Free software · 100% in your browser · no data sent

Internally Insulated Façade: Dew Point and Twelve-Month Condensation

Internal wall insulation tool: calculate dew point and twelve-month condensation in old buildings. Free online software running directly in your browser.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

Internal Insulation: Why Condensation is the Real Risk

Insulating an old stone, rubble masonry, or brick wall from the inside alters its entire hygrothermal balance. In winter, the existing masonry no longer receives heat from the interior, becoming significantly colder than before the work. Warm, moist indoor air tends to migrate outward through diffusion. If it crosses the lining without sufficient resistance, water vapor encounters a cold zone in contact with the masonry or inside the insulation, turning from gas to liquid.

On the construction site, such trapped moisture rapidly degrades framing, soaks fibrous insulation, and promotes the rotting of sensitive elements—typically wooden beam heads sealed in masonry or plant-based linings. Moreover, water-logged insulation loses its thermal performance. To assess this phenomenon, the Insulation Studio opens with a generic internal insulation assembly. From the room outward, it comprises a plasterboard, a variable-humidity vapor retarder, a layer of insulation, massive masonry, and facade render. You can adjust each layer, change thicknesses, and freely modify the diffusion properties of the materials.

Reading the Glaser Diagram for the Chosen Month

The Glaser diagram visualizes the behavior of the wall for each month of the year. For the selected month, the tool plots two major elements across the thickness of the assembly:

  • The temperature and corresponding saturation vapor pressure;
  • The actual vapor pressure crossing the wall from the room outward.

As long as the vapor pressure curve remains below the saturation pressure curve, vapor moves unimpeded. As soon as these two curves touch, the dew point is reached, and interstitial condensation forms precisely at that point in the cross-section.

Indoor ambient and outdoor conditions are fully customizable. The baseline climate provided by the tool is indicative and does not correspond to a specific weather station. To obtain readings tailored to your construction site, replace the monthly average temperatures and relative humidities with data from the project's location, allowing you to test a harsh January or a foggy late autumn depending on facade exposure.

Accumulated Water and Summer Drying Over Twelve Months

The presence of a dew point in the dead of winter is not always critical if the accumulated water evaporates entirely during the warm months. The Insulation Studio analyzes the month-by-month balance over the entire year, quantifying liquid water accumulated during the cold season and calculating drying during the summer period.

If the moisture accumulated in winter does not dry out completely during summer, the tool displays a clear warning: water persists and builds up from year to year in the masonry or insulation, potentially leading to building defects. Furthermore, a specific alert is triggered if condensation affects putrescible layers, such as wood fibers or plant framing elements, beyond the set threshold. When multiple condensation zones form simultaneously within the lining, only the largest zone is tracked in the annual balance.

For pure thermal performance, the U-value is calculated using surface thermal resistances for horizontal heat flow. The resulting value is compared to user-defined limit values or presets from the MoPEC 2025 and Building Programme (data sourced November 17, 2026). The tool does not issue validity judgments; it simply indicates whether your calculated value is lower than, equal to, or higher than the selected threshold.

Variable-Humidity Vapor Retarder: The Manufacturer's Datasheet Curve

In internal linings on massive walls, the membrane plays a decisive role. A variable-humidity vapor retarder adjusts its permeability according to ambient air relative humidity. In winter, indoor air is dry relative to saturation, so the membrane closes its pores and blocks diffusion toward the cold wall. In summer, relative humidity rises at the core of the wall, and the membrane opens to allow the wall to dry toward the room.

The Insulation Studio handles this technical feature. If the manufacturer's datasheet provides the vapor diffusion resistance curve according to relative humidity, you can integrate it into the calculation. The tool varies the equivalent value over the twelve months. If you do not have these variable values, you enter a fixed resistance value. On a renovation construction site, the airtightness of this membrane must be flawless: a localized leak around a technical conduit or at the floor junction allows warm air to pass via convection, creating far greater condensation than simple vapor diffusion.

Surface Mold: The Surface Temperature Factor

Condensation does not occur solely at the core of the assembly; it can also appear on the interior lining on the room side. This happens when the plasterboard surface remains too cold relative to ambient air. The relative humidity of the air in immediate contact with the wall then exceeds the mold growth threshold, often long before water becomes visible as droplets.

The studio calculates the interior surface temperature factor, denoted fRsi. This dimensionless value reflects the quality of surface insulation. The result is compared to a useful minimum displayed by the studio. If the factor is too low, the tool signals a risk of mold on the interior facing or surface condensation during certain winter months. To remedy this, it is often necessary to revise insulation thickness or correct thermal bridges at floor and partition junctions.

