Free software · 100% in your browser · no data sent

External wall insulation: U-value, fixings and reaction to fire

Calculate the corrected U-value of your rendered or ventilated external wall insulation with fixings and full quantity takeoff. Free online tool.

RAM session: closing or reloading the page erases everything. Export before leaving.

Loading...

About this tool

External wall insulation: what the studio calculates on this preset

The Insulation Studio opens directly onto the preset dedicated to external wall insulation. The default build-up shows a standard cross-section, ordered from the inside to the outside of the building: internal render, a load-bearing wall, insulation, and then the rendered finish. You can freely modify each layer, its thickness, and its thermal conductivity.

The engine applies the appropriate surface thermal resistances for a horizontal heat flow. It first calculates the uncorrected U-value, then the corrected U-value by factoring in the impact of mechanical fixings or joints if you provide this information. A layer with studs or framing can also be calculated using the combined method.

As a thermal complement, the tool evaluates the summer phase shift and the heat wave decrement factor. It also performs a twelve-month hygrometric analysis according to the Glaser method, based on the external climate entered in the interface. Finally, the studio checks your result against a selected target value, such as the MoPEC 2025 benchmarks or the Buildings Programme benchmarks recorded at the source on 17 November 2026, or against a custom value entered manually. The software simply indicates whether your U-value is less than or equal to, or greater than this target.

Fixings and the corrected U-value: what needs to be entered

Penetrating a rendered external wall insulation layer with fixings creates point thermal bridges. Every fixing penetrating the insulation increases the wall's U-value. The studio handles this phenomenon with a corrected U-value, but this adjustment requires explicit input on your part.

To enable the correction calculation, enter the point thermal transmittance of the fixing specified in the manufacturer's technical data sheet, or enter the cross-sectional area and thermal conductivity of the metal shaft, combined with the number of fixings per square metre of façade. If this information is not supplied, the studio displays a warning and the displayed U-value remains the uncorrected value. You can also enter a correction for joints.

A classic error on the construction site is to neglect the effect of fixings when ordering panels. On very thick or high-performance insulation, the cumulative effect of a high density of fixings can raise the final U-value above the threshold required by the project specifications. Entering the actual fixing data straight away avoids having to adjust the insulation thickness once the scaffolding is erected.

Rendered façade or ventilated façade: where to terminate the cross-section

Thermal performance differs depending on whether you are installing rendered external wall insulation or a ventilated rainscreen cladding. The studio offers a specific option to switch to a ventilated façade.

In a ventilated façade, the thermal cross-section stops dead at the air cavity. The studio applies this physical rule: as soon as the option is checked, the layers located beyond the air cavity (such as the external sub-frame, façade panels, or timber cladding) are ignored in the thermal calculation. The external surface resistance is automatically adjusted to reflect exposure to the ventilated airflow behind the cladding.

Conversely, for rendered external wall insulation, the entire system remains bonded to the substrate: the reinforcing mesh and the finishing render are part of the continuous external composition, without an intervening air gap. Ensure you position your wind barrier correctly and check the continuity of the insulation against the structural work, eliminating any parasitic air circulation between the insulation board and the backing wall.

Reaction to fire of insulation according to building height

The choice of external insulation is closely linked to the building's height and its intended project use. In the studio, each material layer has an editable fire reaction class.

The tool includes a reference guidance table classifying requirements according to building height: low, medium, or high. For medium-height buildings, this table indicates that non-combustible fire barriers must be planned when using combustible insulation. This table is an editable setting provided as a working aid; it does not originate from a direct review with cantonal fire insurers. Final choices must be verified against the current fire protection directives with the relevant cantonal insurance body.

The costly mistake on site: choosing combustible insulation without cross-referencing the building height with cantonal insurance regulations. The right practice to avoid this error: adjust the fire class of each layer in the tool, read the table for the project's height category, and then confirm the requirement with the cantonal insurance body before ordering.

From calculation to quantity takeoff: panels, mortars, mesh, and profiles

Thermal sizing leads directly into the quantity takeoff of the materials needed on the construction site. By entering the net façade area, the base perimeter, opening edges, and window sills, the studio generates a complete bill of quantities.

