2D/3D plans and permits
From plan to permit: SIA 400 and 416 standards, areas and indices, public inquiry per canton, on-plan measurement and transition to pricing.
- 48guides
- 6sections
- 535pages in other sections
- 78hub tools
📘 SIA 400 Standard: Plan Representation Guide in Switzerland 8
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in Switzerland
Master standard SIA 400 for 2D/3D drawings in Switzerland. Detail levels, scales and MN95 dimensioning to guarantee execution compliance.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandGuide to Technical Abbreviations on Swiss Working Drawings (FB, RB, OK, UK, EP, EU)
Master technical abbreviations (FB, RB, OK, UK) on Swiss execution drawings per SIA 400. Avoid setting-out errors and costly rework on site.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandSwiss Colour Code on Renovation Plans (Grey Existing, Red New, Yellow Demolition - SIA 400)
Master the Swiss SIA 400 colour code for renovation drawings: grey for existing, red for new, yellow for demolition. Clear, compliant plans.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandRunning Dimensions and Elevations (±0.00 and m s.m. Pierre du Niton): SIA 400 Dimensioning Rules
Master running dimensions and elevation rules (Pierre du Niton, m s.m.) on Swiss architectural plans according to the SIA 400 standard.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandSIA 400 Standard Material Hatching: Reinforced Concrete, Masonry, Insulation, Timber and Natural Ground
Master standard material hatching to Swiss SIA 400. Prevent costly interpretation errors on your architectural and working drawings.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandStandardised A4 Folding and Mandatory Details for Swiss Plan Title Blocks
Master standard A4 folding and mandatory title block details under norm SIA 400. Avoid plan rejections by Swiss municipal authorities.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandRepresenting Doors, Windows, Sills, and Lintels on Swiss Plans (SIA 400 Conventions)
Master how to represent doors, windows, sills, and opening directions on Swiss architectural plans in compliance with the SIA 400 standard.
SIA 400 Standard: Complete Guide to Architectural and Execution Plan Representation in SwitzerlandScales 1:100 vs 1:50 Under Standard SIA 400: Expected Graphic Detail Level in Switzerland
Master scales 1:100 and 1:50 under standard SIA 400 in Switzerland. Prevent dimensioning and graphic detailing errors on your execution plans.
📘 SIA 416, IBUS and IUS Area Calculation in Switzerland 8
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in Switzerland
Master SIA 416 surface area calculations, building volumes and Swiss cantonal indices (IBUS, IUS) to optimise your construction projects.
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandIBUS / IUS Bonus for High Energy Performance (Minergie / CECB A) by Romand Canton
Optimise your plans with the Minergie or CECB A IBUS and IUS density bonus in Romandie. SIA 416 standard, calculations, and cantonal permit…
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandCalculating IBUS (Gross Utilisation Ratio - AIHC) Step by Step: Basements, Attics, and Balconies
Calculate IBUS under the AIHC for basements, attics, and balconies in Vaud, Fribourg, and Neuchâtel. Plan dimensioning rules and planning permit…
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandPlot Boundary Distances, Dormers and 3D Legal Envelopes in Swiss Municipal Regulations
Master boundary distances, dormers and 3D envelopes under Swiss municipal bylaws and art. 22 LAT to secure your building permit submission plans.
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandDeterminant Floor Area (SPd) vs Energy Reference Area (SRE SIA 380/1): Avoiding Confusion
Understand the differences between SPd (SIA 416) and SRE (SIA 380/1) in Switzerland: calculation rules, thermal zoning, and building permit…
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandNet Living Areas for Off-Plan Sales and Calculation of PPE Shares in Switzerland
Calculation of net living areas and PPE shares for off-plan sales in Switzerland according to the SIA 416 standard and the Civil Code (CC).
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandVisual Breakdown of SP, SU, SD, SI and SE Areas under Swiss Standard SIA 416
Understand the breakdown of SP, SU, SD, SI and SE areas under standard SIA 416. Swiss plan calculation rules for architects and engineers.
Calculating SIA 416 Surface Areas, Building Volumes and Cantonal Indices (IBUS, IUS, IOS) in SwitzerlandCalculating Building Volume: SIA 416 vs Former SIA 116 Standard: Impact on Taxes and Estimates
Differences between SIA 416 building volume and SIA 116 cube in Switzerland. Direct impact on communal taxes, cost estimates and planning submissions.
📘 Swiss Public Inquiry and Building Permit File 8
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)
Practical guide to preparing your Swiss building permit file: CAMAC, APA, FRIAC and eConstruction platforms, and full compliance with SIA standards.
