To order skirting boards, estimate paint or compare two rooms, you need four numbers: the floor area, the perimeter, the length of skirting boards and the wall area. In an L-shaped room with doors and a window, counting mistakes creep in quickly, especially at the side shared by two rectangles and at the openings.
The free plan editor has a measure tool (bottom bar, N key) with Distance, Area and Perimeter modes. It gives the geometric area of an outline and its perimeter; skirting boards and walls are then calculated by hand, as below. This area is not the classification of the SIA 416 standard (net area, usable area, etc.), which is handled by Plans Pro and by the guides cited at the bottom of the page. Here you draw first; to measure an existing PDF plan, see the take-off pages for PDF plans. A preparatory sketch replaces neither a land surveyor’s survey nor a plan signed by a qualified professional.
Calculating the area of an L-shaped room, its perimeter and its skirting boards
L-shaped living space: a rectangle of 4.20 × 3.50 m extended by an annexe of 2.10 × 1.80 m, aligned with one edge. The overall footprint is 4.20 × 5.30 m, with a missing corner of 2.10 × 1.80 m. Internal dimensions, two doors of 0.90 × 2.05 m, one window of 1.20 × 1.30 m, height 2.45 m (the editor’s starting value). Example values, rounded to the square centimetre or the centimetre.
| Quantity | Calculation | Result |
|---|---|---|
| Main rectangle | 4.20 × 3.50 | 14.70 m² |
| Annexe | 2.10 × 1.80 | 3.78 m² |
| Floor area of the L | 14.70 + 3.78 | 18.48 m² |
| Perimeter of the L | 4.20 + 3.50 + 2.10 + 1.80 + 2.10 + 5.30 | 19.00 m |
| Length of skirting boards | 19.00 − 2 × 0.90 | 17.20 m |
| Wall area | 19.00 × 2.45 − 3.69 − 1.56 | 41.30 m² |
Area: 14.70 + 3.78 = 18.48 m². Check: the overall footprint of 4.20 × 5.30 m is 22.26 m², minus the missing corner of 3.78 m², i.e. 18.48 m². Perimeter: 4.20 + 3.50 + 2.10 + 1.80 + 2.10 + 5.30 = 19.00 m, equal to that of the overall footprint, 2 × (4.20 + 5.30). Adding the perimeters of the two rectangles (15.40 + 7.80 = 23.20 m) counts the shared side of 2.10 m twice: 4.20 m too much.
Skirting boards: 19.00 − 2 × 0.90 = 17.20 m; the window does not reach the floor and is not deducted. Walls: 19.00 × 2.45 = 46.55 m² gross, minus two doors (2 × 0.90 × 2.05 = 3.69 m²) and the window (1.20 × 1.30 = 1.56 m²), i.e. 41.30 m². These rules (internal dimensions, openings deducted in full, skirting boards interrupted by the doors only) are to be confirmed according to the trade or the document requested; allowances for cutting waste are agreed with the supplier.
For this L-shaped room: 18.48 m² of floor, 19.00 m of perimeter, 17.20 m of skirting boards and 41.30 m² of walls, before waste and according to the take-off rules applied.
3 common mistakes when calculating a room’s area and perimeter
Adding the perimeters of the two rectangles
The sum gives 23.20 m instead of 19.00 m: the shared side of 2.10 m is counted twice. Measure the perimeter on the real outline of the L.
Placing the points beside the inner face of the walls
The points you click define the area displayed. On walls of 0.10 m, an outline placed on the centreline adds 0.05 m per side: 19.44 m² instead of 18.48 m², about 5% too much. With grid snapping at 0.50 m, active by default, a dimension of 4.20 m is not a multiple of 0.50 m: compare the displayed length of each side with your survey (snapping setting to be checked in the editor).
Deducting openings wrongly
A window does not interrupt the skirting board, a door does: deducting 1.20 m for the window as well would give 16.00 m instead of 17.20 m. Forgetting the openings in the walls leaves 46.55 m² instead of 41.30 m², about 13% too much.
How to measure area and perimeter on a 2D plan, in 3 steps
- Draw the room and check the sides
Draw the walls with the Wall tool (B key) to your internal dimensions, place doors and windows, then open the measure tool (N key) in Distance mode to compare each side with your survey. - Read the area and the perimeter
In Area mode, click the corners of the outline in order and finish it as the editor indicates on screen; do the same in Perimeter mode. For an L, an outline of six corners is enough; two rectangles add up for the area, not for the perimeter. - Calculate skirting boards and walls, then note the rules
In your own table: skirting boards = perimeter − width of the doors; walls = perimeter × height − openings. Note the height (2.45 m is the starting value, to be replaced by the measured height), the deduction rule and the date. These measurements do not necessarily appear on the “Full floor plan” PDF.
What the free editor does not do for area and perimeter
The editor gives a geometric area and a perimeter, nothing more: no SIA 416 classification (net area, usable area, etc.; to be checked in the standard), no automatic deduction of openings, no take-off table by item. These figures are preparation quantities, not a final take-off: a preparatory 2D sketch does not replace a land surveyor’s survey, nor a plan signed by a qualified professional (in particular where a municipal building application requires one), nor an engineer’s opinion.
For the SIA 416 classification, see the guide to calculating areas, the one that decodes the abbreviations and the area and volume calculator (in French), or Plans Pro, with its table and its Excel or CSV export. To measure an existing PDF plan, trade by trade (tiling, floor coverings, plastering, partitions, painting), see the take-off pages for PDF plans.
Frequently asked questions
How do I calculate the area of an L-shaped room on a 2D plan?
With Area mode on the six corners of the outline, or by adding two rectangles: 14.70 + 3.78 = 18.48 m², which 4.20 × 5.30 − 2.10 × 1.80 confirms.
Is a room’s perimeter equal to the length of skirting boards?
No: you remove the width of the doors and, depending on the case, other interruptions (built-in cupboard, French window). Here 19.00 m of perimeter gives 17.20 m of skirting boards, to be confirmed with the trade.
Is the area displayed the SIA 416 area of the room?
No, it is a geometric area. The SIA 416 classification is to be checked in the standard and is handled with Plans Pro or the guides indicated.
What height should I use for the wall area?
The real ceiling height, measured on site; 2.45 m is only the editor’s starting value, and a custom height is possible. With sloping ceilings or under-roof slopes, this simple calculation is not enough.