ACIP index: prices by trade (CFC) and by French-speaking canton
21 building trades and 7 French-speaking cantons (Vaud, Geneva, Valais, Fribourg, Neuchâtel, Jura, Bern): 147 pages of local prices. Each page gives the daywork rates by qualification, the canton's regional ACIP coefficient and the prices of eight actual items of the corresponding ACIP chapter, excl. VAT (HT), with a quantity simulator.
The prices come from the 2026 ACIP list (Art Construction Price Index); the differences between cantons come from the hub's wage reference /outils/. The CFC codes are those of the hub's CFC, eCCC-Bât and CAN translator (not verified with the CRB). The 21 trade PDF sheets are free: enter your e-mail address and you will receive the download link.
Find a local price or a PDF sheet
No accents or capitals needed. Examples: 211, electrical, painting valais, 232 GE, tiles fribourg.
Canton
VD Vaud · GE Geneva · VS Valais · FR Fribourg · NE Neuchâtel · JU Jura · BE Bern
Trades (CFC)
147 price pages and 21 PDF sheets.
No results.
Try a CFC number (211, 232, 285), a trade (masonry, electrical, painting) or a canton (Vaud, Geneva, Valais, Fribourg, Neuchâtel, Jura, Bern or VD, GE, VS, FR, NE, JU, BE).
The 147 price pages: choose a trade and a canton
Each link shows the daywork hourly rate of a skilled worker (CHF/h, excl. VAT) for the trade in the canton. Indicative: these figures constitute neither an offer nor a contractual price.
-
CFC 201 Earthworks
ACIP chapter no. 3 · CFC 201 -
CFC 211 Reinforced concrete
ACIP chapter no. 6 · CFC 211.4 -
CFC 211 Scaffolding
ACIP chapter no. 4 · CFC 211.1 -
CFC 211 Masonry
ACIP chapter no. 5 · CFC 211.5 -
CFC 213 Steel structures
ACIP chapter no. 7 · CFC 213 -
CFC 214 Timber structures
ACIP chapter no. 8 · CFC 214 -
CFC 222 Sheet-metal work
ACIP chapter no. 10 · CFC 222 -
CFC 224 Roofing
ACIP chapter no. 11 · CFC 224.0 -
CFC 224 Waterproofing and insulation
ACIP chapter no. 12 · CFC 224.1 -
CFC 228 Shutters and blinds
ACIP chapter no. 21 · CFC 228 -
CFC 232 Electrical work
ACIP chapter no. 13 · CFC 232 / 233 -
CFC 242 Heating and ventilation
ACIP chapter no. 14 · CFC 242 / 244 -
CFC 251 Sanitary installations
ACIP chapter no. 15 · CFC 251 -
CFC 271 Plastering and partitions
ACIP chapter no. 17 · CFC 271 -
CFC 272 Metalwork
ACIP chapter no. 19 · CFC 272 -
CFC 281 Tiles and ceramics
ACIP chapter no. 24 · CFC 281.6 / 282 -
CFC 281 Parquet
ACIP chapter no. 25 · CFC 281 -
CFC 281 Floor coverings
ACIP chapter no. 22 · CFC 281 -
CFC 285 Painting
ACIP chapter no. 27 · CFC 285 -
CFC 287 Site cleaning
ACIP chapter no. 28 · CFC 287
The 21 ACIP trade PDF sheets: free, on request by e-mail
Enter your e-mail address to receive the sheet: the download link is displayed immediately and remains valid for 7 days. Each sheet covers the 7 cantons: daywork rates by qualification, 15 items of the chapter with target price excl. VAT, labour share and output when known, and an SIA 118 checklist.
-
CFC 201PDF · 51 KB · 7 cantons
Earthworks
ACIP chapter no. 3 · CFC 201
Receive the PDF sheet -
CFC 211PDF · 52 KB · 7 cantons
Reinforced concrete
ACIP chapter no. 6 · CFC 211.4
Receive the PDF sheet -
CFC 211PDF · 50 KB · 7 cantons
Scaffolding
ACIP chapter no. 4 · CFC 211.1
Receive the PDF sheet -
CFC 211PDF · 51 KB · 7 cantons
Masonry
ACIP chapter no. 5 · CFC 211.5
Receive the PDF sheet -
CFC 213PDF · 51 KB · 7 cantons
Steel structures
ACIP chapter no. 7 · CFC 213
Receive the PDF sheet -
CFC 214PDF · 51 KB · 7 cantons
Timber structures
ACIP chapter no. 8 · CFC 214
Receive the PDF sheet -
CFC 222PDF · 50 KB · 7 cantons
Sheet-metal work
ACIP chapter no. 10 · CFC 222
Receive the PDF sheet -
CFC 224PDF · 51 KB · 7 cantons
Roofing
ACIP chapter no. 11 · CFC 224.0
Receive the PDF sheet -
CFC 224PDF · 50 KB · 7 cantons
Waterproofing and insulation
ACIP chapter no. 12 · CFC 224.1
Receive the PDF sheet -
CFC 228PDF · 49 KB · 7 cantons
Shutters and blinds
ACIP chapter no. 21 · CFC 228
Receive the PDF sheet -
CFC 232PDF · 50 KB · 7 cantons
Electrical work
ACIP chapter no. 13 · CFC 232 / 233
Receive the PDF sheet -
CFC 242PDF · 52 KB · 7 cantons
Heating and ventilation
ACIP chapter no. 14 · CFC 242 / 244
Receive the PDF sheet -
CFC 251PDF · 50 KB · 7 cantons
Sanitary installations
ACIP chapter no. 15 · CFC 251
Receive the PDF sheet -
CFC 271PDF · 51 KB · 7 cantons
Plastering and partitions
ACIP chapter no. 17 · CFC 271
Receive the PDF sheet -
CFC 272PDF · 51 KB · 7 cantons
Metalwork
ACIP chapter no. 19 · CFC 272
Receive the PDF sheet -
CFC 281PDF · 50 KB · 7 cantons
Tiles and ceramics
ACIP chapter no. 24 · CFC 281.6 / 282
Receive the PDF sheet -
CFC 281PDF · 50 KB · 7 cantons
Parquet
ACIP chapter no. 25 · CFC 281
Receive the PDF sheet -
CFC 281PDF · 50 KB · 7 cantons
Floor coverings
ACIP chapter no. 22 · CFC 281
Receive the PDF sheet -
CFC 285PDF · 50 KB · 7 cantons
Painting
ACIP chapter no. 27 · CFC 285
Receive the PDF sheet -
CFC 287PDF · 50 KB · 7 cantons
Site cleaning
ACIP chapter no. 28 · CFC 287
Receive the PDF sheet
Go further
- 📡 Radar Appels d’Offres Simap : les appels d’offres publics de construction (Simap et cantons)
- Observatory of construction price trends in Switzerland (2008-2026)
- The 78 free tools of the hub (salaries, contracts, standards, public procurement)
- Tool 2.1: real cost of a worker and daywork rate
- Tool 1.4: CFC, eCCC-Bât and CAN translator
- Soumission: price with the ACIP base
Independence notice: The ACIP index (Art Construction Price Index) is an independent statistical base compiled by Art Construction. The numbers and titles of CFC chapters and the references to SIA standards are mentioned purely as an indication of the sector classification customary in Switzerland. This site is neither affiliated with nor approved by the CRB or the SIA.
