Concrete padstones under a beam: bearing calculation on masonry

Size the concrete padstone under a steel or timber beam on masonry. Free in-browser tool for bearing calculations in accordance with SIA standards.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Beam bearing on a wall: average stress and masonry limits

When creating an opening or installing a steel or timber beam, the total load carried by the lintel is concentrated at its ends. On a solid wall or an existing pier, this load path generates localised compressive stress precisely where the beam flange rests. Without a distributing element, the contact area remains limited to the beam's dimensions, which quickly leads to exceeding the bearing capacity of the substrate.

Verification is based on the principles of standard SIA 266 for masonry and standard SIA 260 for action combinations at ultimate limit states. The average direct bearing stress under the profile is compared with the design resistance of the load-bearing material, increased by a local diffusion factor set at 1.25. If the calculated compressive stress under the steel or timber remains less than or equal to this allowable limit, direct bearing remains feasible. However, as soon as the support reaction exceeds this load-bearing capacity, the risk of localised crushing requires the installation of a reinforced concrete padstone.

The structural studio calculates the support reaction from dead loads and live loads factored according to the building's use category, as well as climatic snow and wind actions from standard SIA 261. Five masonry types are offered with editable strengths, enabling immediate assessment of whether contact stress requires widening the bearing area.

Sizing the padstone: length, depth, and 45-degree load spread

The role of a C25/30 reinforced concrete padstone is to spread the concentrated beam reaction over a significantly larger bearing surface before transferring the load to the wall below. The principle of stress distribution relies on a theoretical 45-degree angle from the edges of the beam's bearing plate or flange down to the underside of the concrete block.

For this spread to occur correctly without shear or bending failure of the padstone, the element's geometry must adhere to a strict balance between its length and depth. If the depth of the padstone is too shallow relative to the lateral overhang, the load will not spread over the entire length and the masonry will suffer premature crushing beneath the central section. The studio automatically determines the necessary length and depth so that the stress transmitted to the underside of the padstone becomes less than or equal to the design resistance of the existing masonry.

On the construction site, execution requires careful cutting of the load-bearing wall to accommodate the padstone without disturbing the lower courses. Bearing surfaces must be levelled true. Note that the tool calculates the external geometry of the padstone (length and depth) without designing internal reinforcement, which must be detailed to resist the tensile forces generated by load diffusion.

Old or perforated brick: when padstones are no longer enough

In renovation, the condition and nature of the substrate dictate bearing feasibility. Traditional reclaimed clay bricks, modern thin-walled perforated bricks, or rubble masonry bonded with lime mortar exhibit low design strengths. When the load transferred from upper storeys and the roof is substantial, the required padstone may reach dimensions incompatible with the supporting wall.

Two physical limits necessitate abandoning direct bearing on a padstone:

  • The calculated padstone length exceeds 600 mm, resulting in excessive bulk and concreting difficulties beneath the beam.
  • The remaining width of the pier between the edge of the new opening and a wall corner or adjacent opening is less than 40 cm.

In these configurations, the residual masonry lacks the mass and lateral restraint required to sustain the concentrated load without risk of local buckling or diagonal cracking. The structural studio flags this constraint and shifts the design towards a full portal frame solution.

Two-column portal frame: buckling and concrete base pads

When the existing wall can no longer serve as a bearing, the load from the lintel beam must be supported by dedicated vertical columns, forming a closed portal frame. This solution transfers all vertical reactions directly to the foundations or the slab below, completely relieving the masonry pier.

The sizing of steel section columns (HEA, HEB series, or square hollow sections) is performed in accordance with the rules of standard SIA 263. The primary verification addresses the risk of buckling instability. In the tool, this check is conducted on the section's minor axis, using the clear height under the beam. If the axial compressive utilisation ratio, including the buckling factor, exceeds 100%, the column section must be increased.

At the column base, load concentration necessitates a concrete spreader pad or a lower padstone cast onto the floor slab or basement wall below. This base ensures the distribution of the downward load to prevent punching shear through the existing slab. The portal frame thus acts as a self-supporting structure, independent of the masonry weakened by cutting the opening.

