Skip to content

AI Quote Scanner: Analyse and Check a Contractor's Quote in Switzerland

Upload a quote you received: the AI spots vague items, unusual prices and points to negotiate.

Free · no sign-up for the first 2 tries

Your project

  • 100 % server-side calculation: no reference price is ever sent to your browser.
  • Indicative results: they guide you, but do not replace a professional’s quote.
  • Not stored by Art Construction: the document is sent to Mistral AI (France) for analysis, then deleted from our server at the end of the request. If this service is unavailable, the analysis is handled instead by Google LLC (United States), via the Gemini API.

Before hiring a tradesperson or a contractor for your construction site, examining every financial and legal line of the quote received remains a decisive step. A signed quote seals firm contractual commitments whose financial consequences bear directly upon your assets. Our artificial-intelligence-assisted scanner analyses the structure of your quote to help you ask the right questions.

Why check a works quote in Switzerland before signing

Receiving a pricing proposal to renovate a property often raises legitimate hesitations regarding the clarity of the services. The document issued by a professional constitutes a formal offer which, once accepted by your signature, formalises a contract for work and services within the meaning of Art. 363 of the Swiss Code of Obligations (CO). The reciprocal obligations thereupon become enforceable, meaning that every omission, missing detail, or ambiguous wording engages your financial liability.

In Swiss building practice, numerous disputes arise from overly vague descriptions or preparatory tasks excluded from the initial calculation. A hurried owner sometimes signs a summary document without anticipating subsequent extra costs linked to essential unforeseen work. Using a digital analysis tool makes it possible to read the document objectively without replacing the personalised review of a building specialist. The scanner does not act as a technical expert or legal advisor, but provides an initial screening filter to identify elements that warrant written clarification.

What the AI scanner checks during a contractor quote analysis

To protect you against unpleasant surprises, the tool breaks down the textual and numerical content of your document to verify the presence of mandatory details required for a transparent offer.

  • Missing or vague line items within the description of the planned operations.
  • The explicit presence of quantities and their associated units of measurement.
  • The accurate application of the statutory VAT rate of 8.1% across all items.
  • The validity period of the submitted commercial offer.
  • The scheduled start dates and completion deadlines for the work.
  • The payment schedule terms as well as the required advance payment amount.
  • Any contractual reference to the SIA 118 standard to govern the construction site.
  • The legal qualification of the remuneration, between a fixed lump-sum or an approximate quote.
  • Potential discrepancies relative to the benchmark ranges of the ACIP Price Index.

Following this systematic examination, the tool generates an ordered list of practical questions to put directly to the contractor. You can thus clarify grey areas before any financial transfer.

Fixed lump-sum quote or approximate quote: legal rules

The nature of the price stipulated in your offer determines the extent of your financial protection when faced with construction site contingencies. When a tradesperson quotes a firm amount defined as a fixed lump sum, Art. 373 CO provides that the contractor commits to completing the work for the set amount and may claim no increase, except in the event of extraordinary circumstances that were impossible to anticipate. This method offers high predictability to the client (building owner), provided that the initial specifications are faithfully observed without adding supplementary orders.

Conversely, establishing an estimate without a guaranteed amount exposes the budget to potential material fluctuations. In the event of an excessive cost overrun of an approximate quote occurring through no fault of the client, Art. 375 CO grants the owner the right to withdraw from the contract or demand a suitable reduction in the final price. Artificial intelligence identifies ambiguous headings, such as work billed on a time-and-materials basis, to alert you as to whether the stated amounts represent a binding ceiling or a mere guide. You thereby avoid validating an open-ended invoice without gauging its future financial implications.

Quote advance payment, warranties, and SIA 118: sensitive clauses

The payment schedule must reflect the balance of agreed performances between the signatory parties. Under the general rule set out in Art. 372 CO, the price of the work is payable upon its actual delivery. Requiring an advance payment before work commences therefore strictly requires a specific written agreement included in the document. Paying too substantial an advance payment before a single material has been delivered represents a legitimate source of concern.

