Loading...
About this tool
Box-in-a-box: the mass-spring-mass principle
The box-in-a-box principle relies on complete mechanical separation between the load-bearing structure and the interior linings. On the construction site, you commonly encounter this setup when renovating residential buildings or creating sensitive rooms. For a partition wall, the physical principle involved is the mass-spring-mass system. The existing load-bearing wall constitutes the first heavy mass. The decoupled dry lining forms the second mass, while the air cavity filled with an absorbent material acts as a spring.
In the Isolation Studio, this behavior is configured using the preset named "Box-in-a-box (wall)". The initial model features a generic composition including plasterboard facings on a self-supporting framing, a cavity filled with absorbent material and the load-bearing wall. You can modify the thicknesses and densities of each layer to replicate your actual construction site situation. The sound reduction index of the support wall alone is first evaluated according to the mass law, based on its surface mass. If the support proves too light, an alert informs you that the calculation falls outside the usual application range of this law.
The effectiveness of the lining does not simply add to that of the load-bearing wall. The studio models the coupling between the two walls to determine whether adding the facing provides an acoustic gain or a decrease in overall performance. The evaluation runs entirely within your web browser, without creating an account. You adjust the framing components to immediately visualize the physical behavior of the assembly before establishing your installation takeoff.
The cavity, absorbent and resonance frequency
In a mass-spring-mass system, the stiffness of the spring depends directly on the thickness of the air gap and the presence of a fibrous absorbent. When the acoustic wave strikes the first facing, the cavity transmits energy to the second wall. If the cavity remains empty, the trapped air acts as a rigid spring creating standing waves. The introduction of mineral wool or fibrous insulation dampens these internal resonances and softens the overall behavior of the spring.
The Isolation Studio calculates the natural resonance frequency of the system, denoted f0, from the surface mass of the heavy wall, the surface mass of the added facing and the declared stiffness of the cavity. If you configure a dry lining without any air gap against the support wall, the studio triggers an explicit alert indicating the absence of a cavity. The stiffness is recalculated as soon as you check the presence of an acoustic absorbent inside the construction void.
This calculation yields the gain or penalty of the lining. Below frequency f0, the lining provides no noticeable improvement. Beyond this resonance frequency, the damping becomes effective and the acoustic gain increases with frequency. The objective in the field is therefore always to push this frequency f0 as low as possible into the acoustic spectrum by increasing the mass of the facings or the thickness of the plenum.
Above 160 Hz: when the lining worsens noise
A frequent design error consists in installing a lining that is too thin, too rigid or glued directly to the existing wall. When the cavity is narrow and the facings are too light, the resonance frequency f0 rises into the spectrum of common audible frequencies, notably those of the human voice or usual household noises. In this situation, the mass-spring-mass system enters resonance and transmits vibrational energy from one mass to the other instead of attenuating it.
The studio incorporates a specific control: a visual alert triggers as soon as frequency f0 exceeds 160 Hz. When this limit value is crossed, the lining is not only ineffective, it degrades the insulation of the load-bearing wall by creating a vibrational bridge that amplifies the noise perceived by the neighbor. This amplification in the audible range is very frequently encountered when installing an insulating composite glued with dabs or fixed to a thin rigid insulation.
As soon as the lining generates an acoustic penalty, the studio displays a warning to signal that the composite wall is less performant than the original raw wall. To correct this issue before preparing tenders, the quantity surveyor or site manager must increase the depth of the self-supporting framing, insert an absorbent fibrous mattress or double the plasterboards to make the added facing heavier.
Execution acoustic bridges: edge strip, junction boxes and ties
The real quality of a box-in-a-box depends entirely on the care taken with mechanical decoupling on the construction site. A dry lining perfectly dimensioned on plans can lose all its effectiveness due to a rigid connection with the structural work. The studio allows you to integrate these field realities by checking several frequent execution defects to evaluate their direct impact on performance.
You can simulate the omission of the perimeter resilient strip under the floor tracks and at the top of the partition. This omission applies a heavy acoustic penalty, because the vibrations of the slab transmit directly to the metal framing. Similarly, you can declare the presence of back-to-back recessed electrical boxes in the partition, which creates direct transmission through the partition.
The type of connection between the framing and the load-bearing wall constitutes another determining factor. The studio offers a stiffness parameter for ties or hangers:
- Zero value: self-supporting framing, without rigid tie to the load-bearing wall.
- Hanger or pad: you enter the rigidity indicated on its data sheet.
- Rigid fixation: it yields a high value, and the lining result drops.
Depending on these choices, the final result appears as a predictable reduction range incorporating the selected execution penalties.
Comparing the result to the entered requirement (SIA 181 standard levels)
To decide on the feasibility of a work, construction professionals in Switzerland refer to the noise protection requirements in buildings set by the SIA 181 standard. The studio offers three requirement levels: minimum, increased (condominium ownership, terraced houses) and special, defined by agreement.
The Isolation Studio does not pre-fill any figures or automatic regulatory values issued from the standard. As a user, you enter the target decibel requirement yourself for your construction site. The studio compares the calculated reduction value to this manual instruction and displays the mention "achieved" or "not achieved", accompanied by the available margin expressed in dB. This indication remains an indicative result to guide you in your construction choices.
