Energy Renovation Grants in Switzerland: Buildings Programme
Work out cantonal grants and Buildings Programme aid for insulation, heat pumps or solar.
Free · no sign-up for the first 2 tries
Your project
- 100 % server-side calculation: no reference price is ever sent to your browser.
- Indicative results: they guide you, but do not replace a professional’s quote.
Insulating a home, replacing a heating system, or installing solar panels entitles you to public funding, but grant amounts are set canton by canton. Our simulator applies the official rates recorded on November 21, 2026, across the 26 cantons and displays "inquire with the canton" whenever a rate schedule cannot be confirmed with certainty.
What the Buildings Programme finances for your home
The Buildings Programme is the joint framework of the Confederation and the cantons for the energy-efficient retrofitting of buildings. It is financed in part by proceeds from the CO2 levy collected on fossil fuels, supplemented by each canton's own budget credits.
Cantons adhere to a harmonised funding model that numbers each measure, yet they establish the subsidy amounts themselves, manage their own budgets, and process the applications. Each cantonal energy department publishes its own rate schedule, which can also be found on the dasgebaeudeprogramm.ch portal (leprogrammebatiments.ch in French). Rates vary from year to year: the simulator indicates the source document referenced, its date, and its web address for every calculation result.
Which works are subsidised, and which are not
Subsidies target existing properties: building envelope insulation, replacing fossil fuel or direct electric heating, connecting to a district heating network, solar thermal systems, and energy advisory reports. New constructions are generally not covered by these programmes.
- The insulation grant applies to external facades, roofs, and ground- or exterior-contact floors. Insulating against an unheated room, such as a basement ceiling, is excluded in numerous cantons (Zurich, Zug, Lucerne, Uri, Valais), but supported in a few others (Glarus, Grisons).
- The heat pump grant, wood heating systems, and district heating connections require replacing a primary fossil fuel (heating oil, natural gas) or direct electric heating installation.
- Window replacement on its own is not subsidised in Vaud, Neuchâtel, Valais, Zurich, Lucerne, or St. Gallen; Grisons supports it only when the adjoining facade or roof is refurbished simultaneously.
Certain cantons have suspended measures due to lack of funding: in 2026, Jura only supports insulation, and Thurgau ended funding for air-to-water heat pumps.
Amounts determined by canton and project type
Depending on the measure, funding is paid as a flat rate, a contribution per insulated m², or a base flat rate increased by an amount per kW. For a 10 kW air-to-water heat pump replacing a fossil-fuel system, the rate schedule awards, for example, CHF 2,900 in Zurich, CHF 5,000 in Vaud, CHF 6,000 in Bern, CHF 8,500 in Zug, and CHF 9,000 in Valais. For roof or facade insulation, rates span between CHF 40 and CHF 140 per m² depending on the canton: Vaud pays CHF 40 or CHF 70 depending on the U-value achieved (CHF 100 with photovoltaics), Geneva CHF 140, Glarus and Grisons CHF 90.
The calculation also incorporates criteria that the simulator applies once you enter them:
- construction year: in many cantons, only buildings built before 2000 are eligible for insulation subsidies;
- a minimum threshold per application (ranging from CHF 500 to CHF 3,000) and a funding cap as a percentage of total costs (30, 35, 40, or 50% depending on the canton);
- allowable thermal output, frequently capped at 50 W per m² of energy reference area.
Estimated project costs reflect market estimates used to assess your net out-of-pocket expenses. Only the subsidy rate strictly follows the official schedule: enter your quote for a more precise out-of-pocket calculation.
Step-by-step procedure: submit your application before starting works
Accessing cantonal subsidies requires adherence to a strict chronological sequence: the application must be submitted prior to the commencement of any works. Placing an order or starting a construction site before receiving cantonal approval can lead to an outright rejection.
- Carry out an initial assessment, ideally with a Cantonal Building Energy Certificate (CECB) Plus advisory report.
- Obtain detailed quotes specifying all technical characteristics of the equipment.
- Submit the complete file to the cantonal energy department before placing any order.
- Await the formal grant approval notice, which sets the granted amount and the completion deadline.
- Execute the construction work in full compliance with the requirements stated in the approval notice.
- Submit supporting proofs and receipted paid invoices, then receive the disbursement following final inspection.
CECB Plus, solar, and other grants not to overlook
The CECB Plus evaluates retrofitting variants with cost estimates. Multiple cantons support it with a lump-sum contribution, usually ranging from CHF 500 to CHF 1,500: CHF 500 in Ticino, CHF 1,000 in Vaud, CHF 1,500 in Zug.
For photovoltaics, the primary financial incentive is the federal one-off remuneration, disbursed by Pronovo and defined by the Ordinance on the Promotion of the Production of Electricity from Renewable Energies. The base contribution is zero since April 1, 2024. The capacity contribution stands at CHF 360 per kW for attached panels (CHF 400 for integrated panels) up to 30 kW, CHF 300 (CHF 330) from 30 to under 100 kW, and CHF 250 for 100 kW and above. An elevation tilt bonus of CHF 200 per kW (CHF 400 for integrated panels) applies from an angle of 75° and steeper. A minimum capacity of 2 kW is required, and for installations under 100 kW, the application is submitted following commissioning.
