Free 2D floor plan software · no account needed · data in Switzerland with an account

2D furniture layout plan: trying out your living room before moving in

Before moving or buying a sofa, you place the furniture on a scale plan, measure what remains free and spot passages that are too narrow.

Open the free floor plan editor →

Free. Without an account, your plans stay in your browser; with an Art Construction account, they are saved on a server in Switzerland. A preparatory 2D sketch does not replace a plan signed by a qualified professional.

A sofa too long for the wall, a table that blocks the way, a door that no longer opens: these faults are often discovered on delivery day. A 2D furniture plan drawn to scale lets you spot them beforehand, by trying out several layouts of the living room or bedroom without moving a single piece of furniture.

In Art Construction’s free plan editor, you draw the walls, then place the door and the window. The Items tab offers, among others, the Furniture and Appliance categories, with a search by name (sofa, table, armchairs, double bed, desk). The R and T keys rotate the object before placing it, and the measure tool (N key) checks dimensions and distances. The catalogue gives standard objects: their dimensions are to be compared with those of the actual furniture. The basic commands are on the page “The 2D plan guides: drawing, tools and standards”; here, a single use: furniture and passages.

Worked example of a 2D furniture layout plan: a 5.20 × 3.80 m living room

Living room of an apartment in French-speaking Switzerland, 5.20 × 3.80 m in internal dimensions, i.e. 19.76 m². The entrance door (0.90 m) is in the south wall, on the west side, and opens inward; the window is in the east wall. Example values, to be replaced by the dimensions of your furniture.

Floor footprint of the living room furniture (example values, rounded to the hundredth of a m²)
FurnitureNumberDimensions (m)Footprint (m²)
3-seater sofa12.10 × 0.901.89
Armchairs20.80 × 0.801.28
Coffee table11.10 × 0.600.66
Dining table11.60 × 0.901.44
Chairs (pulled out from the table)40.45 × 0.450.81
Total furniture930.8% of the living room6.08

Measurement rules applied, to be adapted to your needs: internal dimensions from wall to wall, footprint of a piece of furniture = rectangle on the floor, chairs counted pulled out by 0.45 m. Area: 5.20 × 3.80 = 19.76 m². Furniture: 1.89 + 1.28 + 0.66 + 1.44 + 0.81 = 6.08 m², i.e. 6.08 ÷ 19.76 = 30.8% of the room; free remaining: 19.76 − 6.08 = 13.68 m² (69.2%). The quarter disc swept by the door (radius 0.90 m) is 3.14 × 0.90² ÷ 4 = 0.64 m², leaving 13.04 m² usable. Along the length: sofa 0.90 + gap 0.50 + coffee table 0.60 + passage + dining table 1.60 + 0.70 up to the east wall = 5.20 m, hence a passage of 5.20 − 0.90 − 0.50 − 0.60 − 1.60 − 0.70 = 0.90 m. The armchairs, 0.80 m wide, stick out 0.10 m further than the coffee table: at their level, the passage drops to 0.80 m, at the lower limit of the customary reference of 0.80 to 0.90 m (to be checked). Across the depth, the table and its pulled-out chairs measure 0.45 + 0.90 + 0.45 = 1.80 m; centred, it leaves (3.80 − 1.80) ÷ 2 = 1.00 m on each side.

Moving the table 0.10 m towards the east wall (0.60 m instead of 0.70 m) brings the passage to 1.00 m, and to 0.90 m at the armchairs. Each trial is kept in a separate file (“Save build”, for example living-room-A and living-room-B) and each dimension is checked in Distance mode. Before buying, compare the catalogue’s standard object with the data sheet of the actual furniture.

The furniture occupies 6.08 m² out of 19.76 m² (30.8%), and the narrowest passage measures 0.80 m before the table is moved, 0.90 m after.

3 common mistakes in a 2D furniture layout plan

Taking the catalogue object for the actual furniture

The catalogue offers standard objects, not your model, and 10 cm of difference is enough to turn a passage of 0.90 m into 0.80 m. Measure the object, compare it with the manufacturer’s sheet, then choose a similar object or draw the exact footprint with a named zone.

Forgetting what moves: doors, pulled-out chairs, drawers

A piece of furniture that fits on the plan may block a door, a drawer or a pulled-out chair. Check the opening direction of the doors (R reverses it) and keep free the quarter disc they sweep. The opening symbols of a standardised plan are explained on the page “Door and window symbols and opening direction”.

Placing furniture in front of a radiator or a window

A bulky piece of furniture in front of a radiator hinders the spread of heat, and a window must stay accessible. If the radiator is not in the catalogue, mark it with a named zone “Radiator” and keep a clearance, to be confirmed with the appliance’s data sheet.

2D furniture layout plan: how to do it in 3 steps

  1. Draw the room, the door and the window
    Open the editor, draw the walls with the Wall tool (B key), close the outline, place the door and the window (R reverses the opening direction), then name the room with the Zones tool (Z key). Check the area in Area mode: it should match your internal dimensions (19.76 m² in the worked example).
  2. Place the furniture from the catalogue
    In the Items tab, open Furniture or Appliance, search by name, rotate with R or T, then place and measure the object. Compare its dimensions with those of the actual furniture; Ctrl + Z undoes a trial.
  3. Measure the passages and compare layouts
    In Distance mode, measure the passages between pieces of furniture, in front of doors and in front of windows. Keep at least two layouts, one file each, then export the best one as a PDF (Settings › Export › Full floor plan). Note the dimensions separately: nothing says they will appear on the PDF.

Open the free floor plan editor →

What the free editor does not do for a 2D furniture layout plan

The catalogue contains standard objects, not manufacturers’ models: a specific piece (corner sofa, made-to-measure bookcase) is represented by a similar object or by a named zone with the right dimensions. Grid snapping at 0.50 m, active by default, may round positions: check with the measure tool. This preparatory 2D sketch helps you decide; it does not replace a plan signed by a qualified professional, nor a land surveyor’s survey, nor an engineer’s opinion. For a wheelchair user, passages are wider (SIA 500 standard on obstacle-free construction, to be checked in the standard).

For a kitchen or a made-to-measure fitting, see the page “Dimensioned kitchen and interior fit-out plans”: it deals with working dimensions, whereas here you only try out furniture. Plans Pro takes over for dimensioned plans ready to print, sections and elevations; the PDF take-off studio measures a plan that already exists; the step-by-step guide shows the room in volume.

Frequently asked questions

What passage width should I leave between pieces of furniture?

There is no single rule for an ordinary dwelling. As a general rule, 0.80 to 0.90 m is used for a passage you walk through, and more in front of a door or a cupboard: these are customary reference values, to be checked according to the use.

Do the catalogue’s furniture items have the dimensions of my sofa?

Not necessarily: they are standard objects. Measure them with the measure tool and compare them with the furniture’s data sheet; if they differ, choose a similar object or draw the real footprint with a named zone.

Can I compare several layouts of the same living room?

Yes: save one file per option with “Save build”, then open them one after the other with “Load build”, under explicit names such as living-room-A and living-room-B.

Does the method also work for a bedroom?

Yes: you draw the room, place a double bed or single beds and a desk from the catalogue, then measure the spaces around the bed and in front of wardrobe doors with the same tool.