Before choosing a bath, a basin or a WC, you want to know whether everything fits and whether there is room to turn round, open the door and sit down. On a plan, a mistake is corrected in a few seconds; on site, it is discovered once the plumbing is installed. Comparing two layouts drawn to scale avoids this.
In the free plan editor, the Items tab offers the “Bathroom” category (including bath, basin and WC) and a search field. You rotate the object with R or T before placing it, then measure with the measure tool (N key, Distance mode). For a shower, a washing machine or a vanity unit, it all depends on the objects in the catalogue; otherwise, represent the footprint with a stand-in object or a named zone. The kitchen is not covered here: see the guide to kitchen and interior fit-out plans.
Worked example: 2D bathroom plan for a bathroom of 2.40 × 1.80 m
Bathroom of an apartment in French-speaking Switzerland (generic location): 2.40 m by 1.80 m between the inner faces of the walls, i.e. 4.32 m². The dimensions of the fittings are example values close to common models, to be replaced by the data sheet of the model chosen; the editor’s catalogue gives standard objects, which should be measured.
| Item | Dimensions (m) | Footprint (m²) | Share of the bathroom |
|---|---|---|---|
| Bathroom (internal) | 2.40 × 1.80 | 4.32 | 100% |
| Bath | 1.70 × 0.70 | 1.19 | 28% |
| Basin | 0.60 × 0.50 | 0.30 | 7% |
| WC | 0.40 × 0.70 | 0.28 | 6% |
| Total of the three fittings | sum | 1.77 | 41% |
| Remaining floor area | 4.32 − 1.77 | 2.55 | 59% |
Rules applied: floor area between the inner faces of the walls, without deducting the door; footprint of a fitting = width × depth, to be confirmed against the data sheet. Bathroom: 2.40 × 1.80 = 4.32 m² (perimeter 2 × (2.40 + 1.80) = 8.40 m). Bath 1.70 × 0.70 = 1.19 m², basin 0.60 × 0.50 = 0.30 m², WC 0.40 × 0.70 = 0.28 m²: total 1.19 + 0.30 + 0.28 = 1.77 m², i.e. 41%, leaving 4.32 − 1.77 = 2.55 m² of floor. This floor is not usable space (strips behind and between the fittings, door swing): the distances matter more than the area.
Layout A: bath on the short side (1.70 m within the 1.80 m width), basin on one long side and WC on the opposite long side, facing each other: free distance 1.80 − 0.50 − 0.70 = 0.60 m. Layout B: basin and WC side by side on the same long side, i.e. 1.80 − 0.70 = 1.10 m in front of the WC and 1.80 − 0.50 = 1.30 m in front of the basin; along this wall, 2.40 − 0.70 − 0.60 − 0.40 = 0.70 m remain, i.e. 0.30 m of margin once two gaps of 0.20 m between fittings are allowed for. Guides cite about 0.60 m free in front of a WC and a basin and 0.20 m between fittings (0.40 to 0.60 m in front of a WC depending on the sources): customary reference values, to be confirmed with the manufacturer, the standard and the use. Layout A only just meets this reference, layout B exceeds it. A 0.80 m door opening inward sweeps a quarter circle of the same radius: test its direction (R key) or allow for a sliding door or one opening outward.
The three fittings occupy 1.77 m² out of 4.32 m², i.e. 41%; with 2.55 m² of floor remaining, the side-by-side layout leaves 1.10 m in front of the WC, against 0.60 m face to face.
3 common mistakes on a 2D bathroom plan
Trusting the catalogue object without measuring it
The catalogue gives standard objects, whose dimensions are not those of the model you buy. Measure each object with the measure tool, compare it with the data sheet and, if the difference matters, represent the real footprint with a named zone.
Forgetting the door swing and projections
Measuring the clearance up to the wall without counting the door leaf, the bath panel, the radiator or the waste trap is too optimistic. Test the opening direction (R key) or allow for a sliding door or one opening outward, as the case may be.
Placing fittings without thinking about the connections
The plan shows where to put a WC, not where water, drainage and power arrive, and the editor has no symbols for them. See the guide to working drawings for electrical and plumbing installations, and the tool on bathroom electrical zones (NIBT, OIBT), before fixing a layout.
2D bathroom plan: how to do it in 3 steps
- Draw the bathroom to the internal dimensions
With the Wall tool (B), draw 2.40 × 1.80 m and close the outline, place the 0.80 m door and name the zone “Bathroom” with the Zones tool (Z). Check with the measure tool in Area mode (4.32 m²): depending on how you place the points, the wall thickness (0.10 m to start with) may reduce the internal dimensions. - Place the fittings and rotate them
In the Items tab, open the “Bathroom” category or search for a fitting by name (bath, basin, WC). Rotate with R or T before placing, then measure the object (Distance mode) to compare it with the data sheet. - Measure the clearances and compare two layouts
In Distance mode, measure the space in front of the WC and the basin, then save layout A with “Save build”, move the fittings and save layout B. Snapping to the 0.50 m grid, active by default, may round positions: check the dimension displayed and, if needed, calculate the distance from the dimensions.
What the free editor does not do for a bathroom plan
The editor has no symbol for water supply, drainage, sockets or light points, no electrical category, and does not show the electrical zones of a bathroom. A bathroom accessible to people with reduced mobility follows other dimensions, set by the SIA 500 standard on obstacle-free construction (to be checked in the standard): this example does not take them into account. A preparatory 2D sketch helps you decide, but does not replace the plumber, nor a plan signed by an architect or a qualified professional (in particular where a municipal building application requires one), nor a land surveyor’s survey, nor an engineer’s opinion.
To quantify fittings, supplies and drainage on an existing PDF plan, see the page on the take-off of heating, ventilation, plumbing and electrical work (CFC 23, 24 and 25). For complete working drawings, Plans Pro is the next step; for a kitchen, see the guide to kitchen and interior fit-out plans.
Frequently asked questions
How much free space should I allow in front of a WC and a basin?
Guides cite about 0.60 m, with differences between sources (0.40 to 0.60 m in front of a WC): customary reference values, to be confirmed with the manufacturer, the standard and the use, not legal requirements.
Does the editor offer a shower or a washing machine?
That depends on the objects in the catalogue: only the bath, the basin and the WC are confirmed here. Otherwise, represent the footprint with a stand-in object or a named zone with the dimensions from the data sheet.
Is this plan suitable for an accessible bathroom?
No. A bathroom accessible to people with reduced mobility follows other dimensions, defined by the SIA 500 standard (to be checked in the standard); this example is aimed at an ordinary dwelling.
Can I show water supplies and sockets on the plan?
Not with symbols: the editor offers none. You can name a zone; for a working drawing, see the guide to working drawings for electrical and plumbing installations.