Employer hourly cost in building services: heating, ventilation, air conditioning, plumbing

Work out what an hour of a building services fitter really costs, travel included, and the daywork rate that covers it.

Open the free studio →

Free, no account: your plans, schedules and figures stay in your browser.

In heating, ventilation, air conditioning and plumbing, a large share of the time is spent on the road between the workshop, the supplier and the sites, or on small breakdown call-outs. These hours are paid, and so are the travel allowances, but only part of them can be billed. A daywork rate set without taking this lost time into account makes the firm work at a loss on small jobs.

The employer hourly cost simulator calculates in the browser the pure hourly cost price and a recommended daywork rate, from your wages, your charge rates, allowances per productive day, equipment, overheads and margin. The starting values read at the source concern the CN for main construction: for building services, you enter the data of your collective agreement and your statements.

Worked example: daywork hour of a plumbing fitter with a van

A building services firm works out the cost of a plumbing fitter who sets off each day with a service van. Example values, to be replaced by those of your agreement and your statements: 40 hours a week, 52.14 weeks, 5 weeks of holiday, 9 paid public holidays, 24 non-productive hours a year, base hourly wage CHF 35.00, holiday pay 10.64 %, 13th salary 8.33 %, combined employer charges 17.5 %, travel allowance CHF 25 per productive day, equipment and tools CHF 1’500 a year, overheads 25 %, margin 8 %.

Employer hourly cost of a plumbing fitter (example values)
LineCalculationResult
Productive hours per year40 × (52.14 − 5) − 9 × 8 − 241’789.60 h
Annual gross wage65’996.00 + 7’021.97 + 6’082.40CHF 79’100.37
Employer charges (17.5 %)79’100.37 × 0.175CHF 13’842.56
Travel and equipment25 × 223.70 days + 1’500CHF 7’092.50
Total annual cost79’100.37 + 13’842.56 + 7’092.50CHF 100’035.43
Pure hourly cost price100’035.43 ÷ 1’789.60CHF 55.90/h
Recommended daywork rate55.90 + 25 % = 69.88 ; + 8 % = 75.47CHF 75.45/h

The 1’885.60 hours paid at the base wage (40 hours × 47.14 weeks) less 72 hours of public holidays and 24 non-productive hours give 1’789.60 productive hours, or 223.70 days of 8 hours. The annual base wage is 35.00 × 1’885.60 = CHF 65’996.00, to which holiday pay (CHF 7’021.97) and the 13th salary (CHF 6’082.40) are added.

The travel allowance in the example is counted per productive day, as in the simulator: 25 × 223.70 = CHF 5’592.50. The cost of the van itself (depreciation, fuel, insurance) is not a wage cost: it goes into overheads, here 25 %. The rate before rounding is CHF 75.47; the simulator rounds it to 5 centimes, or CHF 75.45.

With these example values, an hour of a plumbing fitter costs the firm CHF 55.90; the recommended daywork rate is CHF 75.45.

3 common mistakes in building services hourly cost

Not counting road time in the cost

If travel time is not billed separately, it reduces the productive hours. Enter it in the non-productive hours field: the cost of the billable hour rises accordingly.

Putting the van into the fitter’s hourly cost

The service vehicle is a cost of the firm, not part of the wage. Counting it both in allowances and in overheads means billing it twice and pricing yourself out of the market.

Forgetting standby duty and urgent call-outs

The supplements for standby duty and out-of-hours call-outs provided by your agreement are not in the simulator. They are calculated separately and billed with their own supplements.

How to use the simulator in 3 steps

  1. Describe the fitter and their working time
    Choose a wage class as an input slot and the age. Enter the weekly working time of your agreement, the paid public holidays and the non-productive hours, unbilled travel included. The hours table shows gross, paid, worked and productive hours.
  2. Enter wages, charges and allowances
    Enter the base hourly wage, the rates from your statements and the average travel allowance per day. If your agreement provides neither early retirement nor Parifonds, enter 0 in these fields.
  3. Test two rates and export
    Use scenario B for a fitter with less travel or another overhead rate. Compare the gaps per year and per productive hour, then export as CSV.

Open the free studio →

What the free version does not do in building services

The simulator has no minimum wage table for the building services agreement and no field for standby duty, night supplements or the vehicle: these are entered or calculated separately. It keeps nothing from one visit to the next, and the free printout carries a watermark.

The Art Construction ERP takes over the hourly cost, links it to the hours clocked per employee and to daywork sheets, and tracks the invoicing of your small jobs and call-outs.

Frequently asked questions

Which agreement applies in heating, ventilation, air conditioning and plumbing?

The collective agreement for the Swiss building services trade, concluded between suissetec and the Unia and Syna unions, in its 2025 version. Its provisions declared generally binding cover installation, repair and service firms; some cantons also have their own extended agreement. Check which one applies to your firm.

Where do I enter the travel allowance?

In the allowances step, as an average amount per productive working day. The simulator multiplies it by the number of productive days in the year.

Do I need a different rate for breakdown call-outs?

Often yes: travel time weighs more heavily there. Scenario B lets you calculate a cost with more non-productive hours and compare the two rates.

Does the result take the agreement’s minimum wage into account?

No, the hourly wage is your entry. The simulator does not check that it meets the minimums: it is up to you to take them from the agreement in force.