CFC building cost classification and express costing in Switzerland
Get a quick estimate by CFC code: a demo for building professionals.
Free · no sign-up for the first 2 tries
Your project
- 100 % server-side calculation: no reference price is ever sent to your browser.
- Indicative results: they guide you, but do not replace a professional’s quote.
The building cost classification serves as a methodical benchmark for costing and planning the expenses of a construction site in Switzerland. This harmonised classification allows architects, engineers, and clients to organise expenditure clearly. Understanding its structure helps in assessing quotes and tracking the budget at every stage.
The CFC, the common language of cost estimation in Switzerland
The construction cost code (CFC) represents the benchmark Swiss classification for structuring all expenses on a construction site. Published by the Swiss Research Centre for Building Rationalisation, this classification standardises dialogue between the various project partners. It provides an identical framework for planning expenditure from the initial sketches through to the handover of the completed building.
Architects, general contractors, engineering firms, and property managers use this system daily to prepare their estimates and structure their calls for tenders. For the client, whether an individual or a public entity, this organisation removes grey areas in the breakdown of costs. Construction cost estimation thus gains in transparency and technical consistency.
Thanks to this standardised classification, comparing two competing bids becomes a straightforward and objective process. Tangible works and intellectual services are categorised in separate sections, preventing the omission of essential items or duplicate entries when awarding contracts.
How the CFC is structured by groups and sub-groups
The overall structure relies on a tree structure that groups expenses into clearly defined functional categories. The main groups are broken down according to the following official categories:
- CFC 0: land
- CFC 1: preparatory work
- CFC 2: building
- CFC 3: operating equipment
- CFC 4: external works
- CFC 5: ancillary costs and contingency accounts
- CFC 9: furnishing and decoration
Group 2 accounts for the major share of actual construction costs. It is divided into several numbered sections: 20 excavation, 21 structural work 1, 22 structural work 2, 23 electrical installations, 24 heating, ventilation and air conditioning, 25 plumbing installations, 26 transport systems, 27 interior finishes 1, 28 interior finishes 2, and 29 fees. Three-digit codes allow each operation to be specified in greater detail, such as CFC 201 dedicated specifically to construction site excavations.
Cost estimation by CFC: the express costing method
An express building costing relies on a logical sequence of precise steps to establish a sound financial framework without unnecessary complexity:
- Define the exact scope of the works to be undertaken.
- Select the CFC groups relevant to the planned works.
- Enter the required take-offs and quantities for each task.
- Apply benchmark prices tailored to current market conditions.
- Add a contingency provision to cover unforeseen expenses.
- Apply the prevailing VAT rate of 8.1% to the resulting total.
The overall precision of the estimate is refined as the project progresses, from the initial sketch through to the final scheme and the detailed tender. To assess the overall financial feasibility of a home renovation, an owner can also use a renovation budget simulator to obtain an initial broad overview before undertaking a detailed item-by-item analysis.
Who the professional costing demo is designed for
The online demo directly addresses the preliminary scoping needs of independent architects, site managers within general contractors, engineering consultancies, and property management companies. This tool allows them to test a breakdown by standardised codes before committing to more comprehensive technical studies.
For a private client, mastering a quote structured by CFC provides a significant advantage when reviewing documents submitted by design professionals. This classification makes it possible to pinpoint the most expensive items precisely and verify the plausibility of the quoted amounts. Before starting a construction site, reviewing incoming quotes can be supplemented with a quote scanner to check required details and the clarity of line items.
When a project requires comparing several specialists on an equal footing, launching a comparable call for tenders structured around identical chapters simplifies the cross-comparison of tenders submitted by local contractors.
The demo: three items, followed by the 14-day Pro trial
The demonstration version allows you to test express costing on 3 items of your choice. This hands-on experience showcases the ordering logic without requiring intricate setup. This estimate is indicative and does not replace a contractor quote. No unit price from the reference database is publicly displayed within this test interface, thereby safeguarding the confidentiality of the calculation models.
