Skip to content

Call for tenders for condo works: comparing three reliable quotes

Generate a clear tender for your condominium or property manager and receive 3 truly comparable quotes.

Free · no sign-up for the first 2 tries

Your project

  • 100 % server-side calculation: no reference price is ever sent to your browser.
  • Indicative results: they guide you, but do not replace a professional’s quote.

To ensure the success of a renovation project in condominium ownership or property management, bringing tradespeople into competition is a decisive step. Having rigorous specifications allows you to compare equivalent services on transparent technical and financial grounds. This guide helps you structure your requests to select the enterprise best suited to your needs.

Why request three comparable quotes in condominium ownership

In the private sector, obtaining three comparable offers is not a legal obligation under public procurement law. However, for a property management company or a property owner, this approach represents an especially recommended management best practice. During a call for tenders for condo works, co-owners expect solid evidence before voting on substantial investments for the building.

Without a clear methodological framework, comparing contractor proposals often amounts to comparing disparate elements. One contractor might omit waste disposal, while another includes higher-quality finishes. This dispersion of data makes the decision of the co-owners' general meeting complex and leads to hesitation during the final vote.

Using a common baseline thus protects managing agents and management committee members. By submitting a uniform request, the property management ensures absolute clarity in the treatment of candidate enterprises. You then have verifiable arguments to present at the meeting to justify the choice of the selected tradesperson.

Key elements of renovation specifications

The quality of the proposals received depends directly on the precision of the documents provided to the consulted tradespeople. For the technical comparison to remain relevant, renovation specifications must include a set of indispensable details:

  • A detailed written description of the nature of each required intervention.
  • Carefully measured quantities or explicit plans and photographs of the site.
  • A precisely defined scope, stating what is included and what is excluded.
  • A common return deadline for all solicited tradespeople.
  • An on-site visit offered to each interested professional.
  • The distribution of all questions and answers to every competing enterprise.
  • The obligation to state any potential variants on separate sheets distinct from the main quote.

By establishing these directives at the very start of the process, you avoid pricing omissions. Every tradesperson enjoys the same opportunities and works from the same assumptions, which simplifies the subsequent evaluation of the received proposals.

Fixed price or cost-plus: pricing schemes applicable to quotes

The financial wording chosen in your document commits the subsequent contractual relationship with the tradesperson. It is therefore advisable to state explicitly the expected remuneration method: fixed price or cost-plus (time and materials), or an approximate estimate.

A fixed lump-sum price provides valuable budget certainty for co-owners. According to art. 373 of the Swiss Code of Obligations (CO), the contractor is required to complete the work for the agreed sum and cannot demand an increase, except in the case of extraordinary, unforeseeable circumstances.

Conversely, cost-plus billing is based on the accounting of working hours and materials used on the construction site. This method carries a significant financial risk in the event of unforeseen issues or operational slowdowns.

For its part, an approximate estimate carries a margin of fluctuation against which you must protect yourself. Pursuant to art. 375 CO, if an excessive overrun occurs without the client's fault, the client may withdraw from the contract or demand a reasonable reduction in the agreed amount. Specifying the pricing type in the initial request remains the best precaution.

The SIA 118 standard and statutory contractor warranties

Many clients mistakenly believe that professional standards apply automatically. The SIA 118 standard is a private set of rules that only applies if the parties expressly agree to incorporate it into the contract for work and services.

When adopted by mutual agreement, this trade standard provides a protective framework with a two-year warranty period for notifying apparent defects and a framework for hidden defects that can extend up to five years. It thereby simplifies reporting defects during the initial years of use.

In the absence of this contractual clause, the baseline statutory regime governs the work. Under the terms of art. 371 CO, the client's rights arising from defects in an immovable work become time-barred five years after the acceptance of the works.

During execution, adjustments remain open to the client. Pursuant to art. 377 CO, as long as the work is not completed, the owner may terminate the contract by paying for the services already rendered and indemnifying the contractor.

