Unheated cellar slab: U-value calculation for underside insulation

Calculate the U-value of your unheated cellar slab insulation in our free browser tool. Compare project thermal limits directly online without registering.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Unheated cellar slab: why and how to insulate it

Insulating the ceiling of an unheated cellar helps limit heat loss towards cold basement rooms and improves comfort on the ground floor. On the construction site, installing insulation on the underside of a slab is a common intervention, whether during renovation or new construction. The lower floor separates a tempered space from a volume subject to thermal variations from the ground and natural ventilation.

This page opens the Insulation Studio tool directly on the preset "Unheated cellar slab". The starting configuration presents a generic cross-section composed of a screed, a reinforced concrete load-bearing slab, and insulation fixed to the underside. You can easily modify the composition of the load-bearing element, the thickness of each component, and the physical characteristics of the materials.

The layer builder allows you to add or remove rows according to your actual take-off. You can reorder elements using the keyboard or drag-and-drop, define the role of each layer (load-bearing support, screed, thermal insulation), and adjust the total thermal resistance of the slab according to project requirements.

Downward heat flow and surface resistances: reading the U-value

For a slab over an unheated room, heat transfer occurs from top to bottom. This is a downward heat flow. Heat transmission in this physical configuration differs from that of a façade wall or a roof, because warm air rises and stabilizes the air layer at floor level.

The studio automatically adjusts the interior and exterior surface thermal resistances according to this downward flow direction. The calculation incorporates these parameters to establish the resulting U-value of the complete slab. The tool also determines the total thickness of the structure as well as its overall mass per unit area.

In addition to stationary heat transmission, the engine calculates thermal phase shift and damping for the entire cross-section. This data provides practical insight into the behavior of the assembly in response to slow temperature fluctuations in the basement.

Comparing the U-value to the project limit value

To evaluate your element, the preset displays a direct comparison with a reference requirement. It automatically suggests the text "MuKEn 2025, new construction: opaque element against unheated or earth-buffered room at more than 2 m", read at source on November 17, 2026. The tool does not issue any regulatory verdict: it simply indicates whether your calculated U-value is "less than or equal to" or "greater than" the selected threshold.

You can select another predefined benchmark, such as a renovation case or Building Programme thresholds, or directly enter the limit value indicated in the project description. No cantonal rule is injected automatically without your action, as each canton transposes MuKEn principles according to its own energy legislation.

For the thermal protection of buildings, the usual professional references remain SIA 180 standard and, for thermal energy requirements, SIA 380/1 standard, to be consulted in their currently applicable editions. The displayed calculation remains a technical decision-making aid and does not replace validation by the competent authority.

Choosing underside insulation: Swiss catalog and manufacturer values

The studio reads a Swiss product catalog in a static file updated weekly. The data comes from Declaration of Performance (DoP) sheets provided by manufacturers. The selectable thicknesses correspond solely to formats actually manufactured and marketed, with filters by brand and trade name.

As long as this file is not published, or if your material is not listed, a generic material library remains accessible. You can manually modify the thermal conductivity of any layer to reflect the exact figures from the technical datasheet of the product delivered to your construction site.

The studio also allows you to enter the reaction-to-fire class for each layer. The analysis table by height category provided in the interface is configured to assess external façade insulation: for a cellar slab, it indicates that nothing needs to be checked with this preset.

KBOB environmental assessment of the insulated slab

In addition to thermal performance, the studio integrates an environmental assessment component. For each material associated with a KBOB database entry, the tool calculates the footprint of the insulated slab based on three major indicators: total embodied energy, greenhouse gas emissions, and total ecological scarcity points.

This multi-criteria approach allows designers and trade contractors to quickly visualize the environmental impact of a mineral insulation board compared to a synthetic or bio-based insulation applied to the underside. You can thus evaluate the balance between thermal performance and the environmental load of the construction.

What the free version does not do for a cellar ceiling

The free version works without registration or account creation. It operates entirely within your web browser: no file is transmitted to a server, nothing is stored online, and no data is kept in local cache memory. Closing the page or reloading the tab erases all your work. Paper printouts feature an Art Construction watermark, and the exported CSV file mentions the free version.

The engine performs a one-dimensional analysis under steady-state thermal conditions. It does not integrate linear thermal bridges, such as the junction between the floor and partition walls or cellar wall heads, nor complex three-dimensional calculations. Furthermore, the ambient temperature of the cellar is not modeled: the studio applies the surface resistances of the downward direction without establishing the overall thermal balance of the basement.

The default takeoff generated for this preset lists the items for interior lining; it is therefore up to the estimator to check it item by item for an underside fixing. Generic values are provided as orders of magnitude. To keep your slab studies from one construction site to another, discover Tenders and the ERP.

Switch to Tenders or the ERP to keep the slab by construction site

The free version includes no unit prices: only the prices you enter yourself in the takeoff matter. To keep a thermal study from one construction site to another, the subscription to Tenders and ERP provides the tracking functions needed by construction companies.

With the Pro version, you can save each slab by construction site, in the ERP, with successive versions, and resume a study at any time.

The insulation report is printed as a PDF with the company letterhead, without watermark, and the unit prices entered in the takeoff are saved with the project. To discover these functions, consult Tenders or the ERP.

Frequently asked questions

How is the direction of heat flow taken into account for a cellar slab?

The studio automatically selects the surface resistances adapted to the downward flow to determine the U-value. As heat moves from the heated room to the cellar located below, this orientation modifies the surface air exchange coefficients compared to a vertical wall or roof.

Does the calculation take into account the slab junction thermal bridges?

The calculation is performed in one dimension under steady-state conditions across the slab cross-section. It does not model linear thermal bridges located at connections with exterior walls, partition walls, or concrete beams, which require a separate thermal analysis.

Where do the data for the insulation materials offered in the Swiss catalog come from?

The technical values come directly from declarations of performance published by manufacturers. The list is updated weekly via a static file. It only offers thicknesses actually produced on the Swiss market, with the values from their datasheets.

How to interpret the MuKEn 2025 limit value displayed by the studio?

The tool simply compares your U-value to the MuKEn 2025 reference value for an element against an unheated room. It indicates whether your result is less than or equal to, or greater than. It does not issue any legal validation, as application depends on the energy law adopted by each canton.

Can the generated take-off be used directly to install the insulation on the ceiling?

The take-off model proposed by this preset is based on the structure of interior lining. On the construction site, you must adapt the descriptions and mechanical or adhesive fixings to the actual conditions of installation under a cellar ceiling.

Do my insulation calculations remain saved if I leave the browser?

In the free version, nothing is stored online or saved in your browser's cache. If you close or reload the page, your data is erased. You must export your work to CSV or print the sheet before closing the tab.

What does the paid version allow for cellar insulation?

The free version includes no prices: the takeoff gives quantities, and you can enter your own unit prices there. The paid version, in Tenders and ERP, saves each slab by construction site with its versions, and produces a report without watermark on your company letterhead.