Free 2D floor plan software · no account needed · data in Switzerland with an account

Terrace and garden plan in 2D: drawing the slab and the fence before the works

You draw a terrace, its fence and the garden furniture in a few minutes, then read the areas, lengths and distances before ordering or digging.

Open the free floor plan editor →

Free. Without an account, your plans stay in your browser; with an Art Construction account, they are saved on a server in Switzerland. A preparatory 2D sketch does not replace a plan signed by a qualified professional.

Before laying a slab, ordering fence panels or buying a garden set, you want to know the area of the terrace, the length of fence needed and the distance to the plot boundary. A scale sketch avoids ordering by guesswork and gives a paver, a landscape gardener or the municipality measurements they can read.

In Art Construction’s free plan editor, the Slab tool draws a terrace: you click the corners then confirm with Enter. The Build panel contains a fence tool, and the Items tab an Outdoor category. The measure tool (N key) gives the area, the perimeter and the distances. The basic commands are on the page “All the guides on plans and their standards”; here, a single use: the terrace and the garden.

Worked example of a 2D terrace and garden plan: a 5.00 × 3.00 m slab

Detached house in French-speaking Switzerland, south-facing façade, example garden of 9.00 m along the façade by 6.00 m deep (54.00 m²). The 5.00 × 3.00 m slab is laid against the façade, 1.00 m from the west boundary. The fence follows the three free sides, with a 1.00 m gate, and is assumed to be on the boundary (assumption to be confirmed on site). Example values, multiples of 0.50 m like the editor’s grid.

Measurements of the terrace and garden plan (example values, in m and m²)
ItemCalculationResultMeasurement mode
Terrace slab5.00 × 3.0015.00 m²Area
Perimeter of the slab2 × (5.00 + 3.00)16.00 mPerimeter
Free edge of the slab (excluding façade)16.00 − 5.0011.00 mDistance, side by side
Fence on three sides6.00 + 9.00 + 6.0021.00 mDistance, side by side
Fence to install (1.00 m gate deducted)21.00 − 1.0020.00 mDistance, side by side
Outdoor furniture (table, 4 chairs, 2 sun loungers, barbecue)1.62 + 1.00 + 2.80 + 0.355.77 m²Area
Free area of the slab15.00 − 5.779.23 m²Area

Measurement rules applied, to be confirmed with the paver, the fencer or the gardener: the slab on its outer outline, without joints or edging; the fence on its centreline; the distances from the edge of the slab to the centreline of the fence. Slab: 5.00 × 3.00 = 15.00 m². Perimeter: 2 × (5.00 + 3.00) = 16.00 m, of which 5.00 m against the façade, i.e. 16.00 − 5.00 = 11.00 m of free edge. Fence: 6.00 + 9.00 + 6.00 = 21.00 m, minus the 1.00 m gate, i.e. 20.00 m to install. Distances from the slab to the boundary: 1.00 m to the west, 9.00 − (1.00 + 5.00) = 3.00 m to the east, 6.00 − 3.00 = 3.00 m at the back. The slab covers 15.00 ÷ 54.00 = 27.8% of the example garden.

The furniture is counted by floor footprint: table 1.80 × 0.90 = 1.62 m², four chairs of 0.50 × 0.50 = 1.00 m² in total, two sun loungers of 2.00 × 0.70 = 2.80 m² in total, barbecue of 0.70 × 0.50 = 0.35 m², i.e. 5.77 m² (38.5% of the slab) and 15.00 − 5.77 = 9.23 m² free. Placed at the outer edge of the slab, the barbecue is 3.00 − 0.50 = 2.50 m from the façade. All the distances remain measurements on the plan, to be checked again on site.

A slab of 15.00 m², 20.00 m of fence to install, 9.23 m² free on the slab after 5.77 m² of furniture, and distances of 1.00 m, 3.00 m and 3.00 m to the boundaries of the example garden.

3 common mistakes on a 2D terrace and garden plan

Taking a distance on the plan for a permitted distance

The measurement on the plan gives a distance, not its status. Minimum distances to the boundary, the height of a fence or a low wall and the need for an authorisation depend on the municipality and the canton: to be checked with the municipality before ordering.

Confusing the slab area with material quantities

The editor gives the geometric area of the slab. Cuts, edging, joints and material losses are not counted in it: give the dimensions to the paver or the fencer and let them work out their quantities.

Forgetting what sticks out: pulled-out chairs, parasol, French window

The footprints in the table count neither the pulled-out chairs, nor the parasol base, nor the swing of a French window opening onto the terrace. Keep free the quarter disc swept by the door and measure the space left between the table and the edge of the slab.

How to make a 2D terrace and garden plan in 3 steps

  1. Draw the façade and the terrace slab
    Open the editor, draw the façade with the Wall tool (B key), then take the Slab tool: click the four corners of the terrace and confirm with Enter. Check the slab in Area mode (15.00 m² in the worked example).
  2. Draw the fence and place the outdoor objects
    In the Build panel, use the fence tool for the three sides of the garden. In the Items tab, open the Outdoor category and take the objects closest to your furniture; R and T rotate them. If an object is missing, represent its footprint with a named zone.
  3. Measure, note, export
    With the measure tool (N key), read the slab area, its perimeter, the fence side by side and the distances to the façade and the boundaries. Note the results separately: nothing says they will appear on the PDF. Export “Full floor plan” (Settings › Export) to print. For a dimension that is not a multiple of 0.50 m, check the rounding produced by the grid.

Open the free floor plan editor →

What the free editor does not do for a 2D terrace and garden plan

Nothing in the editor automatically recognises a scanned plan or a surveyor’s plan: the plot boundary is redrawn by hand from your measurements. A top view shows neither the slope of the ground nor surface-water drainage, and it does not produce a dimensioned working section. This preparatory 2D sketch helps you decide; it does not replace a plan signed by a qualified professional, in particular where a municipal building application requires one, nor a land surveyor’s survey, nor an engineer’s opinion.

Terraces, low walls, fences, swimming pools and pergolas may be subject to authorisation or to minimum distances depending on the municipality and the canton: to be checked with the municipality. The Federal Spatial Planning Act sets the principle of an authorisation for creating or altering a building or installation (art. 22, to be checked on fedlex.admin.ch); cantonal and municipal law specify the rest. In co-ownership or rented property, the consent of the co-owners’ association or the landlord may also be required, depending on the case. See the page “Boundary distances, dormers and municipal regulations” for the distances and the page “Building application file in Switzerland” for the procedure; Plans Pro prepares a complete file; the PDF take-off studio takes an existing plan as its basis.

Frequently asked questions

Do I need an authorisation for a terrace or a garden fence?

It depends on the municipality and the canton, and on the height, the location and the type of structure. Ask the municipality before the works: the plan helps you raise the question with measurements, but its figures have no legal value.

How far from the plot boundary can I put a fence or a terrace?

There is no single value: minimum distances come from cantonal law and the municipal regulations, and they vary with the structure. Measure the distance on the plan, then have the rule confirmed by the municipality (to be checked).

How do I measure the length of a fence on the plan?

Use the Distance mode of the measure tool side by side, add up the lengths and deduct gates and wicket gates, then compare the total with your survey on site.

Can I place a garden set and a barbecue on the plan?

Yes, if the Outdoor category offers objects close to your furniture. Otherwise, represent the real footprint with a named zone with the dimensions of the item, and count pulled-out chairs.