An older apartment often no longer has a reliable plan. A laser measure or a tape measure, a sheet of paper and a pencil are enough to survey it; the risk lies elsewhere: measurements taken in no particular order, dimensions taken at skirting-board level or against furniture, rooms that are not square. A precise measuring order and a few checks avoid most of these mistakes.
The free editor is used to go from the sheet of paper to the plan. The Wall tool (B key) draws walls on a 0.50 m grid whose step can be made finer; the settings panel of a wall gives its length, its thickness (0.10 m to start with) and its height (2.45 m to start with). The measure tool (N) checks distances and areas, the Zones tool names the rooms, and “Full floor plan” exports a PDF. For the rules on dimensioning and levels, see the guide to the SIA 400 standard and the one on cumulative dimensioning: they explain the standard, whereas this page explains the survey with the tool.
Worked example: laser survey of an apartment, dimensioned 2D plan of an older three-room apartment
Example values: an older dwelling in French-speaking Switzerland, described as a three-room apartment (kitchen counted), surveyed with a laser in internal dimensions, from wall face to wall face, above the skirting boards. Five rooms in two rows: hall, living room, bedroom, kitchen, bathroom. Thicknesses measured at the doors: 0.10 m for the partitions, 0.15 m for the wall between the two rows. Ceiling height: 2.55 m, measured at three points.
| Room | Laser dimensions (m) | Area (m²) | Calculated diagonal (m) |
|---|---|---|---|
| Hall | 2.20 × 2.40 | 5.28 | 3.26 |
| Living room | 4.60 × 3.80 | 17.48 | 5.97 |
| Bedroom | 3.70 × 3.80 | 14.06 | 5.30 |
| Kitchen | 3.60 × 2.40 | 8.64 | 4.33 |
| Bathroom | 2.40 × 2.40 | 5.76 | 3.39 |
| Sum of the five rooms | – | 51.22 | – |
| Internal outline of the apartment | 8.40 × 6.35 | 53.34 | 10.53 |
Rules applied: internal dimensions, area = length × width without the walls, rounded to the square centimetre (the products are exact here), to be confirmed according to the use of the document. Sum of the areas: 5.28 + 17.48 + 14.06 + 8.64 + 5.76 = 51.22 m². Check of the living room by Pythagoras: diagonal = √(4.60² + 3.80²) = √35.60 = 5.97 m. The two diagonals measured with the laser give 5.97 m and 5.99 m: a 2 cm difference, i.e. 0.3%. Threshold accepted here: 3 cm (a choice made for the example, to be set according to the use); beyond that, measure again.
Internal outline, measured between the inner faces of the external walls: 8.40 × 6.35 = 53.34 m². The difference from the five areas is 53.34 − 51.22 = 2.12 m²; it must equal the area of the internal walls: 0.15 × 8.40 = 1.26 m²; 0.10 × 3.80 = 0.38 m²; 2 × 0.10 × 2.40 = 0.48 m²; total 2.12 m². The count is exact. In the editor, you then set 0.15 m for the central wall and 2.55 m for the height, then read each dimension again with the measure tool.
The five rooms total 51.22 m² for an outline of 53.34 m²: the 2.12 m² difference corresponds to the internal walls, and the survey is consistent.
3 common mistakes when surveying an apartment for a 2D plan
Measuring at skirting-board level or against furniture
A thick skirting board, a radiator or a wardrobe shortens the dimension by several centimetres. Measure at chest height, from bare wall to bare wall, and note the projections (ducts, pillars) separately with their position.
Not checking with the diagonals
Four dimensions around the room do not tell you whether it is square: a parallelogram has the same sides as a rectangle, but not the same diagonals. Measure both diagonals; if they differ too much, measure again, then draw the real angle.
Forgetting the wall thickness and the height
The editor starts at 0.10 m thickness and 2.45 m height. In an older building the thickness varies: measure it at the reveal of each door and set it wall by wall, otherwise the outline drifts away from reality. Set the measured height as well.
How to survey an apartment for a 2D plan, in 3 steps
- Measure on site in order
Make a freehand sketch of each room. Take the outline of the room clockwise from the door, the two diagonals, the ceiling height at three points, the wall thickness at each door, then the width of the openings and their distance from the corner. - Draw and adjust in the editor
Open /plans/editeur and pick the Wall tool (B). While you draw, a reminder of the keys is displayed: Shift changes the snapping mode, Ctrl changes the grid step (0.50, 0.25, 0.10 or 0.05 m). Close the outline, then select each wall to enter length, thickness and height. Place a test wall and measure it to see on which side of the line the thickness is added (to be checked). Add doors, windows and room names (Zones tool, Z). - Check, then export
With the measure tool (N), read the sides and diagonals again (Distance mode) and the areas (Area mode), and compare them with your sketch. Then export “Full floor plan” (Settings › Export); “Save build” keeps a copy.
What the free editor does not do for an apartment survey
The sketch is not a land surveyor’s survey: its accuracy depends on the instrument, the method and the grid step. A wall that is not square is drawn with the real angle, but needs more points. The editor does not correct a wrong measurement, does not generate chained dimensioning for printing (measurements are read with the measure tool, not necessarily on the PDF) and does not import a scanned plan. This preparatory 2D sketch does not replace a plan signed by an architect or a qualified professional, nor a land surveyor’s survey, nor an engineer’s opinion.
To quantify demolition and strip-out from a PDF plan, see the page on the demolition and strip-out take-off (CFC 112): there you measure an existing plan, here you draw it. For working drawings, sections or dimensioned elevations, Plans Pro is better suited. For the dimensioning standard, see the SIA 400 guides (to be checked in the standard).
Frequently asked questions
In what order should I measure an apartment with a laser measure?
Room by room: the outline of the room clockwise, the two diagonals, the ceiling height at three points, the wall thickness at each door, then the openings. Write each dimension on a sketch.
Should I measure inside or outside the walls?
Inside, from wall face to wall face: that is the rule of this example, to be confirmed according to the use of the document. Wall thickness is measured separately, at the door reveals, and set in the wall panel.
What if the two diagonals of a room differ?
Measure again first. If the difference remains, the room is not square: draw the real angle by adding the points needed and set an acceptable tolerance according to the use of the plan (3 cm in the example).
How do I get the surveyed plan as a PDF?
In Settings › Export, “Full floor plan” produces a print-ready PDF. Measurements are read with the measure tool: check the PDF you get and carry over the useful dimensions by hand.