Loading...
About this tool
The wall base above a cold basement: a cumulative thermal bridge
On a construction site in Switzerland, the connection between the facade and the lower floor is a sensitive point for the thermal envelope. When the load-bearing wall rests on a slab above an unheated basement, the heat flow escapes simultaneously in two directions: horizontally towards the outside air and vertically through the masonry towards the reinforced concrete basement slab.
This accumulation of heat loss creates a significant concentration of flux at the inner corner between the floor and the wall. Without specific treatment at the base of the masonry, the high thermal conductivity of standard brick or concrete generates a noticeable drop in the internal surface temperature. In our two-dimensional studio, you model this cross-section using four-node rectangular finite elements on a non-uniform grid. You can observe directly on the thermal map the concentration of isotherms and the location of the pin on the cold spot.
The calculation yields the linear thermal transmittance coefficient at external dimensions, denoted Ψe, as well as at internal dimensions, denoted Ψi. The applied relationship is Ψ = L2D − Σ U·l, where L2D represents the thermal coupling coefficient resulting from two-dimensional conduction, while the U-values and lengths l designate the adjacent standard walls. The studio displays each intermediate value to allow you to check the calculations by hand.
Load-bearing insulation block at the base of the masonry: what it corrects and what it leaves
To stop the vertical leakage of heat towards the basement slab, a common solution consists of laying a first course composed of a load-bearing insulation block, such as cellular glass or a specific insulating brick. Cellular glass offers thermal conductivity significantly lower than that of standard masonry, while supporting the vertical loads of the building.
This thermal break effectively interrupts the downward flow. On the before-and-after comparator of the corrective solution, you can observe the drop in Ψe; also read fRsi and the surface temperature: with the starting values, they do not necessarily vary in the same direction as Ψe. The display indicates whether Ψe is "less than or equal to" or "greater than" the entered limit and target values, derived from working benchmarks for SIA 380/1 standard requirements.
Nevertheless, the load-bearing insulation block does not correct the entirety of the thermal bridge on its own. If the exterior facade insulation does not extend down to cover the edge of the slab or if the continuity with the perimeter insulation presents a discontinuity, a thermal pathway remains towards the slab concrete. The conductivity of the insulating course in the tool must be adjusted by faithfully using the data from the manufacturer's technical datasheet.
Under-slab insulation and perimeter insulation: the whole assembly counts
The efficiency of the wall base depends on the interaction of three distinct elements: the insulation block at the base of the masonry, the external facade insulation which extends as perimeter insulation on the subfloor, and the insulation installed under the ceiling of the unheated basement or under the slab.
The costly mistake made on site occurs when trades intervene without coordination: the mason lays the load-bearing block without checking the alignment with the future external insulation, or the facade installer stops the insulation at ground level without extending it down the perimeter. The concrete then finds itself in direct contact with the cold environment. The action that avoids this mistake consists of accurately setting the thickness of the under-slab insulation and the depth of the perimeter insulation during the preparation of the bill of quantities.
The studio makes it possible to vary these thicknesses in millimeters to observe the evolution of the annual loss in kilowatt-hours. This annual loss is calculated according to the formula: Ψe × detail length × degree-days × 24 / 1000. You freely enter the detail length, the degree-days of the selected climate station, as well as the unit cost of energy to measure the overall thermal impact of the assembly.
Assumption of the unheated basement treated as the exterior
The two-dimensional model of the studio is based on a simplified assumption: the volume of the unheated basement is treated as the exterior environment, and the surrounding terrain is not modeled. This common approach in the preliminary design phase allows for rapid calculation of steady-state conduction in the browser.
The solver performs two successive resolutions on the mesh. The first is an energy pass, applying an internal surface thermal resistance of 0.13 m²·K/W. The second is a moisture pass, using a resistance of 0.25 m²·K/W to identify condensation risks. Temperatures are resolved between 0 and 20 °C before being scaled to the actual conditions entered for the exterior and interior.
