Free software · 100% in your browser · no data sent

Employer hourly cost in the finishing trades of French-speaking Switzerland (CCT SOR): paid hours, productive hours and RESOR

Joinery, plastering and painting, floor and wall coverings: the price of a daywork hour depends first on how many hours you can really bill.

Open the free studio →

Free, no account: your plans, schedules and figures stay in your browser.

The collective labour agreement for the finishing trades of French-speaking Switzerland (CCT SOR, second œuvre romand), declared generally binding by the Confederation, covers several finishing trades in the French-speaking part of the country, including joinery, carpentry, plastering and painting and various coverings; the exact scope and its exclusions are set out at the start of the agreement. Early retirement in these trades is governed by a separate agreement, the collective agreement on early retirement in the finishing trades of French-speaking Switzerland, managed by the RESOR foundation, not to be confused with the FAR of the main construction sector.

The employer hourly cost simulator was built with the values of the national agreement for main construction (CN), but every parameter can be replaced. For a finishing-trades firm in French-speaking Switzerland, you enter the working time of your agreement, your wages, the RESOR rate in the “Early retirement FAR / RESOR” line, your agreement’s joint contribution in place of the Parifonds, and your own allowances. The studio then calculates the productive hours, the annual cost, the pure hourly cost and the recommended daywork rate.

Worked example: hourly cost of a joiner-fitter

A joiner-fitter aged 40 (five weeks of holiday). Example values, to be replaced by those of your agreement, your statements and your policies: hourly wage CHF 31.00, 41 hours a week, 9 paid public holidays, 40 non-productive hours a year (bad weather, waiting, unbilled returns to the workshop), 13th salary 8.3 %, family allowances 2.0 %, LPP 7 % after CHF 26’460 of coordination, LAA 30 ‰, sickness 1.0 %, RESOR 1.25 % (employer share for 2026 according to the published amendment to the early-retirement agreement, to be checked), joint contribution 0.5 %, travel CHF 12 per productive day, PPE and tools CHF 700, overheads 18 %, margin 8 %.

From paid hours to productive hours, then to the rate (example values)
LineCalculationResult
Hours paid at the base wage41 h × (52.14 − 5)1’932.74 h
Hours worked1’932.74 − 9 days × 8.2 h1’858.94 h
Productive hours1’858.94 − 40 non-productive h1’818.94 h
Total annual costGross 71’765.99 + charges 13’326.31 + travel 2’661.84 + PPE 700CHF 88’454.14
Pure hourly cost88’454.14 ÷ 1’818.94 hCHF 48.63
Recommended daywork rate48.63 + 18 % then + 8 %, roundedCHF 61.95

The base wage is 31.00 × 1’932.74 = CHF 59’914.94; holiday pay 10.6 % = CHF 6’350.98; the 13th salary 8.3 % × (59’914.94 + 6’350.98) = CHF 5’500.07; the gross wage reaches CHF 71’765.99. Employer charges bring together AVS/AI/APG 3’803.60, AC 789.43, family allowances 1’435.32, LPP 3’171.42, LAA 2’152.98, sickness 717.66, RESOR 897.07 and joint contribution 358.83, or CHF 13’326.31. Travel counts CHF 12 × 221.82 productive days = CHF 2’661.84.

The pure hourly cost comes to CHF 48.63; overheads bring it to CHF 57.38 and the margin to CHF 61.97, rounded to CHF 61.95. If the workshop counted 120 non-productive hours instead of 40, the productive hours would fall to 1’738.94 and the pure cost would rise to about CHF 50.80: unbilled hours weigh as much as a pay rise.

For this joiner-fitter, the cost price is CHF 48.63 per productive hour and the recommended daywork rate CHF 61.95 excluding VAT; every extra unbilled hour pushes this cost up.

3 costly mistakes in finishing-trades hourly cost

Applying the FAR of main construction

The FAR concerns the main construction sector. The trades covered by the CCT SOR contribute to RESOR, at other rates. Using the FAR rate inflates the hourly cost by several francs.

Counting every hour on site as billable

Preparation in the workshop, loading, tidying up, waiting on site: these hours are paid but rarely billed on daywork. The studio has only one line for non-productive hours; group bad weather and unbilled hours there, and note what you put in it.

Forgetting the agreement’s joint contribution

The agreement provides for a contribution to enforcement and training costs, deducted from the wage and also paid by the employer. It is small as a percentage but applies to the whole payroll: enter it in the line provided for the Parifonds.

How to use it in 3 steps for a finishing-trades firm in French-speaking Switzerland

  1. Replace the CN values
    Enter the weekly working time and the public holidays of your agreement, then the class used as a slot for your worker. The studio flags “value changed: to be checked” on every line you change.
  2. Enter RESOR and your rates
    Enter the year’s RESOR rate in the early-retirement line, the joint contribution in place of the Parifonds, then your fund and policy rates. Set to 0 the allowances you do not pay.
  3. Test the non-productive hours
    Compare two scenarios A and B with 40 and 120 non-productive hours: the gap shows what unbilled workshop hours cost. Then export the detail as CSV.

Open the free studio →

What the free version does not do for the finishing trades

The prefilled values read at the source are those of the CN: no CCT SOR wage table or RESOR rate is built in, these are your entries. The studio does not separate workshop and site hours other than through two scenarios, does not calculate the pay the worker receives and saves nothing. The text of the agreement, the RESOR fund and your statements prevail.

The Art Construction ERP takes over the hourly cost, links it to the hours clocked per site and per worker, to daywork sheets and to invoicing, and produces documents with the firm’s letterhead and no watermark.

Frequently asked questions

Which trades fall under the agreement for the finishing trades of French-speaking Switzerland?

Several finishing trades in French-speaking Switzerland, including joinery, carpentry, plastering and painting and coverings. The exact scope, with its exclusions, is at the start of the agreement; check it for your firm.

What is the difference between RESOR and FAR?

They are two separate early-retirement schemes: the FAR for the main construction sector, RESOR for the finishing trades of French-speaking Switzerland. Their rates and conditions differ; use the one on your statement.

Does the simulator know that I fall under the CCT SOR?

No. It does not choose the agreement for you: you replace the CN values with those of your agreement, and each line keeps a record of its source and status.

How do I include unbilled workshop hours?

Add them to the bad-weather hours, the studio’s only line for non-productive hours. They reduce the productive hours and raise the cost of each billed hour accordingly.