Calibrate the scale on a known dimension, or choose 1:50 if the plan has not been resized.
  2. Draw slabs and walls in a CFC 211 layer
    Draw each slab as a polygon area with its openings. Measure the load-bearing walls as cumulative lengths, then enter the height: thickness for a slab, storey height for a wall. The studio calculates wall areas and volumes.
  3. Check the table and export to CSV
    The summary table groups the lines by layer and shows the formula behind each quantity. Read through the descriptions, then export to CSV to carry the quantities over into your quote.

Open the free studio →

What the free version does not do for a structural work take-off

Measurements are made by hand: the studio does not recognise walls or slabs on its own, and it does not calculate reinforcing steel. Nothing is saved: closing the tab erases the plan and the measurements. The only free export is CSV, with the Art Construction notice.

With Soumissions, the quantities go into the items of a quote, with the price database and one file per site. Plans Pro (2D/3D) saves layers and measurements site by site, allows teamwork and exports without a watermark.

Frequently asked questions

Can you calculate a concrete volume from a PDF plan?

Yes. Draw the slab or the wall footprint as a polygon area, then enter the height: slab thickness or storey height. The studio multiplies the area by that height and shows the volume in m³.

How do you measure the formwork areas of load-bearing walls?

Measure the walls as cumulative lengths and enter the storey height: the studio gives the wall area, length multiplied by height. This value is for one face; double it in your spreadsheet for a wall formed on both sides.

Should openings be deducted in a masonry take-off?

It depends on the specification and on the measurement practice of the trade. The studio offers three settings: no deduction, all openings, or those above a threshold.

Are my tender drawings sent to a server?

No. The PDF plan is read in your browser and is not transmitted to any server. The trade-off is that nothing is kept: when the tab is closed, everything is gone.