Employer hourly cost in timber construction and carpentry: workshop, erection and accident insurance

The same carpenter does not cost the same in the workshop and on the roof: the accident insurance premium and the allowances make the difference.

Open the free studio →

Free, no account: your plans, schedules and figures stay in your browser.

In German- and Italian-speaking Switzerland, timber construction falls under the trade’s collective labour agreement (GAV für das Holzbaugewerbe), whose generally binding status is renewed periodically by the Federal Council: check the decision in force on the SECO list. In French-speaking Switzerland, carpentry comes within the scope of the collective agreement for the finishing trades (CCT SOR). In both cases, the agreement sets the working time, minimum wages, holidays and joint contributions; whether there is an early-retirement scheme, and at what rate, must be taken from the applicable text.

What sets carpentry hourly cost apart above all is occupational accident insurance. The firm may have parts classified differently, for example cutting in the workshop and erection on site, with separate premiums set by the insurer. The simulator takes the LAA premium in per mille: by comparing two scenarios, one with the workshop premium, the other with the erection premium and site allowances, you get two hourly costs and two daywork rates.

Worked example: a carpenter in the workshop (A) and on erection (B)

A carpenter aged 38 (five weeks of holiday). Example values, to be replaced by those of your agreement, your statements and your policy: hourly wage CHF 32.00, 41 hours a week, 9 public holidays, 50 non-productive hours, 13th salary 8.3 %, allowances 2.0 %, LPP 7 % after CHF 26’460 of coordination, sickness 1.0 %, early retirement 0 in this example, joint contribution 0.5 %, tools and PPE CHF 2’400 a year, overheads 15 %, margin 8 %. Scenario A: LAA premium 45 ‰, no allowance. Scenario B: LAA premium 80 ‰, meals CHF 16 and travel CHF 10 per productive day.

Workshop and erection compared in the simulator (example values)
LineWorkshop (A)Erection (B)Gap B − A
Occupational LAA premium45 ‰ : 3’333.6580 ‰ : 5’926.482’592.83
Total employer charges14’001.1416’593.972’592.83
Allowances (meals and travel)0.005’735.605’735.60
Total annual cost90’482.1698’810.598’328.43
Pure hourly cost50.0254.624.60
Recommended daywork rate62.1067.855.75

Both scenarios have the same gross wage: 32.00 × 1’932.74 hours paid = CHF 61’847.68 base, CHF 6’555.85 holiday pay (10.6 %) and CHF 5’677.49 13th salary, or CHF 74’081.02. The productive hours are also the same: 1’858.94 hours worked less 50 non-productive hours = 1’808.94 hours, or 220.60 days of 8.2 h.

The LAA premium rises from 45 ‰ × 74’081.02 = CHF 3’333.65 to 80 ‰ × 74’081.02 = CHF 5’926.48. The erection allowances add CHF 26 × 220.60 days = CHF 5’735.60. The pure hourly cost rises from 50.02 to CHF 54.62; with 15 % overheads and 8 % margin, the recommended rates are CHF 62.10 (workshop, before rounding 62.12) and CHF 67.85 (erection, before rounding 67.84).

In this example, an erection hour costs CHF 4.60 more than a workshop hour; billing erection at the workshop rate would lose about CHF 5.75 per daywork hour.

3 costly mistakes in carpentry hourly cost

One LAA premium for the whole firm

If your policy separates the workshop and erection, an average premium underestimates the cost of erection. Take the premiums from your policy, part by part, and compare them in two scenarios.

Underestimating tools

Portable machines, consumables, maintenance, personal fall-arrest equipment: the annual amount per worker is often higher in carpentry than in other trades. Enter a realistic amount taken from your accounts.

Forgetting erection allowances

Meals and travel paid on erection days add to the cost of each productive hour. Leaving them out takes more than CHF 3 off every billed hour here.

Comparing workshop and erection in 3 steps

  1. Scenario A: the workshop
    Enter the working time, the wage, your fund rates and the LAA premium for the workshop part, in per mille, and set to 0 the allowances you do not pay.
  2. Scenario B: erection
    Copy A to B, replace the LAA premium with the erection premium and enter the meal and travel allowances per productive day.
  3. Set your two rates
    Read the comparison, then carry the two daywork rates over to your terms. Export the detail as CSV to keep a record of the rates used.

Open the free studio →

What the free version does not do in timber construction

No LAA premium is prefilled: the studio has no table of the insurer’s classes, the premium comes from your policy. The prefilled values are those of the CN for main construction; those of your timber agreement or of the finishing-trades agreement are entered by you. The studio does not split one year between workshop and erection: it compares two complete scenarios. Nothing is saved.

The Art Construction ERP links these costs to the hours clocked in the workshop and on each site, to daywork sheets and to invoicing, with documents without a watermark.

Frequently asked questions

Which agreement applies to a carpentry firm?

In German- and Italian-speaking Switzerland, the collective agreement for timber construction; in French-speaking Switzerland, the collective agreement for the finishing trades for carpentry. Check the scope of the text and the generally binding decision in force.

How do I enter an LAA premium of 8 %?

The studio expects per mille: 8 % corresponds to 80 ‰. The premium applies to the gross wage up to the maximum insured earnings.

Can I mix workshop and erection in one calculation?

Not directly. Calculate two scenarios, then weight the two hourly costs yourself by the share of hours spent in the workshop and on erection.

Does the studio know the early-retirement scheme for timber construction?

No. Enter the rate provided by your agreement, if there is one, in the early-retirement line, or 0 if your firm is not subject to it.