The 78 Swiss construction tools
Calculators, reference tables and SIA standards for construction companies: tenders, salaries, contracts, management, engineering and one guide per trade. Choose a pillar in the top bar, or look for a tool in the menu on the left.
- 78tools
- 6pillars
- 35standards chapters by trade
- 53PDFs to download
In the spotlight: prices by canton and public tenders
ACIP Price Index (CFC × Cantons)
21 trades × 7 French-speaking cantons: 147 pages of local prices and 21 free PDF sheets, to search and download directly.
Tool 1.1Radar Appels d’Offres Simap
The construction calls for tenders published on Simap and by the cantons, to be filtered by canton and by trade.
The 6 pillars
Tenders, SIA 451 & Building Codes
Spot public contracts, open architects' tender files (SIA 451, CRB), read BIM models and find the right code in the CFC, eCCC-Bât or CAN. Five tools to prepare your bids faster.
5 tools1 PDF Pillar 2Salaries, Social Charges & HR (RH) on Site
From the real cost of a worker to the daywork rate, from the social charges of the 26 cantons to meal and travel allowances, apprentices, notice periods and work permits: six tools to control the payroll of a construction company.
6 tools2 PDF Pillar 3Contracts, Legal, Quotes & Margin Protection
SIA 118 or Code of Obligations, contractors' legal mortgage, change orders, daywork, price escalation, prorata deductions, subcontractors, bad weather, insurance and surety: eleven tools to defend your margin and your rights on site.
11 tools21 PDF Pillar 4Company Management, Vehicle Fleet, Taxation & Sale
Cost of vans and machines, TVA on down payments and retentions, closing of work in progress and valuation of an SME (PME): five management tools to steer the company.
5 tools3 PDF Pillar 5Engineering, Building Physics, PPE & Urban Planning
Areas and volumes, fees, overall budget, PPE, thermal, acoustics, earthquake resistance, accessibility, fire safety, urban planning, permits, subsidies, public land and safety: sixteen tools for construction and renovation projects.
16 tools7 PDF Pillar 6SIA Standards & Calculators by Trade (the 35 ACIP Chapters)
One page per chapter of the ACIP price list: the SIA standards applicable to the trade and a dedicated calculator or checker, from site set-up to final site cleaning.
35 tools5 PDFAdditional field tools
Site report (PV) by voice
Dictate your site visit or paste your notes: attendees, progress per CFC lot, reservations, daywork and extra works are sorted, then exported as a PDF. Everything stays in your browser.
Additional pageSwiss QR-bill generator
Create the payment part of a Swiss QR-bill (QR-IBAN or IBAN, QR or RF reference), export it as an A4 PDF and check the text of an existing QR code. Everything stays in your browser.
Additional pageClient portal via Magic Link
Create a passwordless link, have the client validate a choice of materials or a daywork voucher (live budget impact, signature, time-stamped PDF certificate) and keep an audit trail. Fictitious data.
Move from calculation to full management
Keep your references at hand, then automate them in your quotes, bids and final statements.