Several cantons provide an additional top-up: Ticino grants 50% of the federal remuneration up to 30 kW, while Uri, Obwalden, and Grisons subsidise winter photovoltaics. Your municipality or local electricity provider may offer supplementary subsidies. These renovations frequently require an official permit or notice: use our building permit quiz to determine your exact regulatory formalities.
Subsidies, project budget, and taxes: calculating the full picture
A subsidy lowers the net cost of your construction site, but it also reduces the overall amount of value-maintaining expenses you can deduct from your taxes. To measure the exact fiscal impact on your tax return, consult our tax savings calculator.
Next, factor this funding into a broader financial forecast using our renovation budget calculator. If you intend to purchase an older home requiring refurbishment, calculate upfront capital requirements with our pre-purchase property costing tool. To take the next step, compare competitive quotes from qualified regional contractors via our dedicated Tenders platform. This guide provides general information regarding current subsidy schemes; it does not substitute for a formal cantonal ruling nor individual legal, tax, or technical advice.
| Type of work | Funding provided under rate schedules | Key points to verify |
|---|---|---|
| Roof insulation | From CHF 40 to CHF 140 per m² depending on the canton (Vaud 40 to 100, Geneva 140) | Target U-value to achieve, construction year, minimum threshold per application |
| Facade insulation | From CHF 40 to CHF 140 per m² depending on the canton (Glarus and Grisons 90) | Net insulated area, target U-value to achieve, minimum threshold per application |
| Floor or cellar ceiling insulation | Supported over ground or open air; commonly excluded against unheated spaces | Nature of adjacent room and ground depth |
| Heating system replacement | Flat rate or flat rate plus capacity sum per kW (10 kW air-to-water heat pump: CHF 2,200 to CHF 10,500 in participating cantons) | Heating system being replaced, output capacity capped at 50 W per m² of energy reference area |
| CECB Plus | Flat rate of CHF 500 to CHF 1,500 in most cantons providing support | Advisory report featuring comprehensive renovation options and consultation |
| Solar panels | Federal one-off remuneration: CHF 360 to CHF 400 per kW up to 30 kW | Application filed with Pronovo post-commissioning, cantonal top-ups are rare |
| Windows combined with insulation | Grisons: CHF 45 per m² when combined with adjacent facade or roof works | Isolated window replacements excluded across most cantons |
Frequently asked questions
Must I wait for formal grant approval before starting construction works?
Yes, under almost every cantonal programme: the application must be registered before the construction site begins or orders are placed, under penalty of rejection. The main exception is photovoltaics: for installations below 100 kW, the federal one-off remuneration is requested through Pronovo after the system is fully commissioned.
Are renovation subsidies taxable in Switzerland?
Generally speaking, public energy subsidies are not considered taxable income; however, they proportionally reduce the value-maintaining property maintenance expenses you can deduct from your taxes: only the net cost remaining out of your pocket is tax-deductible.
Can I combine a cantonal energy grant with the federal solar remuneration?
Yes, they are distinct support mechanisms: the Buildings Programme funds the building envelope and heating system retrofits, whereas the federal one-off remuneration supports photovoltaic panels. Some cantons provide supplementary top-ups, such as Ticino (paying 50% of the federal remuneration up to 30 kW).
How long do I have to complete the works once the grant is approved?
The grant approval decision specifies a binding completion deadline that varies by canton: 12 months in Ticino, 24 months in Vaud, and 48 months in Bern for heat pumps, for example. If this deadline lapses without formal extension, entitlement to the grant is generally forfeited.
Can a recently built property qualify for energy subsidies?
Generally not. For building envelope insulation, cantons such as Vaud, Geneva, Neuchâtel, Fribourg, Valais, Ticino, and Jura require the building to have been constructed prior to 2000, while Bern specifies 2012 for solar thermal installations and CECB Plus. Specify your construction year in the simulator to evaluate your canton's conditions.
Is a CECB report mandatory to submit a grant application?
That depends entirely on the canton and project scale. Across many Romand cantons, a CECB Plus is mandatory when envelope subsidies exceed CHF 10,000; for smaller or single-measure installations, it is frequently not required.
Updated on 2026-11-21
The other free tools
- Renovation budget calculator (ACIP index) Estimate the cost range of your work item by item, by canton and finishing level. Open the tool
-
Subsidies calculator and Buildings Programme Work out cantonal grants and Buildings Programme aid for insulation, heat pumps or solar. Tool shown
- Renovation tax savings calculator Estimate the tax savings you may get on maintenance and energy-improvement work. Open the tool
- Quick renovation estimate before buying property Figure out in minutes the work to expect before buying a property, based on its condition and energy certificate. Open the tool
- AI scanner for contractor quotes Upload a quote you received: the AI spots vague items, unusual prices and points to negotiate. Open the tool
- Building permit quiz by canton Answer a few questions to find out whether your work needs a permit or a public notice. Open the tool
- Contractor reliability check Check a company in the commercial register and get a reliability score before paying a deposit. Open the tool
- Tender generator for condominiums and property managers Generate a clear tender for your condominium or property manager and receive 3 truly comparable quotes. Open the tool
- Contractor lead times: official benchmarks Construction order backlog reach and typical activity seasonality, based on KOF and the Federal Statistical Office. No lead times by trade or canton: no official data exists. Open the tool
- Express estimate by CFC code (demo) Get a quick estimate by CFC code: a demo for building professionals. Open the tool