To explore further, professionals can request the 14-day Pro trial of the Pro Suite and Tenders.
Tenders can import a bill of quantities in SIA 451 format (tender data exchange) and structure it automatically.
Linking the CFC to your other project workflows
A project estimate benefits greatly from being benchmarked against reference prices: the ACIP Price Index presents them by item (CFC) and by canton.
Throughout the overall execution of a project, structuring works through standardised codes also serves as the foundation for subsequent contractual stages. Both professionals and property owners can access valuable resources among all tools for property owners provided to assist with their technical and administrative planning.
A rigorous breakdown streamlines discussions with banks, insurers, and technical consultants throughout the construction phases. This guide provides general information and does not constitute individual legal, tax, or technical advice.
| Group | Title | Typical content |
|---|---|---|
| CFC 0 | Land | Plot acquisition, property transfer taxes, and notary fees. |
| CFC 1 | Preparatory work | Preliminary demolitions, site investigations, and initial clearances. |
| CFC 2 | Building | Structural work, joinery, technical building services, and finishes. |
| CFC 3 | Operating equipment | Dedicated installations linked to the building's specific operations. |
| CFC 4 | External works | Retaining walls, fences, landscaping, and access roads. |
| CFC 5 | Ancillary costs and contingencies | Building permits, project insurance, and financial reserves. |
| CFC 9 | Furnishing and decoration | Fitted or loose furniture, window coverings, and internal signage. |
Frequently asked questions
What is the CFC in Swiss construction?
The CFC (construction cost code) is a standardised classification created by CRB. It organises property project costs into uniform chapters, streamlining quotes and tenders.
Is the construction cost code mandatory?
The CFC is not a statutory obligation under federal law. It is an industry working standard contractually agreed upon by the vast majority of architects, engineers, and clients to streamline coordination.
What is the difference between the CFC and the SIA 451 format?
The CFC provides the classification system that categorises expenses by trade. The SIA 451 format is an IT data exchange standard allowing the digital transfer of tender specifications across specialised software.
What can you evaluate with the express costing demo?
The free-access demo allows you to test the standardised estimation method on up to 3 construction items, without revealing any confidential unit price figures from the reference database.
How long does the Pro trial of the Pro Suite last?
The Pro trial runs for a period of 14 consecutive days. It provides unrestricted access to all costing headings as well as advanced features for managing tenders.
Can I import an existing tender specification?
Yes, the professional module supports files formatted to the SIA 451 standard, reconstructing the chapter breakdown and preparing bid comparisons without re-entering data.
Updated on 2026-11-20
The other free tools
- Renovation budget calculator (ACIP index) Estimate the cost range of your work item by item, by canton and finishing level. Open the tool
- Subsidies calculator and Buildings Programme Work out cantonal grants and Buildings Programme aid for insulation, heat pumps or solar. Open the tool
- Renovation tax savings calculator Estimate the tax savings you may get on maintenance and energy-improvement work. Open the tool
- Quick renovation estimate before buying property Figure out in minutes the work to expect before buying a property, based on its condition and energy certificate. Open the tool
- AI scanner for contractor quotes Upload a quote you received: the AI spots vague items, unusual prices and points to negotiate. Open the tool
- Building permit quiz by canton Answer a few questions to find out whether your work needs a permit or a public notice. Open the tool
- Contractor reliability check Check a company in the commercial register and get a reliability score before paying a deposit. Open the tool
- Tender generator for condominiums and property managers Generate a clear tender for your condominium or property manager and receive 3 truly comparable quotes. Open the tool
- Contractor lead times: official benchmarks Construction order backlog reach and typical activity seasonality, based on KOF and the Federal Statistical Office. No lead times by trade or canton: no official data exists. Open the tool
-
Express estimate by CFC code (demo) Get a quick estimate by CFC code: a demo for building professionals. Tool shown