Analyzing quotes using a comparison grid

To compare three quotes systematically, the analysis must never be limited to the bottom-line figure alone. It is strongly recommended to establish a multi-criteria grid taking several indicators into account:

  1. Compliance with the described scope and a thorough check of all exclusions.
  2. The total amount displayed, including 8.1% VAT, and confirmation of its fixed lump-sum nature.
  3. The execution schedule, construction site opening date, and delivery conditions.
  4. Civil liability insurance policies presented and enterprise affiliation certificates.
  5. The proposed schedule of advance payments and the quote's commercial validity period.
  6. The quality of local references and proven experience on comparable construction sites.

An abnormally low offer should draw your attention. A marked price discrepancy often signals omitted services, uncontrolled subcontractors, or substandard supplies. You can use the quote scanner to spot potential technical weaknesses, then consult the enterprise checker to confirm the company's financial health.

In condominium ownership, the required majority varies depending on whether the works are necessary, useful, or purely decorative. Consult the administrative regulations or a qualified legal expert before submitting the chosen proposals to a vote.

Creating an anonymous call for tenders for your works project

To simplify this procedure without exposing yourself to repeated commercial solicitations, our platform offers an effective service. From your results, you can launch an anonymous call for tenders to the Tenders platform. Your project file is submitted without revealing your name or exact address. Only enterprises whose Business Identification Number (IDE) is active in the commercial register and that have been validated by the Art Construction team can review your request and submit a quote; you select up to three, and your contact details are only shared with them.

You will receive a printable summary. No unsolicited emails will be sent to you. To best prepare for this competitive process, you can also consult the construction budget simulator, monitor overall cost trends with the ACIP Price Index, or position your project within the building season using official contractor timeframe benchmarks (only written offers provide a binding date).

This guide provides general information and does not constitute individual legal, tax, or technical advice. Seek advice from a specialist before undertaking large-scale works.

Comparison grid for three offers
CriterionWhat to compareWhy it matters
Scope and exclusionsCheck the detail of items included and excluded in each offer.Prevents unforeseen extra costs related to omitted tasks during the works.
Price and pricing typeCompare the total amount including 8.1% VAT, whether fixed lump-sum or cost-plus.Fosters budget control and secures the financing approved in the meeting.
Execution timeframesExamine the start date and the overall duration of the work.Enables the planning of disruptions for the building's occupants.
Warranties and SIA 118 standardCheck the contractual inclusion of standard industry practices.Clearly defines the procedure applicable in case of defect reporting.
Insurance and identityVerify the commercial register entry and civil liability insurance certificate.Protects the co-ownership against defaults and construction site incidents.
Payment termsReview the schedule of advance payments required as work progresses.Prevents paying excessive amounts before the proper performance of the work.
Validity and referencesNote the validity period of the quote and recent comparable achievements.Provides the necessary time for the condominium vote while confirming reliability.

Frequently asked questions

How many enterprises should be consulted for condo works?

Consulting three enterprises is a recommended standard in Switzerland. This number is sufficient to establish a balanced price comparison without overloading the condominium ownership's administrative management. It enables you to present clear choices at the co-owners' general meeting.

Is it mandatory to draw up full specifications?

Yes, a single specification document is indispensable to receive genuinely comparable quotes. Without a reference document detailing quantities and expectations, each tradesperson calculates their pricing based on different assumptions, making cost analysis impossible.

What should I do if an offer is much lower than the others?

A proposal significantly lower than the others demands careful verification. Question the tradesperson to confirm that no item was excluded, check the quality of the intended materials, and make sure that services are not delegated to undeclared subcontractors.

Can I terminate a contract after signing with a tradesperson?

According to art. 377 CO, the client (building owner) may withdraw from the contract at any time before the works are completed, provided they fully indemnify the contractor and pay for the work already performed at the time of termination.

How does a condominium ownership decide to vote on renovation works?

Depending on the nature of the works (maintenance, improvement, or embellishment), the law and the condominium ownership regulations require different majorities; consult your property manager or a legal specialist.

Does my call for tenders truly remain anonymous?

Yes, as long as you have not selected any enterprise: the file is published without your name or exact address. Your contact details are only passed on to the enterprises you select, up to a maximum of three. Only enterprises verified in the register and validated by Art Construction can submit an offer.

Updated on 2026-11-21

The other free tools