Furthermore, flanking transmissions via slabs and facades are not calculated in this interface. To avoid overestimating the result, the studio caps it at a maximum it retains, with an alert message. Finally, for an interior wall separating two heated rooms, the hygrothermal calculation is not activated because the exterior climate does not apply to these party walls.
The separating floor: impact noise of a floating screed
The box-in-a-box principle also concerns party floors. In the Isolation Studio, one technical section is processed at a time: vertical walls and floors are not merged into a single three-dimensional model. To analyze the slab, you switch to the preset "Separating floor (condominium ownership, impact noise)". This module examines the interaction between a load-bearing concrete slab, a resilient underlayer and a floating screed.
The calculation begins by estimating the impact noise level of the bare slab, denoted Ln,eq,0,w. The studio then calculates the natural resonance frequency of the floating screed laid on its acoustic underlayer. The attenuation of impact noise depends mainly on the dynamic stiffness of the resilient material. You take this value from the technical data sheet of the floor insulation manufacturer and enter it manually into the layer properties.
The studio calculates the impact noise level reduction provided by the screed and determines the resulting weighted standardized impact sound pressure level L'n,w. If the edge strip is omitted during casting, the mortar comes into direct contact with the wall. You can check this anomaly in the tool, which applies an immediate degradation of the final index. The obtained result is then compared to the impact noise requirement you entered for the project.
What the free version does not do for acoustics
The online accessible version of the Isolation Studio allows rapid evaluation of a wall assembly, but includes well-defined usage limits:
- Theoretical formulas from literature: algorithms rely on common physical equations equipped with modifiable calibration constants, without control against SIA 181 standard tables. Only an on-site measurement is authoritative.
- Absence of a three-dimensional model: the tool processes a single constructive section at a time. The wall, suspended ceiling and floating floor are analyzed separately, without modeling the overall interaction of a complete room.
- Absence of flanking transmission calculation: the path of waves through adjacent walls and floors is not modeled in the tool, which justifies the automatic capping of calculated gains.
- Decision support tool: the provided indications in no way replace the technical study of a specialized office nor the authorizations issued by competent authorities.
- Unstored data: the calculation takes place 100% in your web browser. Nothing is sent to a server and no memory is kept. If you close or reload the tab, your entries disappear. The printout carries an editor watermark and the CSV export mentions the free version.
Switch to Tenders or the ERP to keep the partition by construction site
Once the lining or floating screed assembly has been validated from a physical standpoint, the next step is to quantify the materials. The free version generates the take-off for the lining: metal studs, perimeter tracks, acoustic hangers, perimeter resilient strips, acoustic wool, vapour retarder, airtightness tape, plasterboard or gypsum-fibre boards in cross-layer installation, screws and perimeter joint mastic. Unit consumption ratios remain editable by the user, and you can enter your own unit prices, but this free version does not provide any prices.
To keep this study from one construction site to another, you can switch to Tenders and the ERP. In the paid version, the lining is saved by construction site, in the ERP, with successive versions, and you can reopen it at any time.
The insulation report is printed as a PDF with your company letterhead, without a watermark, and the unit prices you entered in the take-off are saved with the project. To discover these features, consult Tenders or the ERP.
Frequently asked questions
How does the surface mass of the wall influence acoustic insulation?
Surface mass determines the wall's inertia against airborne sound waves. The higher the mass per square meter of the heavy wall, the more it opposes being set into vibration by air energy. In the studio, the mass law calculates the initial acoustic reduction index of the raw support before the potential addition of a decoupled dry lining.
Why must the resonance frequency not exceed 160 Hz?
Below its resonance frequency f0, a lining does not isolate and transmits energy. If f0 is located above 160 Hz, this resonance falls into the zone of voice and television noises. The lining then acts as a resonance box that amplifies audible sounds and degrades the initial performance of the load-bearing wall.
Why doesn't the calculation integrate the building's flanking transmissions?
Flanking transmissions depend on the three-dimensional structural connections between cross walls, facades and concrete slabs of the building. The studio analyzes solely a wall section in direct transmission. To avoid overestimating the real measurable insulation on site, the studio caps the result at a maximum it retains.
What performance difference is observed between a self-supporting framing and a framing fixed to the wall?
A self-supporting framing possesses no rigid contact point with the existing wall, which eliminates the direct passage of solid-borne waves. If you add rigid mechanical fixings without absorbers, mechanical vibrations short-circuit the air gap. The studio takes this into account via the stiffness of the ties you enter, and the lining result drops.
How to enter dynamic stiffness for the floating screed calculation?
Dynamic stiffness characterizes the elasticity of the resilient underlayer placed under the screed. This physical value is provided by the acoustic insulation manufacturer in their technical documentation. You must enter this figure directly into the studio's insulation layer parameters to calculate the floating floor's resonance frequency.
Are my acoustic calculation data stored online?
In the free version, processing is done exclusively in your browser. No information is transmitted to a remote server and no trace is recorded in your browser's memory. As soon as you refresh the page or close the window, all entered data and settings are erased.
Does the displayed result validate the legal requirements of my construction site?
The studio compares results to the quantified requirement you personally enter, indicating the mention achieved or not achieved with the margin. This indicative result constitutes a design aid. It replaces neither the detailed calculations of an acoustician, nor on-site acoustic measurements, nor the formal decisions of site management.