Employer hourly cost in metal construction and locksmithing: workshop hours and fitting hours

A fitting hour at the client’s and a workshop hour have neither the same output nor the same cost: separate them before setting the daywork rate.

Open the free studio →

Free, no account: your plans, schedules and figures stay in your browser.

In German- and Italian-speaking Switzerland, locksmithing and metal construction fall under the trade’s national collective agreement concluded by AM Suisse with the unions (Landesgesamtarbeitsvertrag for the metal trades), declared generally binding. Some French-speaking cantons have their own agreement for the building metal trades, with its own wages, allowances and sometimes an early-retirement scheme: the applicable text depends on where the firm is based and must be checked before entering anything.

In the employer hourly cost simulator, workshop and fitting are compared in two scenarios. In the workshop, non-productive hours are few and there are neither meals nor travel; on fitting jobs, waiting, travel time and daily allowances raise the cost of each productive hour. For each, the studio calculates the pure hourly cost and the recommended daywork rate, then the gap.

Worked example: a locksmith in the workshop (A) and on fitting (B)

A metal construction locksmith aged 45 (five weeks of holiday). Example values, to be replaced by those of your agreement, your statements and your policies: hourly wage CHF 31.00, 41 hours a week, 9 public holidays, 13th salary 8.3 %, allowances 2.0 %, LPP 7 % after CHF 26’460 of coordination, LAA 50 ‰, sickness 1.0 %, early retirement 0 in this example, joint contribution 0.5 %, PPE and tools CHF 1’500, overheads 17 %, margin 8 %. Scenario A, workshop: 10 non-productive hours, no allowance. Scenario B, fitting: 30 non-productive hours, meals CHF 16 and travel CHF 15 per productive day.

Workshop and fitting compared in the simulator (example values)
LineWorkshop (A)Fitting (B)Gap B − A
Productive hours per year1’848.941’828.94−20.00
Allowances (meals and travel)0.006’914.246’914.24
Total annual cost87’130.5594’044.796’914.24
Pure hourly cost47.1251.424.30
Recommended daywork rate59.5564.955.40

The gross wage is the same in both scenarios: 31.00 × 1’932.74 hours paid = CHF 59’914.94, plus CHF 6’350.98 holiday pay and CHF 5’500.07 13th salary, or CHF 71’765.99; employer charges reach CHF 13’864.56, including CHF 3’588.30 of LAA premium. With equipment, the workshop cost is CHF 87’130.55 for 1’848.94 productive hours (1’858.94 − 10), or CHF 47.12 an hour.

On fitting, the productive hours fall to 1’828.94 (223.04 days) and the allowances add CHF 31 × 223.04 = CHF 6’914.24: CHF 94’044.79 in total, CHF 51.42 an hour. With 17 % overheads and 8 % margin, the recommended rates are CHF 59.55 in the workshop and CHF 64.95 on fitting (before rounding 64.97).

In this example, a fitting hour costs CHF 4.30 more than a workshop hour; a single daywork rate of CHF 59.55 would not cover the cost of fitting.

3 costly mistakes in locksmithing hourly cost

Applying the workshop rate to fitting hours

Travel, waiting for access, handling without a crane and meal allowances make the fitting hour more expensive. A single rate worked out on the workshop leaves a loss on every job at the client’s.

Using the wrong agreement

Depending on where the firm is based, either the national agreement for the metal trades or a French-speaking agreement for the building metal trades applies, with different wages, allowances and contributions. Check the scope before entering anything.

Counting travel as productive hours

Driving time between the workshop and the site is paid but rarely billed on daywork. Add it to the non-productive hours of the fitting scenario, otherwise the cost of the hour sold is too low.

Working out two daywork rates in 3 steps

  1. Scenario A: the workshop
    Enter the working time, the wage, your fund rates, the LAA premium in per mille and a few non-productive hours; set meals and travel to 0.
  2. Scenario B: fitting
    Copy A to B, increase the non-productive hours with travel and waiting, then enter the meal and travel allowances per productive day.
  3. Compare and document
    Read the gap in hourly cost and rate in the comparison, then export the detail as CSV or print the sheet for your pricing file.

Open the free studio →

What the free version does not do in metal construction

The prefilled values are those of the CN for main construction: the wages, allowances and contributions of your metal-trades agreement are entered by you. The studio does not calculate the hourly cost of workshop machines or vehicles, does not know your LAA premium or your fund rates and saves nothing. Your agreement and your statements prevail.

The Art Construction ERP links workshop and fitting costs to the hours clocked per site, to daywork sheets and to invoicing, with documents without a watermark.

Frequently asked questions

Which agreement applies to a locksmithing firm?

In German- and Italian-speaking Switzerland, the national collective agreement for the metal trades; some French-speaking cantons have their own agreement for the building metal trades. The applicable text depends on where the firm is based: check its scope.

Where do I enter the cost of vehicles and machines?

The studio has no dedicated line. Include these costs in your overheads, or add the share per worker to the annual PPE and tools amount, and note it.

Do I need two daywork rates, workshop and fitting?

It is a commercial choice, but the calculation shows the cost gap. If you keep a single rate, base it on your firm’s real share of fitting hours.

Does the simulator calculate the pay the locksmith receives?

No. It calculates the cost price for the employer and the daywork rate; deductions from the worker’s wage are not part of this studio.