For a move-in or move-out condition report, a request for works or a neighbour’s building site, a plan is better than “the back bedroom”. If each room has a number and a name, it becomes a common reference for photos, remarks and exchanges with the property manager. Depending on the case, tenancy law regulates the changes a tenant makes, and some require the landlord’s written consent (Code of Obligations, in particular art. 260a: to be checked on fedlex.admin.ch and with the property manager or landlord).
The free plan editor draws walls, places doors and windows, names each room with the Zones tool (Z key), reads its area with the measure tool and exports a “Full floor plan” PDF. The plan is kept in a file or, with an Art Construction account, on a server in Switzerland. It is not a condition report form: the protocol, photos and signatures remain those of the property manager or the tenants’ association, and the plan is added as an appendix. For drawing conventions (scale, title block), see the guide to the SIA 400 standard; this page deals only with using the tool, and the guides page gathers the others.
2D plan of a three-room apartment for the condition report: numbered rooms and areas
Three-room apartment with hall, living room, two bedrooms, kitchen and bathroom, internal dimensions (example values). The number is written in the zone name (“2 Living room”). Floor areas inside the walls, rounded to the square centimetre; each door is counted once, in the room it serves, the apartment’s front door in the hall.
| No. | Room | Area (m²) | Doors | Windows |
|---|---|---|---|---|
| 1 | Hall | 5.12 | 1 | 0 |
| 2 | Living room | 19.89 | 1 | 2 |
| 3 | Bedroom 1 | 14.00 | 1 | 1 |
| 4 | Bedroom 2 | 10.50 | 1 | 1 |
| 5 | Kitchen | 8.06 | 1 | 1 |
| 6 | Bathroom | 4.40 | 1 | 0 |
| Total | 61.97 | 6 | 5 |
Areas: 1.60 × 3.20 = 5.12; 5.10 × 3.90 = 19.89; 4.00 × 3.50 = 14.00; 3.50 × 3.00 = 10.50; 3.10 × 2.60 = 8.06; 2.20 × 2.00 = 4.40. Total: 61.97 m², 6 doors and 5 windows, i.e. 11 openings to find on the plan. The Area mode of the measure tool lets you check each room against this table.
Suppose the lease or the property manager states 64 m² (example value): the difference is 64.00 − 61.97 = 2.03 m², i.e. 3.2% of the lease area. It may come from the definition of the area (internal walls included or not, balcony, share of common areas), from rounding or from different dimensions. The plan does not say who is right: you note the difference, with the dimensions and the date of the measurements, and discuss it with the property manager or the landlord, with a professional if needed.
The plan gives 61.97 m² for 6 numbered rooms, 6 doors and 5 windows, with a 2.03 m² difference from the example lease, to be explained without settling it.
3 common mistakes with a 2D plan for a condition report or a works request
Drawing a conclusion from an area difference with the lease
A difference of 2.03 m² between 61.97 m² measured and 64 m² stated is nothing definitive: definitions, rounding and starting dimensions differ. Note it as a finding and leave the discussion to the property manager; the plan is not an expert report.
Changing names and numbers from one document to another
The plan, the table, the protocol and the photos must refer to the same room in the same way. Use the designations of the lease or the protocol and keep the same numbering everywhere, otherwise a remark about “room 3” becomes ambiguous.
Keeping the plan only in the browser
Without an account, plans stay in the device’s browser: clearing data or changing computer may make them disappear. Save a file, export the PDF or sign in to find the plan again in “Scenes”.
How to make a 2D plan for a condition report, in 3 steps
- Draw and name the rooms
Draw the walls (B key) with your internal dimensions, close each outline, place doors and windows, then name each room with the Zones tool (Z key), number included: “2 Living room”. Check the sides with the measure tool (N key). - Draw up the table and compare with the lease
Read the area of each room in Area mode, enter it in a table (number, name, area, doors, windows) and check the total. If the lease states an area, compare and note the difference without drawing a conclusion. - Export, save and attach
In Settings › Export, choose “Full floor plan” and check on the preview that the room names appear. Keep a file (“Save build”) whose name shows the date and the state, existing or project. Attach the PDF and your table to the property manager’s protocol or to the works request.
What the free editor does not do for a condition report plan
The editor has no condition report form, no annotated photos, no signature and no room table: the table is made by hand and the protocol remains that of the property manager or the tenants’ association. It has no title block and no standard scale, and the measurements do not necessarily appear on the PDF. A preparatory 2D sketch does not replace a plan signed by an architect or a qualified professional (in particular where a municipal building application requires one), nor a land surveyor’s survey, nor an engineer’s opinion.
For a working drawing with an A3 title block, sections, elevations and an SIA 416 area table, you need to move to Plans Pro. Tenancy law questions (landlord’s consent, restoration, lease area) are dealt with by the property manager, the landlord, a tenants’ association or a lawyer, not by the editor.
Frequently asked questions
Is a 2D plan enough for a condition report?
No, it complements the protocol: the numbered plan locates the findings and the photos, but the protocol, with its headings and signatures, remains the document of the property manager or the tenants’ association.
Should I attach a plan to a works request to the landlord?
It depends on the landlord and the works; depending on the case, written consent is required before certain changes (to be checked with the property manager). A plan of the existing layout, and of the project if needed, helps describe the request: ask what the property manager expects.
Can I find the plan of a condition report later?
Without an account, the plan stays in the browser: keep a file and the PDF. With an Art Construction account, it is saved on a server in Switzerland and listed in “Scenes”; “Load build” brings a plan drawn without being signed in into your account.
Why does the area on the plan differ from the lease?
Several reasons are possible: definition of the area (internal walls, balcony, common shares), rounding, measured dimensions. The editor does not settle it: note the difference and discuss it with the property manager.