Lost Living Space, Lining Acoustics, and Takeoff

Installing internal insulation involves practical trade-offs regarding available space and acoustic comfort. The studio calculates the total thickness added to the room. By entering the perimeter of the treated walls, you directly obtain the lost floor living space.

Acoustically, the assembly operates on the mass-spring-mass principle. The tool evaluates the resonance frequency of the system formed by the existing masonry, mineral wool, and facing boards, indicating whether the lining provides an acoustic gain or penalty. An alert appears when the resonance frequency exceeds 160 Hz, a range where common noises risk being amplified rather than attenuated.

To prepare site operations, a takeoff module lists the supplies required for the lining:

  • Metal profiles: floor tracks and vertical studs;
  • Installation accessories: acoustic hangers and perimeter resilient strips;
  • Insulation materials: acoustic wool panels or rolls;
  • Sealing: vapor-retarder membrane with takeoff including overlaps, dedicated adhesive tape, and perimeter connection mastic;
  • Cladding: plasterboard or gypsum-fiber boards in cross-installation, and screws.

Consumption rates remain adjustable. The free version displays no prices or article codes.

What the Free Version Does Not Do for an Interior Lining

The Insulation Studio runs entirely within your web browser. It is usable without registration or account creation. Nothing is sent to a server, and nothing is stored in local memory. As soon as you close or reload the page, all entered data is erased. Printing the technical datasheet generates a document bearing an Art Construction watermark, and CSV export contains mention of the free version.

The module applies precise calculation assumptions that should be noted:

  • Hygrometry is calculated solely based on vapor diffusion, using a steady-state one-dimensional model. The tool tracks a single main condensation plane and does not incorporate liquid water transfer via capillarity or wind-driven rain absorption on the exterior facade.
  • Two- or three-dimensional thermal bridges are not modeled (slab edges, window reveals, beam penetrations).
  • Default material data provided are indicative orders of magnitude; users must enter actual values from manufacturer datasheets. Acoustic parameters remain calibration values.

The tool does not replace SIA 180, which is the professional reference for thermal protection and building moisture in Switzerland. Art Construction is independent of SIA and CRB. The calculations assist technical thinking but do not replace a building physics engineer's study.

Switch to Tenders or the ERP to keep the insulation lining by construction site

To keep a technical sketch from one construction site to another, you can turn to Tenders and the ERP. The free version calculates the quantities of the take-off but contains no unit prices; you can enter your own.

With the paid version, you have features that the free version does not contain:

  • Saving of the insulation lining by construction site, with versions, in the ERP;
  • Unit prices entered in the take-off, saved with the project;
  • Insulation report with your company letterhead, without watermark, to print in PDF.

To find this insulation lining from one construction site to another, discover Tenders and the ERP.

Frequently asked questions

How does the tool calculate condensation from one month to the next?

The studio calculates month by month the amount of vapor diffusing through walls. When condensation occurs, it quantifies liquid water accumulated during the month based on vapor pressure differences. During warmer months, it evaluates the evaporation potential to determine if the wall manages to dry completely before the following winter.

Can the tool be used for a wall subject to rising damp?

No. The model relies on the Glaser method, which only considers water vapor diffusion in a gaseous state. Liquid water capillary rise from the ground or infiltration due to wind-driven rain on an unsealed facade are not modeled in this calculation.

Why does my lining present a mold risk without visible condensation?

Mold growth on the interior facing does not require water droplets to form. It is enough for the relative humidity of the air to exceed a critical threshold in contact with a cold wall. The surface temperature factor fRsi signals this risk as soon as the interior surface is insufficiently thermally insulated.

How are variations in the variable-humidity vapor retarder taken into account?

If you have the manufacturer's datasheet indicating the curve of equivalent air layer thickness value according to relative humidity, the studio varies the membrane resistance each month. Lacking a complete curve, calculation is performed with a manually entered fixed resistance value.

Where do the climate values used in the simulation come from?

The default climate provided upon opening the page is a generic dataset supplied as an example. It does not originate from a specific official weather station. For a real construction site, you must manually enter local monthly averages of temperature and relative humidity.

Do my calculations remain saved if I close my browser?

No. The free version runs exclusively in your browser. No data is sent to a server or stored in the device's local memory. As soon as the tab is closed or refreshed, all your input and results are immediately erased.

Why does the free version display no prices in the takeoff?

The free version calculates the physical dimensions of the framing, insulation and boards, without providing prices. You can enter your own unit prices in the take-off: the total is calculated in your browser. The paid version of Art Construction Tenders and ERP then saves the project, including entered prices, by construction site.