Taking down a partition wall: comparing two 2D floor plans and measuring the areas before and after

Before demolishing, one plan per state shows what the opening changes: the area gained, the passages, the doors and the windows.

Open the free floor plan editor →

Free. Without an account, your plans stay in your browser; with an Art Construction account, they are saved on a server in Switzerland. A preparatory 2D sketch does not replace a plan signed by a qualified professional.

Opening a kitchen onto the living room usually starts with a simple question: how many square metres do we gain, and where will we walk afterwards? One plan per state answers better than a calculation in your head: one shows the existing layout, the other the option. One precaution first: a plan does not tell you whether a partition wall can be removed. Depending on the case, you may also need the landlord’s written consent (art. 260a para. 1 CO, to be checked on fedlex.admin.ch), that of the co-owners’ association or a municipal authorisation: to be checked with the property manager, the administrator or the municipality.

In the free plan editor, you draw the walls with the Wall tool (B key), set the partition’s thickness in the wall panel (0.10 m to start with), place doors and windows, name the rooms with the Zones tool (Z key) and read areas, perimeters and distances with the measure tool (N key). “Save build” keeps one file per option. This page deals with drawing and comparing areas, not with the soundness of the partition.

Worked example: taking down a partition wall between a kitchen and a living room

Older apartment in French-speaking Switzerland (generic location): a kitchen of 3.00 × 3.60 m and a living room of 4.80 × 3.60 m, separated by a partition 0.10 m thick, with a 0.80 m door. Example values, measured between the inner faces of the finished walls.

Areas and perimeters before and after removing the partition (example values, rounded to the hundredth)
State and roomInternal dimensions (m)Area (m²)Perimeter (m)
Before: kitchen3.00 × 3.6010.8013.20
Before: living room4.80 × 3.6017.2816.80
Before: total of the two roomssum28.0830.00
Partition (floor footprint)0.10 × 3.600.36n/a
After: single room7.90 × 3.6028.4423.00
Change, after minus beforedifference+0.36−7.00

Rules applied, to be confirmed according to the use (lease, take-off for a trade): floor area between the inner faces of the walls, without deducting the door. Before: 3.00 × 3.60 = 10.80 m² (kitchen) and 4.80 × 3.60 = 17.28 m² (living room), i.e. 10.80 + 17.28 = 28.08 m²; the partition occupies 0.10 × 3.60 = 0.36 m². After: 3.00 + 0.10 + 4.80 = 7.90 m long, hence 7.90 × 3.60 = 28.44 m². The gain, 28.44 − 28.08 = 0.36 m² (about 1.3%), is exactly the footprint of the partition. Perimeters: 13.20 + 16.80 = 30.00 m before, 2 × (7.90 + 3.60) = 23.00 m after; the 7.00 m less are the two faces of the partition (2 × 3.60 = 7.20 m) minus 0.20 m, because the two long sides each become 0.10 m longer.

What you do with it: option A (full opening) gives the 28.44 m² above; option B keeps 1.80 m of partition and opens a passage of 1.80 m, for a gain of 0.10 × 1.80 = 0.18 m². On each plan, measure the passages with the Distance tool, note where the 0.80 m door disappears, look at the windows in relation to the planned furniture and test the opening direction of the neighbouring doors (R key). Measurement points snap to the 0.50 m grid, and 4.80 m is not a multiple of it: compare the value read with the calculation.

Taking down the partition gives a single room of 28.44 m² instead of 28.08 m² in two rooms: the 0.36 m² gain is the footprint of the partition, and the value of the opening is judged mainly on the passages and the use.

3 common mistakes before taking down a partition wall

Forgetting the partition’s thickness in the single room

Calculating the single room as (3.00 + 4.80) × 3.60 = 28.08 m² suggests that the opening changes nothing. Yet it also contains the footprint of the partition: 28.44 m². Draw the option with the right thickness and read the area on the plan.

Judging the partition from the plan

A 0.10 m partition drawn like a wall does not tell you whether it is load-bearing. You need the original plans, an exploratory opening and an engineer’s opinion. See the page on opening a 3 m load-bearing wall with a steel beam: it deals with the sizing, this one only with the drawing.

Forgetting what the partition contains

Cables, sockets, water or heating pipes may run through it, and in an older building some plasters or boards may contain asbestos (Suva recommends an analysis for a building constructed before about 1990: to be checked). The editor shows none of this: see the guide to working drawings for electrical and plumbing installations, and have it checked on site before demolishing.

Taking down a partition on a 2D plan: how to do it in 3 steps

  1. Draw and save the existing layout
    Draw the walls, the partition (0.10 m), the door and the windows, name the zones “Kitchen, existing” and “Living room, existing”, read the areas with the measure tool, then use “Save build” before changing anything. With an account, automatic saving follows your changes: this file therefore keeps the existing state.
  2. Create the option in a second file
    Delete the partition (or part of it for option B), rename the zone “Kitchen-living room, option A”, measure the area (28.44 m²) and the perimeter (23.00 m), check doors, windows and opening directions, then save to a second file with an explicit name.
  3. Compare and present the differences
    Enter areas and perimeters in a before-and-after table. With no transformation colour code, the state is read from the file and zone names, and the “Full floor plan” PDF export gives one plan per option. For the grey, red, yellow convention, see the guide to the colour code of an alteration plan.

Open the free floor plan editor →

What the free editor does not do when removing a partition wall

The editor has no grey, red, yellow colour code, no title block, no hatching and no standard scale; it does not judge whether a partition is load-bearing and does not show pipes. A preparatory 2D sketch helps you decide, but does not replace a plan signed by an architect or a qualified professional (in particular where a municipal building application requires one), nor a land surveyor’s survey, nor an engineer’s opinion.

For the structure, see the page on opening a 3 m load-bearing wall with an HEB steel beam. To quantify demolition and strip-out on an existing PDF plan, see the page on the demolition and strip-out take-off (CFC 112): here you draw, there you measure a plan that already exists. For working drawings and a file to submit, Plans Pro is the next step.

Frequently asked questions

How can I tell whether a partition wall is load-bearing?

The editor does not say. You need the original plans, an exploratory opening and an engineer’s opinion; thickness or material alone are not enough.

Do I need the landlord’s consent to take down a partition wall?

Depending on the case, yes. For a tenant, art. 260a para. 1 CO provides for the landlord’s written consent (to be checked on fedlex.admin.ch). For co-ownership or a municipal authorisation, check with the administrator or the municipality.

How do I tell the existing layout from the option without a colour code?

One file per state, explicit names for files and zones (“existing”, “option A”), then one PDF export per state.

Is the area gained equal to the area of the partition?

Here yes: the partition runs across the whole depth, so 0.10 × 3.60 = 0.36 m². If part of it remains, the gain is that of the part removed, for example 0.18 m² for 1.80 m.