Regarding construction defects, Art. 371 CO sets the limitation period for the owner's claims at two years for movable works and five years for defects affecting immovable structures. In parallel, the SIA 118 standard provides a balanced framework widely used in the Swiss market, stipulating a warranty period of two years as well as a regime for hidden defects that can run for up to five years. This private technical regulation applies only if the quote or contract formally mentions its incorporation into the contractual relationship. Watch out carefully for several red flags:

  • Vague wording of tasks described as works as needed.
  • The absence of detailed measurements or quantified volumes for each phase.
  • A demand for cash payment without clear bank traceability.
  • A very short offer validity date designed to rush the decision-making process.
  • The omission of company contact details and its Business Identification Number (IDE).

Data protection: analysis provider and nLPD

Submitting a commercial document containing financial and personal data requires special vigilance under the Federal Act on Data Protection (nLPD). To be processed, your quote is transmitted to an artificial intelligence service provider: currently Mistral AI (France) via the Mistral API or, if this service is unavailable, Google LLC (United States) via the Gemini API, meaning in both cases outside Switzerland. Art Construction does not retain your document: it is deleted at the end of the request and its content is not logged. No textual content from your offer is archived by Art Construction.

As an elementary precaution, you may redact your personal details, your name, or the property address before submitting the file to the scanner. The purely indicative nature of an automated algorithmic process should nevertheless be kept in mind. An artificial intelligence system may imperfectly interpret handwriting or a complex table, and this result cannot constitute a certified technical evaluation or individual legal advice. The tool never contacts the company issuing the document directly.

After the scanner: compare, negotiate, and validate the firm

Upon receiving the automated summary, benchmark the proposed amounts against market trends using our reference index. If line items seem underestimated or inflated, readjust your overall budget using our renovation budget simulator. It is also recommended to review the announced intervention schedules carefully and assess the consistency of the proposed execution rates across the entire planned construction site.

Before entering into any final commitment, use our company verification tool to confirm the contractor's registration in the commercial register and verify their solvency. You can then convert your request into a comparable call for tenders. By activating the gateway to our Tenders module, your project is published anonymously, without displaying your name or exact address. Only companies holding an active IDE number and vetted by Art Construction can submit a competing offer; you select up to three, and you receive a printable summary without receiving unsolicited emails. The explanations provided in this guide constitute general information and do not replace individual legal, tax, or technical advice.

Quotes: Key Points to Check Before Signing
Check itemQuestion to askRed flag
Description of worksWhich preparatory and finishing stages are included?Vague phrasing referring to works as needed
Quantities and unitsHow were the surface areas or volumes measured?All-inclusive lump-sum price without any detailed measurements
Price, price type and 8.1% VATIs the total amount a firm fixed price or an estimate?No mention of the statutory VAT rate
Advance payment and scheduleWhat are the exact due dates for requested payments?Substantial advance payment required before any site work starts
Deadlines and offer validityWhat is the firm period during which prices are held?Offer expiring in a few days to force an agreement
Warranty and SIA 118 standardDo the contractual terms incorporate the SIA 118 standard?Absence of any clause governing the defect liability regime
Company identity (IDE)What is your Business Identification Number?Company without a verifiable postal address or IDE number

Frequently asked questions

Is my quote retained after the analysis?

Art Construction does not retain it: the file is deleted at the end of the request and its content is not logged. To be processed, it is nonetheless transmitted to an artificial intelligence provider, currently Mistral AI (France) via the Mistral API or, if unavailable, Google LLC (United States) via the Gemini API. You may redact your personal details before uploading.

Can the scanner tell me if the price is too high?

The tool identifies deviations from standard benchmark ranges observed in the Swiss market. These indications remain purely illustrative, as every construction site entails specific access or material constraints that legitimately affect the contractor's final pricing.

What should I do if the scanner flags a significant discrepancy?

You should request written clarifications from the company regarding the nature of the materials and the planned methods. The list of questions generated by the tool helps you request detailed justifications or seek adjustments to ambiguous line items.

Can the AI analysis make mistakes?

Yes, an automated system can misinterpret handwritten text, unusual formatting, or regional technical terminology. The result serves as an indicative aid and does not substitute for the professional opinion of a building expert or a lawyer.

Is an advance payment standard in a quote?

Under Art. 372 CO, the price is payable upon delivery, but the parties may agree on advance payments in writing. A reasonable advance to cover material purchases is standard, but an excessive amount requested before work starts warrants careful scrutiny.

Can I negotiate after analysing my quote?

As long as you have not signed the offer, you are free to discuss each line item, decline certain options, or request the removal of ambiguous clauses. You can also seek other competing proposals to compare the services objectively.

Updated on 2026-11-21

The other free tools