Landscaping follows the seasons: long weeks in spring and summer, short weeks and lost days in winter, work stopped by rain or frost. A daywork rate worked out on a summer week gives a cost that is too low; a rate worked out on the winter drives clients away. The right figure comes from the whole year.
The employer hourly cost simulator works on an annual average: average weekly working time, weeks per year, public holidays and bad-weather hours. From these it derives the productive hours, the pure hourly cost price and a recommended daywork rate, rounded to 5 centimes. The starting values read at the source concern the CN for main construction: for landscaping, you enter the data of your agreement and your statements.
Worked example: a landscaper’s daywork hour on annualised hours
A landscaping firm works out the cost of a skilled landscaper whose hours vary with the season. Example values, to be replaced by those of your agreement and your statements: 42 hours a week on an annual average, 52.14 weeks, 5 weeks of holiday, 9 paid public holidays, 80 bad-weather hours a year, base hourly wage CHF 29.00, holiday pay 10.64 %, 13th salary 8.33 %, combined employer charges 16 %, meal allowance CHF 14 per productive day, equipment and small tools CHF 1’000 a year, overheads 20 %, margin 8 %.
| Line | Calculation | Result |
|---|---|---|
| Productive hours per year | 42 × (52.14 − 5) − 9 × 8.4 − 80 | 1’824.28 h |
| Annual gross wage | 57’416.52 + 6’109.12 + 5’291.69 | CHF 68’817.33 |
| Employer charges (16 %) | 68’817.33 × 0.16 | CHF 11’010.77 |
| Allowances and equipment | 14 × 217.18 days + 1’000 | CHF 4’040.52 |
| Total annual cost | 68’817.33 + 11’010.77 + 4’040.52 | CHF 83’868.62 |
| Pure hourly cost price | 83’868.62 ÷ 1’824.28 | CHF 45.97/h |
| Recommended daywork rate | 45.97 + 20 % = 55.16 ; + 8 % = 59.57 | CHF 59.55/h |
With 42 hours a week on average, the normal working day is 8.4 hours. The 1’979.88 hours paid at the base wage less 75.60 hours of public holidays and 80 bad-weather hours give 1’824.28 productive hours, or 217.18 days. The annual base wage is 29.00 × 1’979.88 = CHF 57’416.52; with holiday pay and the 13th salary, the gross wage reaches CHF 68’817.33.
The total annual cost of CHF 83’868.62 gives CHF 45.97 per productive hour. Machines (mini-excavator, ride-on mower, shredder) are not wage costs: they are billed separately, with their own hourly rate, or go into overheads. The team’s daywork rate is worked out by adding up the rate of each employee.
With these example values, a landscaper’s hour costs the firm CHF 45.97 over the year; the recommended daywork rate is CHF 59.55, machines not included.
3 common mistakes in landscaping hourly cost
Working it out on a summer week
A 45-hour week in June says nothing about the year. Enter the average weekly working time of your annualised hours and the hours actually lost in winter.
Mixing the worker’s hour and the machine hour
A mini-excavator has its depreciation, fuel and maintenance. Adding it to the landscaper’s hourly cost makes your small manual jobs too expensive and hides the real profitability of the machine.
Ignoring the agreement that applies
The trade’s national agreement binds the members of the employers’ association; in some cantons, an extended cantonal agreement sets minimum wages and sometimes early retirement. Check what applies to your firm before entering your rates.
How to use the simulator in 3 steps
- Enter annualised hours
Choose a class as an input slot and the age, then enter the average weekly working time over the year, the paid public holidays and the average bad-weather hours of your last few seasons. The hours table shows the step down to productive hours. - Take wages, charges and allowances from your statements
Enter the hourly wage, the rates from your statements, the average meal allowance per day and the annual equipment. Enter 0 in the early-retirement and Parifonds fields if your agreement does not provide for them. - Compare and export
Use scenario B for a landscaping assistant or for a wetter year. Compare the gaps per productive hour, then export as CSV to build your teams’ rates.
What the free version does not do in landscaping
The simulator does not handle working hours that change week by week: it works on an annual average. It does not calculate a machine rate, does not contain the minimum wages of the landscaping agreements and saves nothing: closing the page erases what you entered. The free printout carries a watermark.
The Art Construction ERP links the hourly cost to the hours clocked per site and per season, tracks daywork sheets and invoicing, and shows you where your teams make or lose money.
Frequently asked questions
Is there a generally binding collective agreement for landscapers?
At national level, the trade’s agreement, negotiated between JardinSuisse and the professionals’ association Grüne Berufe Schweiz, applies to members of the employers’ association; no national extension was found in the sources consulted. Some cantons have an extended cantonal agreement with minimum wages: check with your cantonal labour office.
How do I take the winter into account in the rate?
By entering an annual average weekly working time and the bad-weather hours actually lost. The hourly cost obtained then covers the whole year, summer and winter alike.
Where do I put the cost of machines?
Outside the worker’s hourly cost: work out a separate machine hourly rate, or include the machines in your overheads if they serve every site.
Can I compare permanent staff with temporary staff for the high season?
Yes, the simulator’s “Temporary agency” tab compares the annual cost of a permanent hire with an agency rate and calculates the break-even point in hours and in months of assignment.