Skip to content

Tax Deductions for Renovations and Tax Savings in Switzerland

Estimate the tax savings you may get on maintenance and energy-improvement work.

Free · no sign-up for the first 2 tries

Your project

  • 100 % server-side calculation: no reference price is ever sent to your browser.
  • Indicative results: they guide you, but do not replace a professional’s quote.

In Switzerland, property owners can deduct maintenance costs and certain energy-efficiency investments from their taxable income. The resulting tax savings depend on your canton, your municipality, and your income level. This page explains the applicable rules and the methodology behind the simulator, based on the official Swiss Confederation tax calculator.

Which renovations can be deducted from your taxes?

Swiss tax law distinguishes between two main categories of expenditure for private real estate. Maintenance costs, incurred to preserve the value of a house or apartment, are deductible from taxable income. On the other hand, expenditures that increase the property's value, such as adding a conservatory, an extra storey, or unprecedented luxury, are not deductible.

Investments intended to save energy and protect the environment are treated like maintenance when they replace outdated elements or are added to an existing building: insulation, heat pump installations, solar panels, or more energy-efficient windows. If a public authority subsidises the measure, only the expenses you actually bear yourself are deductible (federal ordinance on the deduction of costs relating to private real estate, applied by the cantons).

Before starting any formal steps, estimate your project using the renovation budget simulator.

Maintenance or value appreciation: making the distinction

The tax classification of each expense determines whether it is deductible. Maintenance preserves or restores what already exists; value appreciation significantly improves the property or expands the living area.

  • Deductible maintenance: painting, roof repairs, plumbing fixes, like-for-like replacement of an outdated kitchen.
  • Non-deductible appreciation: conservatory, building upwards, outdoor swimming pool, luxury amenities not previously present.
  • Mixed work: replacing an older installation with a significantly more sophisticated model.

Always ask the contractor to separate maintenance, energy measures, and value appreciation clearly in their quote. The quote scanner checks the clarity of line items before you sign.

Energy renovations: building age and carrying forward costs

Energy-saving measures enjoy favourable tax rules. If the expense cannot be fully deducted during the tax year the work took place, the balance carries forward to the following tax period, and then to the next. All 26 surveyed cantons allow this two-period carry-forward, generally only if your net income becomes negative, and without a flat-rate maintenance deduction for those years. Ordinary maintenance cannot be carried forward.

The age of the building matters for energy investments, but not for maintenance. The federal ordinance sets no minimum age, but most cantons disallow the deduction during the early years of a newly built property, as the expenditure is considered part of the initial construction cost. This restriction lasts five years in nine cantons (including Aargau, Fribourg, Graubünden, and Valais) and two years in five others (including Basel-Stadt, St. Gallen, and Jura); other cantons target only photovoltaics or specify no fixed duration. The simulator applies your canton's specific rule to buildings under five years old.

Grants received, such as those from the Buildings Programme, reduce your deductible costs: calculate them with the subsidy simulator.

Actual costs or flat-rate: a choice made each year

Every year and for each property, you choose between deducting your actual costs or taking a flat-rate deduction calculated on the gross imputed rental value or gross rental income. At the federal level, this flat rate is 10% if the building is ten years old or younger, and 20% thereafter. Several cantons deviate from this: 20% regardless of age in Zurich, Appenzell Innerrhoden, and St. Gallen; 20% then 25% in Basel-Landschaft; 15% then 25% in Schaffhausen and Geneva; 20% then 30% in Vaud for owner-occupied homes; a cap of CHF 7,200 or CHF 12,000 in Neuchâtel.

If you deduct actual expenses, you forgo the flat-rate deduction for that year. For major work, actual expenses are usually far more advantageous. The true financial saving applies to the amount exceeding the flat rate: the simulator does not subtract this difference because it does not know your imputed rental value.

In the surveyed cantonal legal texts, renovating a recently acquired property counts as maintenance; Neuchâtel remains to be confirmed. An estimate before buying property integrates these factors directly into your financing plan.

