Swiss Property Owner Tools: Estimate and Plan Construction
Ten free tools to budget, fund and check your building work: for homeowners, condominium associations and property managers.
Free · no sign-up for the first 2 tries
The 10 free tools
- Renovation budget calculator (ACIP index) Estimate the cost range of your work item by item, by canton and finishing level. Open the tool
- Subsidies calculator and Buildings Programme Work out cantonal grants and Buildings Programme aid for insulation, heat pumps or solar. Open the tool
- Renovation tax savings calculator Estimate the tax savings you may get on maintenance and energy-improvement work. Open the tool
- Quick renovation estimate before buying property Figure out in minutes the work to expect before buying a property, based on its condition and energy certificate. Open the tool
- AI scanner for contractor quotes Upload a quote you received: the AI spots vague items, unusual prices and points to negotiate. Open the tool
- Building permit quiz by canton Answer a few questions to find out whether your work needs a permit or a public notice. Open the tool
- Contractor reliability check Check a company in the commercial register and get a reliability score before paying a deposit. Open the tool
- Tender generator for condominiums and property managers Generate a clear tender for your condominium or property manager and receive 3 truly comparable quotes. Open the tool
- Contractor lead times: official benchmarks Construction order backlog reach and typical activity seasonality, based on KOF and the Federal Statistical Office. No lead times by trade or canton: no official data exists. Open the tool
- Express estimate by CFC code (demo) Get a quick estimate by CFC code: a demo for building professionals. Open the tool
How it works
- Pick the tool that matches your question.
- Answer a few simple questions, with no sign-up to begin with.
- Get a figured result that you can print or turn into a tender.
- 100 % server-side calculation: no reference price is ever sent to your browser.
- Indicative results: they guide you, but do not replace a professional’s quote.
This suite of ten construction simulators helps individual property owners, co-owners, and property management companies plan their renovation or construction projects in Switzerland. Each module provides practical benchmarks to anticipate costs, check administrative procedures, and analyze contractor quotes.
Tools for owners, condominium ownership, and property managers
Whether preparing a roof overhaul within a condominium ownership, a property purchase, or the rental management renovation of an investment property, these online services meet the practical requirements of clients (building owners) in Switzerland. They allow you to structure a project before committing expenses or contacting construction professionals.
Depending on the tool, results represent indicative ranges or are based on official scales and rates cited with their source. In all cases, they replace neither contractor quotes, official authority decisions, nor personalized advice.
The ten construction simulators structured by project phase
The range brings together ten features organized into four complementary categories:
- Plan and estimate: evaluate an overall budget with the construction budget simulator, prepare a property visit with the pre-purchase property cost calculator, or test the professional demo on three items with the express construction cost classification (CFC) calculator including a 14-day Pro trial.
- Finance: identify financial assistance through the subsidy simulator and determine potential tax deductions using the tax savings simulator.
- Permits and schedule: check whether an official application is required with the building permit quiz and consult the official benchmarks on contractor lead times.
- Select and verify: review a pricing proposal with the quote scanner, prepare a comparable call for tenders, and verify a service provider's legal registration using the company verifier.
Interpreting results and safeguarding your personal data
The estimates provided help guide your planning decisions and schedule your cash flow. These figures remain indicative, however, and must be confirmed with the competent canton, municipality, or tax authority. Several modules integrate the specific regulations of the 26 Swiss cantons to refine local calculations.
Regarding your documents, the quote scanner does not store the file: it is deleted at the end of the request and its content is not logged. To be analyzed, the quote is nevertheless transmitted to an artificial intelligence service provider, currently Mistral AI (France), via the Mistral API or, if this service is unavailable, Google LLC (United States), via the Gemini API.
From simulation to construction site with the Tenders platform
Several tools offer a direct gateway to our matchmaking service, directly from your result.
Using the Tenders module, your request is published without disclosing your name or exact address. Every contractor must hold an active business identification number (IDE) and be validated by Art Construction to submit a bid; you retain three at most. You receive a printable summary, without any unsolicited emails.
This guide provides general information and does not constitute individual legal, tax, or technical advice.
Frequently asked questions
Do these tools provide official amounts?
It depends on the tool. For subsidies and taxes, the result is based on official scales and rates whose source is cited, but it remains a calculation based on your data: only the authority decides. The budget and the pre-purchase estimate provide indicative ranges. In all cases, final amounts must be confirmed with the canton, the municipality, the tax authority, or directly with construction companies when preparing quotes.
Is my quote stored by the scanner?
Art Construction does not retain the document: it is deleted at the end of the request and its content is not logged. To be analyzed, it is nevertheless transmitted to an artificial intelligence provider, currently Mistral AI (France), via the Mistral API or, if this service is unavailable, Google LLC (United States), via the Gemini API.
Which tool should I start with for my project?
For a comprehensive renovation, begin by assessing your overall budget with the budget simulator, then explore subsidies and tax deductions. If you have already received an offer from a contractor, prioritize the quote scanner.
Can I obtain quotes through these tools?
Yes. Several tools allow you to forward your request to the tenders platform as an anonymous call for tenders. Only contractors validated by Art Construction, holding an active IDE, can submit an offer; you retain a maximum of three.
Can I select my canton?
Yes, in most simulators: you select your canton from among the 26 Swiss cantons to take into account tax scales, cantonal subsidy programs, and local administrative practices. Contractor lead time benchmarks are the exception: official figures exist only on a nationwide Swiss level.
Updated on 2026-11-21