Dry packing with non-shrink mortar: preventing settlement

A costly mistake on site occurs during the load transfer phase between the steel beam and the retained masonry overhead. Contractors frequently install the steel section, cast the padstone, and then strike the props before full, continuous contact beneath the upper wall is achieved, leading to cracking in upper-floor partitions and tiling.

Steel possesses high stiffness, but if any residual void remains above the top flange or under the bearing padstone, the supported wall will settle into the gap as soon as props are released. The essential technical procedure is dry packing with non-shrink mortar mixed to an earth-moist, stiff plastic consistency. This specialised mortar is rammed firmly home using a hardwood wedge and club hammer into the 2 to 3 cm gap reserved between the beam and the overhead masonry, as well as between the beam and its concrete padstone.

This packing must fully cure before removing heavy temporary shoring. The load transfer is then achieved without dynamic shock or differential settlement. The unpriced bill of quantities generated by the studio explicitly includes this non-shrink dry packing item to ensure the operation is not overlooked during construction site preparation.

Liability for an undersized bearing

Creating an opening in a load-bearing wall and modifying its supports are major structural interventions that engage the liability of the parties involved under the Code of Obligations (CO) (Code des obligations) and the Swiss Criminal Code in the event of endangering third parties. A preliminary calculation cannot justify site execution without formal approval.

Art Construction's structural studio provides preliminary sizing for decision support, assisting site managers and quantity surveyors during feasibility studies and when preparing a quote. It runs independently in the browser: no data is transmitted or retained on an external server, and closing the page clears your entries. Prints feature a free version watermark. To integrate these calculations into corporate workflows with project archiving and regional price book costing, discover our professional tools on our tenders module, manage your construction sites via the management portal, or explore advanced quantity takeoff features with our pro offer for plans.

Before starting any wall sawing on site, the studio's results must be reviewed by a structural engineering practice. Only a comprehensive calculation report accounting for the actual masonry condition, accompanied by signed working drawings and reinforcement schedules, authorises structural work to proceed.

Frequently asked questions

How do I determine whether a concrete padstone is required under a beam?

The calculation compares the direct bearing stress under the steel flange to 1.25 times the masonry's design compressive strength according to standard SIA 266. If the calculated stress exceeds this allowable limit, a reinforced concrete padstone is mandatory to enlarge the bearing area and prevent localised crushing of the wall.

What are the minimum dimensions for a load-spreading padstone?

The geometry depends on the applied load and the wall's bearing capacity. The padstone depth must allow 45-degree load spread without structural failure. In practice, if the calculated length exceeds 600 mm or the remaining pier width is under 40 cm, a padstone is no longer suitable and a steel portal frame must be used instead.

Why should non-shrink mortar be used above and below the beam?

Traditional mortar undergoes setting shrinkage, leaving a hairline gap between steel and masonry. Non-shrink mortar, tightly rammed at an earth-moist consistency, ensures continuous load transfer the moment props are struck, thereby preventing wall settlement and upper-floor cracking.

What are the limitations of the studio's structural calculation?

The studio relies on linear elastic calculations on two simple supports. It does not model three-dimensional whole-building interactions, does not design internal concrete reinforcement, and checks column buckling solely on the minor axis. It serves as preliminary sizing to assist decision-making prior to a civil engineer's detailed design.

How are snow and wind loads taken into account?

The studio applies the formulas of standard SIA 261 for ground and roof snow loads, as well as peak wind velocity pressure. Altitude is derived from the official swisstopo list of localities; eight Swiss locations are additionally pre-configured with their specific climatic parameters Δh and q_p0. For other municipalities, both default to 0 m and 0.9 kN/m² initially and can be overridden with standard map values.

Are my calculation data stored or shared?

Using the free version is completely anonymous and requires no registration. All processing runs locally within your web browser. Nothing is sent to or saved on a remote server. Refreshing or closing your browser tab deletes all entered construction site data.

What is the difference between the free version and the Pro version?

The free version provides calculations and quantity estimates with watermarks, without project save memory. The Pro version allows cloud saving and versioning, unwatermarked PDF reports branded with your company logo, team collaboration, and automated pricing with the ACIP cost database.