Estimating your tax savings: official marginal rates

Your tax savings equal the tax due on your taxable income minus the tax due after applying deductions. The simulator uses the official Federal Tax Administration calculator for the 2026 tax year. For each canton, it extracts federal, cantonal, and communal taxes for a single person or a married couple without children, excluding church tax, residing in the cantonal capital.

The marginal rate represents the additional tax owed on each extra franc of income. For a single person with a taxable income of CHF 80,000, it ranges from 16.3% in Zug to 32.1% in Basel-Landschaft; at CHF 130,000, from 19.9% in Schwyz to 39.8% in Valais; at CHF 220,000, from 23.6% in Zug to 44.8% in the Canton of Vaud. Municipal tax multipliers cause variations from one commune to another: the simulator therefore displays a range.

Example: in Lausanne, for a single person with a taxable income of CHF 80,000, a deduction of CHF 34,000 (CHF 37,000 in work minus CHF 3,000 in subsidies) lowers taxes from CHF 15,801 to CHF 7,169, yielding a saving of CHF 8,632. In Zug, the exact same deduction saves CHF 3,881. To compare different renovation options, use the renovation budget simulator as well.

Imputed rental value and supporting records: key rules

The abolition of the imputed rental value was approved by popular vote on 28 September 2025. The Federal Council selected 1 January 2029 as the effective date; until then, the current regime remains fully applicable. Afterward, the deduction for maintenance costs on owner-occupied residential property will disappear, as will energy-related deductions for direct federal tax, which cantons may temporarily retain. Seek advice before deferring scheduled work.

For owners in a condominium ownership (PPE), contributions made to the renovation fund are generally not deductible when deposited; only costs actually paid out by the community for maintenance are deductible, based on your ownership share. Keep quotes, detailed invoices, and proof of payment safe. To receive distinct, transparent offers, explore the Tenders platform. This guide provides general information and does not constitute individual tax advice.

Tax treatment of renovation work: overview
Type of workTax deductionRequired documentation
Routine maintenance and repairsDeductible from taxable incomeItemised invoices
Energy-saving measuresDeductible in existing buildings, carry-forward possibleTechnical certificate, invoices
Expansion or value appreciationNot deductible from taxable incomeInvoices retained for resale
Mixed worksMaintenance or energy portion onlyItemised breakdown on invoice
Subsidies receivedReduces deductible amountOfficial subsidy decision
Renovation fund (condominium ownership)Not deductible upon payment into fundAnnual statement of the condominium

Frequently asked questions

Are renovations within a condominium ownership (PPE) tax-deductible?

Payments into the renovation fund are generally not deductible at the time of deposit; only maintenance costs incurred by the co-owners' association are deductible, in proportion to your ownership share.

Can I deduct renovation work completed immediately after purchase?

Under the surveyed cantonal legal texts, restoring a recently acquired building counts as maintenance. Neuchâtel exhibits a discrepancy between its regulations and practice notes: to be confirmed.

What is the status of the abolition of the imputed rental value?

Approved by popular vote on 28 September 2025, it is scheduled to enter into force on 1 January 2029 according to the Federal Council; the current system remains in effect until then.

Can I carry forward the tax deduction to the following year?

Yes, for energy-saving investments: any unused balance can be carried forward over the next two tax periods across all 26 surveyed cantons, generally if your net income becomes negative. Ordinary maintenance cannot be carried forward.

Do I need to retain itemised invoices?

Yes. The tax authority can request accepted quotes, itemised invoices, and payment receipts during a tax audit. Ask your contractor to separate maintenance, energy measures, and value appreciation on each invoice to simplify review.

Is the output of the simulator legally binding?

The tax rates come directly from the official Swiss Confederation tax calculator (2026 tax year), but the calculated saving is an estimate based on your inputs, not an official assessment: only the competent tax authority decides based on your filed return.

Updated on 2026-11-21

The other free tools