This method provides decision support for comparing different wall base variants. It does not replace the complete analysis of a building physicist or validation by the competent authority. The solver has been verified against analytical solutions and a second independent solver, but the cases in the annex of standard EN ISO 10211 have not been re-run, and no external body has validated the studio. Art Construction is independent of SIA, CRB, and CFST.
Quantity surveying of the insulating wall base: quantities without prices
In the free version, the studio generates a bill of quantities without prices, codes, or ACIP database descriptions. For the wall base, it provides a single line: the load-bearing insulation block, equal to the length of the detail, in meters, with its visible formula. Operation is 100% within your browser: no files or data are sent to a server, nothing is saved, and closing or reloading the tab erases everything. Printing the sheet carries an Art Construction watermark, and the CSV export mentions the free version.
To go further in preparing estimates, the paid version in tenders, the ERP, and the Portal allows you to price items using the ACIP database on a server, save variants per construction site with version management, and export complete reports without watermarks for the client.
Mold in the floor and wall corner
Excessive temperature drop at the junction between the baseboard and the screed can lead to severe damage. When the relative humidity of the indoor air meets a wall that is too cold, the risk of fungal growth increases, particularly behind furniture or wooden baseboards where air circulation is restricted.
The studio calculates the surface temperature factor fRsi, the dew point, and the critical mold temperature according to the entered surface relative humidity. It displays a three-level assessment: situation above critical temperature, risk of mold, or surface condensation. The allowable threshold depends on the outside temperature chosen from stations such as Geneva, Zurich, La Chaux-de-Fonds, or St. Moritz.
From a contractual standpoint in Switzerland, a moisture or mold problem constitutes a defect in the construction work within the meaning of the Code of Obligations (CO) and the rules of SIA standard 118 if agreed upon between the parties. The site manager or contractor who identifies a design weakness during the tender stage has a duty to warn the client to prevent potential subsequent disputes.
Frequently asked questions
How does the 2D thermal calculation work in the browser?
The calculation runs entirely within your browser using the four-node rectangular finite element method on a non-uniform grid. It performs two successive resolutions to evaluate the energy flux and moisture risks with their respective surface resistances. The energy balance is checked at each step without any data passing through an external server.
Why use a cellular glass block at the base of the facade?
The cellular glass block combines high mechanical resistance capable of supporting the weight of the masonry with low thermal conductivity. It forms a barrier against the downward transmission of heat towards the cold reinforced concrete slab, which decreases the Ψe coefficient.
Is my calculation data retained after closing the browser?
No. In the free version, nothing is sent or saved on a server, and no browser memory is used. If you reload the page or close the tab, all your entries are erased. To save your construction sites and keep successive versions, you can use the paid suite in tenders, the ERP, or the Portal.
Does the studio validate Swiss legal requirements of the SIA 380/1 standard?
No, the studio does not display any official regulatory pass or fail verdict. It simply compares the calculated result Ψe to the limit and target values you enter, then indicates whether the value is lower, equal, or higher. These results constitute technical assistance and do not replace the justifications of a building physicist.
Can the thermal conductivity of pre-recorded materials be modified?
Yes. The studio offers eighteen starting materials including concrete, bricks, cellular glass, and various insulations such as EPS, PIR, or mineral wool. Their conductivity values are indicative. You must replace them with the values declared on the manufacturer's technical datasheet corresponding to the product used on your construction site.
What should I do if the thermal bridge value Ψe turns out negative?
Ψe refers to external dimensions: standard walls are counted over their entire external length. In an external corner, the inner surface receiving heat is smaller than the outer surface; the sum Σ U·l_e then exceeds the calculated flux, and Ψe becomes negative. This is not an error: the studio keeps the value as is, unless you check the option to cap it at zero.
What are the limitations of the assumption of an unheated basement treated as the exterior?
The model considers the basement temperature identical to that of the outside air and does not take into account the inertia or thermal insulation provided by the natural ground. This simplifying assumption generally overestimates the calculated heat losses. For a detailed analysis of underground heat flows, a specific geothermal or three-dimensional study remains necessary.