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Preparing a Successful CAMAC Dossier in the Canton of Vaud (ATC / LATC): Required Drawings and Special Questionnaires
CAMAC Vaud technical guide: planning permission drawings, special questionnaires, and LAT / LATC coordination for architects and design offices.
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Objections During the 30-Day Public Inquiry: Settling Technical Claims via Modified Drawings
Address 30-day Swiss public inquiry objections and settle claims using coordinated modified drawings in line with the LAT.
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Setting Out Building Profile Poles and Mandatory Plotting of Existing vs Finished Ground on Planning Sections
Setting out building profile poles in Switzerland: drawing rules for existing vs finished ground and planning inquiry sections under art. 22 LAT.
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Submitting Building Permits on FRIAC (Fribourg) and eBau (Bern) Without Correction Requests
Swiss guide to FRIAC and eBau digital submissions: georeferencing, PDF/A profiles, and plan compliance under the LAT to avoid formal correction…
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Building Permits in Geneva (Accelerated APA vs Ordinary DD): Preparing Plans for OAC e-Démarches
Prepare your APA and DD permit plans on e-Démarches for the OAC in Geneva. CAD drawing rules, building profiles and coordination under art. 22 LAT.
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)SATAC (Neuchâtel) and JURAC (Jura) Procedures: Cantonal Requirements for Renovations and New Builds
SATAC (Neuchâtel) and JURAC (Jura) permit application requirements: architectural plans, LAT compliance, and smooth cantonal coordination without…
Preparing a Public Notice File and Building Permit in Switzerland (CAMAC, APA, FRIAC, eConstruction)Digital Submission on eConstruction in Valais (Commune vs CCC): Required PDF/A Formats and Signatures
Guide to submitting building permits on eConstruction in Valais: PDF/A requirements, qualified electronic signatures, and division between commune…
📘 Drawing a 2D 3D SUVA Site Installation Plan (PIC) 8
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)
Drafting method for a SUVA and OTConst compliant site layout plan. Crane footprints, OLED skips and Swiss site safety standards.
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Logistics Layout for Multi-Stream Skips (OLED), Silos and Unloading Zones on the Site Installation Plan
Plan OLED skips, silos and unloading zones on your Swiss site installation plan. 2D/3D methodology compliant with art. 17 OLED and art. 3 OTConst.
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Dimensioning Excavation Slopes, Shoring and Safety Distances to Overhead Power Lines (SUVA)
Swiss guide to dimensioning excavations, slopes, trench shoring, and clearance distances to overhead power lines on plans under OTConst and SUVA…
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Drafting the Dimensioned Public Space Occupation Plan (Pavements / Roadways) for Municipal Police
Dimensioned plan for public space occupation permits in Switzerland: roadways, pavements, municipal police, clearance profiles, and traffic rules.
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Drafting Escape Routes, Fire Access, and Temporary VSS Road Signage Plans
Draft escape routes, fire service access, and temporary VSS road signage on site under OTConst. Swiss directives and plans for construction sites.
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Drafting Facade Scaffolding (CFC 114), Brackets and Roof Catch Platforms in Plan and Elevation
Draft CFC 114 scaffolding, brackets and roof catch platforms to OTConst and SUVA standards. Compliant site installation drawings and elevations in…
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Plotting Tower Crane Jib Radius, Interference, and Oversailing Adjacent Plots in 2D/3D
Plot tower crane location, jib radius, interference, and oversailing in Switzerland under the OTConst and neighbourhood law.
