In German-speaking Switzerland, painting and plastering fall under the collective labour agreement of the trade (GAV für das Maler- und Gipsergewerbe), extended by the Federal Council; in French-speaking Switzerland, these trades come under the collective agreement for the finishing trades (CCT SOR), with the RESOR early-retirement scheme. Both texts set the working time, minimum wages by category, holidays, the 13th salary and joint contributions; their values differ and must be taken from the text that applies to your firm.
The employer hourly cost simulator compares two scenarios side by side. For a painting contractor, it is the most direct way to see the gap between a skilled painter and a labourer: same working time, same insurance rates, different hourly wage. For each, the studio shows the annual cost, the productive hours, the pure hourly cost and the recommended daywork rate, then the gap B − A line by line.
Worked example: skilled painter (A) and painter’s labourer (B)
Two workers aged 32 (five weeks of holiday). Example values identical for both, to be replaced by those of your agreement and your statements: 41 hours a week, 9 paid public holidays, 30 non-productive hours a year, 13th salary 8.3 %, family allowances 2.0 %, LPP 7 % after CHF 26’460 of coordination, LAA 30 ‰, sickness 1.0 %, early retirement 0 in this example (enter it if your agreement provides one), joint contribution 0.5 %, travel CHF 10 per productive day, PPE CHF 500, overheads 16 %, margin 8 %. Only the hourly wage changes: CHF 30.00 (A) and CHF 25.00 (B).
| Line | Skilled painter (A) | Painter’s labourer (B) | Gap B − A |
|---|---|---|---|
| Base hourly wage | 30.00 | 25.00 | −5.00 |
| Annual gross wage | 69’450.96 | 57’875.80 | −11’575.16 |
| Total annual cost | 84’149.90 | 70’271.29 | −13’878.61 |
| Productive hours per year | 1’828.94 | 1’828.94 | 0 |
| Pure hourly cost | 46.01 | 38.42 | −7.59 |
| Recommended daywork rate | 57.65 | 48.15 | −9.50 |
The hours are the same: 41 h × (52.14 − 5) = 1’932.74 hours paid, less 9 days × 8.2 h = 1’858.94 hours worked, less 30 non-productive hours = 1’828.94 productive hours (223.04 days). For A, the base wage is 30.00 × 1’932.74 = CHF 57’982.20, holiday pay 6’146.11, the 13th salary 5’322.65: gross CHF 69’450.96; employer charges 11’968.54, travel 2’230.40 and PPE 500 give CHF 84’149.90.
For B, the gross wage drops to CHF 57’875.80 and charges to CHF 9’665.09, but travel and PPE stay the same: annual cost CHF 70’271.29. The pure hourly cost goes from 46.01 to CHF 38.42. With 16 % overheads and 8 % margin, the recommended rates are CHF 57.65 (A, before rounding 57.64) and CHF 48.15 (B, before rounding 48.13). The wage gap of CHF 5.00 becomes a rate gap of CHF 9.50, because charges, overheads and margin are calculated as percentages.
In this example, the skilled painter’s hour costs CHF 46.01 and the labourer’s CHF 38.42; a single daywork rate of CHF 53 would not even cover the overheads of the skilled painter’s hour (CHF 53.37 before margin).
3 costly mistakes in painting and plastering hourly cost
Billing an average rate without knowing who works
A single daywork rate for the whole team hides the gap between skilled painter and labourer. If the site uses mostly skilled workers, the average rate no longer covers their cost; separate the categories on daywork sheets when the contract allows it.
Using the wrong agreement
A painter in French-speaking Switzerland does not fall under the same text as a painter in German-speaking Switzerland: working time, minimum wages, early retirement and contributions differ. Enter the values of the agreement that really applies to your firm.
Forgetting unbilled preparation hours
Floor protection, sanding of repairs, cleaning, waiting for drying: these hours often do not appear on the daywork sheet. Group them with bad weather in the non-productive hours, otherwise the hourly cost is underestimated.
Comparing two workers in 3 steps
- Fill in scenario A
Enter the working time, the rates from your statements and the skilled painter’s hourly wage. The studio refuses to calculate as long as a required field is empty. - Copy A to B
The “Copy A to B” button takes over all parameters; change only the hourly wage and, if needed, the labourer’s age, which changes holidays and the LPP age band. - Read the comparison
The comparison table gives the annual cost, productive hours, pure hourly cost and daywork rate of A and B, with the gap. Print it or export it as CSV for your pricing file.
What the free version does not do in painting and plastering
The prefilled values are those of the CN for main construction: no minimum wage or rate specific to the painting agreement is built in, everything is entered by you. The studio does not calculate an output per square metre, does not know your LAA premium or your fund rates, does not calculate the pay the worker receives and saves nothing. Your agreement and your statements prevail.
The Art Construction ERP links the hourly cost of each category to clocked hours, daywork sheets and the firm’s invoicing, with documents without a watermark.
Frequently asked questions
Which agreement applies to a painter in French-speaking Switzerland?
In French-speaking Switzerland, painting and plastering come under the collective agreement for the finishing trades, with the RESOR early-retirement scheme. In German-speaking Switzerland, it is the collective agreement for painting and plastering. Check the scope of the text before entering the values.
Can I compare more than two workers?
The studio compares two scenarios at a time. For a third category, export the first result as CSV, then replace scenario B.
Why is the rate gap larger than the wage gap?
Social charges, overheads and margin are percentages: they amplify the wage difference. Only fixed amounts, such as allowances and equipment, stay the same.
Does the simulator give a price per square metre?
No. It gives a cost and a rate per hour. For a figure per square metre, divide the hourly cost yourself by the output you have measured on your sites.