The takeoff calculates requirements for the following items:

  • Main insulation boards, accounting for cutting wastage percentages.
  • Adhesive mortar for fixing to the structural work.
  • Base coat mortar.
  • Reinforcing mesh, including overlaps.
  • Mechanical fixings according to the entered density per square metre.
  • Base tracks for the plinth.
  • Corner profiles and drip profiles for sills.
  • Finishing render.

All unit consumption rates, overlap ratios, and wastage factors can be edited to match technical specifications from your façade system supplier. No prices are displayed in this free module.

Catalogue product or manufacturer values: choosing the insulation

To support your calculation, the studio incorporates a catalogue of products available on the Swiss market. This catalogue is a static file updated weekly using manufacturers' declarations of performance; only genuinely manufactured thicknesses are offered. As long as this file is not published, generic materials remain available.

You have access to practical filters by brand, trade name, or non-combustibility criteria. If you cannot find the exact reference, you can use generic materials from the library or directly enter the thermal conductivity shown on your supplier's technical data sheet. The generic values provided are initial orders of magnitude; an execution calculation requires the use of actual data from the selected manufacturer.

The studio also allows you to display an ecological assessment derived from KBOB data for materials matched with this database. You can thus visualise the embodied energy, greenhouse gas emissions, and environmental impact points associated with your façade build-up.

What the free version does not do for an insulated façade

The free version of the Insulation Studio runs 100% in your web browser, with no account creation or registration required. Nothing is sent to a server, and nothing is retained in your browser memory: closing or refreshing your tab resets your entire input. Data sheets printed from this version carry an Art Construction watermark, and exported CSV files state that the free tool was used.

The tool models walls using a steady-state one-dimensional calculation. It performs no two- or three-dimensional calculations and does not model linear junction thermal bridges, such as plinth details, sill connections, or window reveal returns. For construction site design, the professional standards of reference remain SIA 243 for external thermal insulation composite systems (ETICS) and SIA 180 for building hygrometry and thermal performance. Art Construction is independent of SIA, CRB, and CFST.

This free version contains no unit prices: only the prices you enter yourself in the takeoff count. To keep your facade studies from one construction site to another, check out our module dedicated to tenders and the ERP.

Switch to Tenders or the ERP to keep the facade by construction site

Once your facade build-up is finalized, switching to the Pro version via Tenders and ERP lets you keep the study and takeoff obtained without starting from scratch.

The Pro version offers tools designed for facade contractors and site managers:

  • Saving the facade by construction site, in the ERP.
  • Successive versions of the save.
  • Unit prices entered in the takeoff, saved with the project.
  • Generation of technical reports in PDF format, without watermarks, customized with your company colors.

To find your facade studies from one construction site to another, discover Tenders and the ERP.

Frequently asked questions

How do façade fixings affect the U-value?

Metal fixings penetrating the insulation layer act as point thermal bridges. In the studio, you enter the point transmittance of the fixing or its cross-section and conductivity, as well as the number of fixings per square metre. The studio then adds a thermal correction to the initial U-value.

Is my façade calculation data saved in the browser?

No. In the free version, the calculation runs entirely in your browser without transmitting anything to a server or writing to local storage. If you close the window or reload the page, your entered layers and dimensions are instantly cleared.

What rule applies to the air cavity of a ventilated façade?

When you enable the ventilated façade option, the calculation stops at the inner surface of the air cavity. The studio applies the external surface thermal resistance to this face and ignores all layers beyond it, such as battens or external cladding.

Does the studio certify the fire requirements of my external insulation?

No. The reaction-to-fire table according to building height is an editable benchmark provided for informational purposes only. It is not directly verified with cantonal insurers. You must confirm your structural details directly with the relevant cantonal insurance body.

Does the studio calculate thermal bridges around windows?

No. The engine performs a steady-state one-dimensional thermal calculation. It does not handle linear or three-dimensional thermal bridges at sills, lintels, or opening corners. These checks require a dedicated thermal bridge study.

Why are no prices in francs shown in the free takeoff?

The free version provides only the quantities of insulation, mortars, reinforcements, and profiles, without any prices. You can enter your own unit prices in the takeoff: the total is calculated in your browser and nothing is sent. The paid version of Tenders and ERP then saves the project, including entered prices, by construction site.

Does the displayed result constitute an official regulatory decision?

No. The studio simply compares your calculated value with the entered limit value and indicates whether it is less than, equal to, or greater than that target. This tool assists with technical preparation but does not replace the work of an engineer or the approval of the competent authority.