Drafting a SUVA- and OTConst-Compliant 2D/3D Site Installation Plan (PIC)Mandatory Graphical Elements of a Site Installation Plan (PIC) Under OTConst
Drafting requirements for an OTConst-compliant PIC in Switzerland. Crane tracks, collective protection: graphical rules for architects and design…
📘 Technical Sections and Details SIA 180 / 181 MoPEC 8
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)
Swiss technical guide for drawing 1:20 wall sections and 1:5 details compliant with SIA 400, SIA 180, SIA 181, SIA 271, SIA 500, and MoPEC standards.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Multilayer Sections of Floating Screeds, Acoustic Edge Strips (SIA 181) and Underfloor Heating Pipes
Draw floating screed sections, SIA 181 acoustic edge strips, and underfloor heating pipes correctly to prevent sound bridges and costly defects.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Drawing 1:20 and 1:5 Working Detail Sections Without Linear Thermal Bridges (SFOE / SIA Catalogue)
Swiss method for drawing 1:20 and 1:5 detail sections without linear thermal bridges, compliant with SIA standards and SFOE catalogues.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Thermal Envelope Sections in Renovation: Reaching U <= 0.20 W/(m2K) under MoPEC and Building Programme Subsidies
1:20 building envelope sections for renovation. Reach U <= 0.20 W/(m2K) under MoPEC and secure Building Programme subsidies.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)1:5 Installation Details for Triple-Glazed Windows and Barrier-Free Thresholds <= 25 mm (Norm SIA 500)
1:5 execution details in Switzerland: triple-glazed window installation, joint sealing, and barrier-free thresholds up to 25 mm according to SIA 500.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Parapet Sections and Upstands for Green or Gravel Flat Roofs to SIA 271 (CFC 224)
Swiss technical guide for detailing parapet sections and upstands on green or gravel flat roofs according to standard SIA 271 and CFC 224.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Dimensioned Plans and Elevations for Swiss Kitchens (SMS / Euro Norms) and Bespoke Fit-Outs (CFC 258 / 273)
Dimensioning rules for Swiss SMS or Euro kitchen plans, elevations, and CFC 258 / 273 interior fit-outs. Avoid costly site coordination errors.
Technical Wall Sections (1:20 / 1:5), CFC Working Details, and Building Physics (SIA 180 / 181 / MoPEC)Electrical (CFC 23) and Sanitary (CFC 25) Working Drawings in Renovation: Symbols and Builders' Work Openings
Master symbols, dimensioning, and builders' work in CFC 23 & 25 renovation working drawings under Swiss standards and SIA 118.
📘 Swiss BIM SIA 2051, IFC and SIA 451 Measurements 8
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in Switzerland
3D modelling, IFC, and quantity takeoff for SIA 451 quotes in Switzerland. SIA 2051, eCCC-Bât structures, and CAN rules for engineering consultancies.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandTechnical Leaflet SIA 2051 Explained Without Jargon: Applying Pragmatic BIM in a Swiss Design Office or SME
Apply technical leaflet SIA 2051 cost-effectively in your Swiss SME. Pragmatic protocol, IFC management, and CO dispute prevention.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandDeducting Openings on Plans (Windows, Doors, Shafts): Meeting Official CAN Chapter Thresholds
CRB thresholds & CAN chapters for deducting openings on Swiss plans: quantity takeoff rules, impact on quotes & compliance under enterprise contracts.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandExporting a Clean IFC4 Model for MEP and Structural Engineers (Base Point & Classification)
Reliable IFC4 export for Swiss structural and MEP engineers: MN95 georeferenced base point, eCCC-Bât classifications and zero geometry loss.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandFrom 2D/3D Plans to Automated Bills of Quantities: Facade Surfaces, Walls, Slabs and Linear Elements
Automate surface and quantity takeoff from 2D/3D plans in Switzerland under SIA standards. Secure your itemised quotes and prevent disputes.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandImporting and Cleaning a Surveyor DWG / DXF File (Swiss MN95 Coordinates) Without Overloading Your Plan
Swiss method to import and clean a surveyor DWG or DXF in MN95 coordinates without overloading your CAD file or moving the project origin.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandDirectly Linking Your 2D/3D Plans to SIA 451 Costing and Graphically Justifying Your Addenda
Link architectural drawings, SIA 451 quotes and addenda tracking in Switzerland. Justify every change order graphically without disputes.
3D Modelling, Pragmatic BIM (SIA 2051 / IFC), and Quantity Takeoff for SIA 451 Quotes in SwitzerlandStructuring 3D Objects and Layers with eCCC-Bât (eBKP-H) and CFC Codes from the Sketch Phase
Structure your 3D models and layers from the sketch phase using eCCC-Bât and CFC. Swiss technical guide for architects and engineering firms.
Other guide sections
Organize your company
The six-pillar method for a Swiss construction SME: management, MSST standardisation, team, site, sales, ca...
48 guidesSite monitoring
Managing a construction site in Switzerland: construction management, minutes, force majeure, amendments, acceptance, defects and guarantees...
80 guidesBids and contracts
Responding to a tender and pricing accurately: AIMP and public procurement, Simap, quantities and CAN/CRB, SIA 451, clauses to sp...
94 guidesEmployment and recruitment
Working and recruiting in the Swiss construction industry: collective labour agreement, salary and social charges, permits and cross-border workers, notice periods and protection,...
32 guidesTools, PPE and compliance
Choosing and using your equipment without liability: SUVA limit values, vibrations, dust extraction, anchors...
21 guidesCFC trade training
Training and upskilling your teams, trade by trade: 21 Swiss construction CFC pathways, from structural work to finish...
