Free 2D floor plan software · no account needed · data in Switzerland with an account

Free online 2D floor plan for renovation work: what the editor does, what it does not do, and 7 practical cases

A browser-based plan editor for drawing rooms, measuring areas and preparing renovation work: its real functions, its limits and seven practical cases.

Open the free floor plan editor →

Free. Without an account, your plans stay in your browser; with an Art Construction account, they are saved on a server in Switzerland. A preparatory 2D sketch does not replace a plan signed by a qualified professional.

You are preparing a renovation, a fit-out or a request for works, and you lack a readable plan with the right areas. Private owners try out a layout before buying a piece of furniture, small tradespeople sketch a plan before visiting the client, and property managers document an apartment before or after works. The question is the same: what can you draw and measure in a few clicks, and when do you need another tool?

The plan editor opens in the browser at /plans/editeur. The Wall tool (B key) draws walls one click per corner; a click on the first point closes the outline and creates the floor and ceiling of the room. Thickness (0.10 m to start with) and height (2.45 m to start with) can be adjusted. Doors and windows are placed on the walls, the Zones tool (Z) names the rooms, and the measure tool (N) gives distances, angles, areas and perimeters on a 0.50 m grid. A catalogue of objects, storeys, slabs and roofs complete the set, and the “Full floor plan” PDF can be printed. Without an account, plans stay in the browser; with an Art Construction account, they are saved on a server in Switzerland.

Five minutes for a two-room apartment: 2D plan, areas and perimeters

Example values, to be replaced by your own measurements: a two-room apartment in French-speaking Switzerland, in internal dimensions (wall face to wall face): living room 5.00 × 4.00 m, bedroom 3.50 × 3.00 m, hall 2.00 × 1.50 m, shower room 2.50 × 2.00 m.

Area and perimeter of the four rooms (internal dimensions, example values)
RoomInternal dimensions (m)Area (m²)Perimeter (m)
Living room5.00 × 4.0020.0018.00
Bedroom3.50 × 3.0010.5013.00
Hall2.00 × 1.503.007.00
Shower room2.50 × 2.005.009.00
Total of the four rooms–38.5047.00

Rules applied: floor area inside the walls, walls not counted; perimeter equal to the full outline of the room, without deducting doors (to be confirmed according to the use of the document). Area = length × width; perimeter = 2 × (length + width). Living room: 20.00 m² and 18.00 m; bedroom: 10.50 m² and 13.00 m; hall: 3.00 m² and 7.00 m; shower room: 5.00 m² and 9.00 m. Totals: 20.00 + 10.50 + 3.00 + 5.00 = 38.50 m² and 18.00 + 13.00 + 7.00 + 9.00 = 47.00 m. The dimensions are to the centimetre, so the results are exact. The total of the perimeters counts shared walls twice, so it is not a length of walls.

In the editor, you draw the four rooms, name them with the Zones tool, then read each area and each perimeter again with the measure tool (Area and Perimeter modes) by clicking the internal corners: the values should match the table. With the dimensions to hand, allow a few minutes (estimate). The seven practical cases in this series build on this example: surveying an existing apartment, comparing two options for taking down a partition wall, laying out a bathroom, calculating area, perimeter and skirting boards, preparing a plan for a condition report or a works request to the landlord, trying out furniture before moving in, and drawing a terrace and a fence.

The example two-room apartment totals 38.50 m² of internal floor area and 47.00 m of combined perimeters.

3 common mistakes with a free online 2D floor plan for renovation work

Mistaking the sketch for a signed plan

A preparatory 2D sketch helps you decide and talk to a professional. It does not replace a plan signed by an architect or a qualified professional (in particular where a municipal procedure requires one), nor a land surveyor’s survey, nor an engineer’s opinion.

Mixing internal and external dimensions

A floor area is measured inside the walls, a façade outside: the difference is the wall thickness. Choose one rule, write it down, and confirm it for the intended use. The editor gives the geometric area, not the classification of the SIA 416 standard (to be checked in the standard), which belongs to Plans Pro.

Relying on the browser alone to keep your plan

Without an account, the plan stays in the browser: changing computer or clearing the site’s data may make it disappear (to be checked). Keep a copy with “Save build”, or sign in: the plan is then saved on a server in Switzerland and listed in “Scenes”.

Using the free online 2D floor plan for renovation work in 3 steps

  1. Open the editor and draw the walls
    Open /plans/editeur, choose the Wall tool (B), click each corner and then the first point to close the room. Set the thickness and the height, then place doors and windows.
  2. Name the rooms and measure
    With the Zones tool (Z), click the corners and name the room. With the measure tool (N), choose Distance, Area or Perimeter. Ctrl + Z undoes the last action.
  3. Export and keep
    In Settings › Export, “Full floor plan” gives the PDF to print. To keep the plan: “Save build” or an Art Construction account.

Open the free floor plan editor →

What the free online 2D floor plan does not do

The editor has no standardised electrical or plumbing symbols, no title block, no A3 layout at a standard scale (SIA 400 standard, to be checked in the standard), no hatching, no demolition and construction layers, no working sections and elevations, and no DXF export. Measurements are read with the measure tool, not necessarily on the PDF. It does not calculate structural loads: a load-bearing wall cannot be assessed here.

To see the project in 3D: the step-by-step guide. To prepare working drawings, sections, elevations, an area table or the documents of a municipal procedure: Plans Pro. To measure a plan that is already a PDF, trade by trade: the take-off studio for PDF plans. For a crane, skips and access: the site installation studio. See also the “Plans 2D/3D” page (presentation of the editor), the page of plan guides and the guide to the SIA 400 standard: they explain the standards, whereas this page explains how to use the tool.

Frequently asked questions

Do I need an account to use the 2D floor plan editor?

No. Without an account, plans stay in your browser. With an Art Construction account, they are saved automatically on a server in Switzerland and listed in “Scenes”.

Can the plan I draw be used for a building application file?

No: it is a preparatory sketch. A municipal procedure file is the job of an architect or a qualified professional; ask the municipality.

Does the editor give areas according to SIA 416?

No. It gives the geometric area of a room or polygon and a perimeter. The classification of areas (SP, SN, SU and so on) belongs to Plans Pro, according to the standard, to be checked.

Which languages and browsers does it work with?

It is free, in French and 11 other interface languages; some secondary labels are still in English. The 3D view needs a recent browser (Chrome, Edge or Safari).