Loading...
About this tool
What a house construction site plan contains
Organising space on a detached house plot requires precision right from the preparatory phase. On a often restricted surface, the site manager and builder must coordinate work areas, traffic routes and sanitary facilities. The studio directly opens a complete example for a house. You will find a typical plot, the building footprint, a quick-assembly crane, three skips for waste sorting, a toilet cabin, a storage container for tools, and mesh fencing equipped with a gate for truck access.
Every element placed on the plan can be selected, moved or resized according to the actual configuration of your plot. This example serves as a modifiable working basis. The tool includes a control table with clickable alerts to check distances and footprints. It also generates a schedule of installations: fencing length, crane type with planned rental weeks, number of sanitary facilities and storage containers. This schedule can be exported in CSV format, while the global diagram can be downloaded as a PNG image.
Use takes place entirely within your web browser, without creating an account or prior registration. The drawn elements and schedules remain in your browser's local memory. If you close the tab, all data is erased. No information is saved on an external server, apart from the read-only display of the swisstopo map background if you enter an address.
Placing the crane: reach, counter-jib and neighbourhood overflight
Choosing the crane location determines the progress of the structural work. For a house, a quick-assembly crane is frequently chosen to supply earthworks, masonry and framework. The studio allows you to position the machine, adjust the jib length and orient the counter-jib to check access to the various unloading areas.
In the proposed model, the jib exceeds property boundaries. The studio detects this situation and displays a visual alert indicating neighbourhood overflight. It specifies the portion of the jib extending outside the perimeter as well as the measured excess distance. This notification does not constitute a technical or legal prohibition: it highlights a practical point to be sorted out beforehand with the concerned neighbours and the machine supplier, particularly regarding overflight agreements or orientation devices.
A frequent mistake consists in setting the crane position solely in relation to the ridge of the future house, forgetting the trajectory of the counter-jib during full rotation. When the latter hits a slope, a preserved tree or an overhead line, assembly becomes impossible on delivery day. Visual control of the rear radius in the studio helps position the chassis while taking actual terrain obstacles into account.
Sorting skips, toilets and site facilities: how many to plan
Hygiene and waste management on a house construction project require facilities proportionate to the size of the team on site. The model defaults to a workforce of six people. Based on this parameter, the studio calculates theoretical needs: the number of toilet cabins, the minimum surface area required for site facilities and the number of skips required to sort materials.
The system then compares these calculations to the objects actually placed on your workspace. It simply indicates whether the expected level is "reached" or "not reached". No regulatory opinion is issued by the studio. Pre-programmed reference ratios (such as one sanitary unit for fifteen people, rest areas or selective sorting) come from the tool's internal manual. These data must be compared against the requirements of cantonal directives and construction work ordinances applicable to your construction site.
All calculation values can be modified in the side panel to adapt to the actual staffing levels of successive trades, from earthworks down to finishes. This check prevents premature cluttering of the plot by oversized site huts or, conversely, insufficient sanitary facilities for workers.
Fencing, gate and truck access
Site demarcation ensures the separation of the work area from the public domain and neighbouring properties. The model incorporates continuous mesh fencing along property boundaries, interrupted by a gate reserved for heavy vehicle traffic. The studio automatically calculates the total length of barriers installed and adds it to the schedule table.
The gate layout must take into account the turning radii required for delivery trucks, concrete mixers and dumpers. An entrance that is too narrow or poorly aligned with the road blocks local traffic and forces drivers to manoeuvre on public roads, causing supply delays.
On the plan, you can move fencing panels, adjust gate width and position heavy material storage areas near access points. This organisation avoids unnecessary manoeuvring on stripped soil and limits the risk of getting bogged down during bad weather. The linear schedule obtained in a few clicks directly serves to list material requirements for the installation phase.
Map background and plan scale
To work on a basis faithful to reality, two solutions are available in the online tool. The first consists in using the search field to enter the postal address or plot reference. The studio then loads the official swisstopo map background at exact metric scale. You immediately view property boundaries, surrounding buildings and road access.
The second possibility allows you to import a situation plan or cadastral extract in PDF format. After importing the document, a calibration function prompts you to designate two points at a known distance, such as a building facade or plot boundary. The software then adjusts the workspace scale to this reference.
Technical objects (crane outriggers, containers, skips) maintain consistent proportions with the terrain. This scaling avoids drawing installations that might seem suitable on a theoretical diagram, but would not account for actual setback margins once on site.
What the free version does not do
Free use of the studio involves clear technical limits that should be understood before starting a study. The plan provided initially is an illustration without a real address, with basic dimensions that you must correct according to your mandate's constraints. Goal achievement calculations rely on modifiable ratios and replace neither the health and safety plan for the construction site nor permits issued by municipal or cantonal services.
Functionally, this free version does not allow you to save your file to a remote space, nor to keep a history of successive versions. Work is not saved if you leave the page or close your browser. The tool incorporates no unit price, no ACIP database and establishes no financial costing for services.
Visual export remains limited to a standard image file in PNG format, and the schedule is limited to a raw quantity file in CSV format. To keep your files sustainably and transform these schedules into structured financial quotes, upgrading to a dedicated management solution is necessary.
Switching to Tenders to price the construction site
Once your house construction site layout is defined, quantities surveyed by the studio can be used to precisely price the operation. This financial valuation step takes place in the Tenders software, which constitutes the only paid gateway connected to this module. The installation plan generates a raw quantitative summary of fencing, the crane, containers and sanitary facilities, which you can integrate directly into your tender documents.
In Tenders, you apply prices from the ACIP database to value each item according to corresponding CFC categories. The software handles version management for your quotes, cloud backup to retrieve your files at any time, and Team mode to share progress with colleagues. Plan and quote exports are edited without watermarks, in your company's colours, ready to be forwarded to the client or integrated into contractual market documents.
Frequently asked questions
Is my construction site data saved online?
No. In the free version of the studio, all elements, plans and results remain locally in your web browser. Nothing is saved on a server. If you close the tab, all data is erased. Only the swisstopo map is viewed in read-only mode during an address search.
How do I get the exact scale for my house plot?
You can type your plot address in the search field to display the swisstopo map background directly to scale. You also have the option to import a surveyor's or architect's PDF plan and use the calibration tool by indicating a known length.
What does the neighbourhood overflight message displayed for the crane mean?
The studio indicates that the jib exceeds the terrain limit and specifies the length concerned. This is not a technical prohibition, but an alert to remind you to arrange an overflight agreement with neighbouring owners and set instructions with the crane operator.
Are sanitary and skip ratios legal rules?
No, these are reference values from the studio's manual (for example one toilet for fifteen people). The software displays "reached" or "not reached". You must adapt these parameters according to the construction work ordinance and applicable cantonal rules.
What file formats can be exported for free?
The free version allows you to download an image of the installation plan in PNG format as well as the quantitative list of installations (linear meters of fencing, number of skips, sanitary facilities, crane weeks) as a table in CSV format.
Does the studio provide a priced quote for the installation?
No. The free tool only calculates material quantities and rental durations. It contains no unit prices or ACIP data. Financial costing of these schedules is then carried out by importing data into the Tenders software.
Is Art Construction affiliated with Swiss professional bodies?
No. Art Construction is a software publisher entirely independent of SIA, CRB and suva. Mentions of tools or building uses do not constitute any affiliation with these professional institutions.