On an earthworks construction site in Western Switzerland, spoil management begins with methodical separation from the very first bucket scoops. According to the Waste Ordinance (OLED), earthy and excavation materials are sorted on the construction site and recovered as much as possible if they are not polluted. This source sorting prevents downgrading large volumes that would end up in more restrictive disposal channels.
Topsoil stripping is the first operational step. This surface layer rich in organic matter must be carefully removed, then stored separately in a dedicated area to preserve its agronomic qualities for future reuse. Next come the unpolluted mineral excavation materials from the subsoil, such as sandy gravel, compacted moraines or molasse. Finally, deconstruction materials, such as bituminous asphalt, concrete or old masonry, must imperatively follow separate skips.
Mixing these different fractions on the earthworks platform complicates the output channels. A load of clean gravel contaminated by asphalt debris or topsoil immediately loses its value for on-site backfilling or immediate recovery. The site manager therefore ensures temporary storage areas are organized for each category of material before engaging mechanical shovels in full mass.
Workbook categories: topsoil, type A, type B and type E
To anticipate output channels, the studio offers a classification based on workbook categories, which should always be confirmed with the competent cantonal department. These categories guide the site manager and estimator regarding the destination of excavated spoil removed from the plot.
Topsoil is primarily directed towards agricultural recovery, landscaping or green space backfilling. Unpolluted excavation materials, consisting of rocks, gravel or silts free of harmful substances, are directed to type A landfills or reused to fill excavations when their geotechnical properties are suitable.
Slightly polluted materials or mineral materials from deconstruction find their place in type B landfills. Finally, polluted soils containing hazardous substances fall under the type E category, for which an analysis is required before any admission. The table below summarizes the characteristics adopted for guidance by the studio:
| Workbook category | Nature of materials | Main destination |
|---|---|---|
| Topsoil | Arable and organic surface horizon | On-site recovery or landscaping |
| Type A | Unpolluted excavation materials | Excavation landfill or reuse |
| Type B | Slightly polluted or mineral materials | Inert deconstruction landfill |
| Type E | Soils polluted by hazardous pollutants | Type E landfill or treatment, after analysis |
The studio makes it possible to test these allocations according to six common Swiss terrain types to anticipate the corresponding disposal measurement.
Polluted soil, urban fill and polluted sites register
In urban environments or on plots that have hosted artisanal or industrial activities, the presence of old heterogeneous fills is frequent. These grounds commonly contain slag, brick debris, heavy metals or hydrocarbon residues. Before starting a full-mass excavation or a trench, consulting the cantonal register of polluted sites is an elementary reflex for the company.
The costly mistake on the ground consists of excavating without prior verification of a suspicious terrain and then being refused access to the local landfill with loaded trucks. In case of doubt about potential pollution or when the site appears in the register, the technical action consists of stopping raw disposal, notifying the client and having a chemical analysis carried out by a specialized laboratory. The competent cantonal department then guides the required treatment channel.
Mechanically, these urban fills present uncertain cohesion and variable behavior in the presence of water. By default, the studio adopts an indicative maximum slope of 1:1 for this terrain, while highlighting the need for a specific geotechnical report as soon as the excavation becomes deep or loads approach the crest.
When the permit application must announce construction waste
Spoil management obligations occur upstream of the construction site, as soon as the inquiry file is prepared. According to the Waste Ordinance (OLED), the client indicates in their building permit application the type, quality, quantity and disposal channels for waste when the quantity is likely to exceed 200 m³ or in the presence of hazardous pollutants.
Precise estimation of excavated volumes from the tender phase makes it possible to know if this 200 m³ threshold will be exceeded and to establish this part of the file without approximation.
The studio automatically calculates the exact volume of an excavation using the prismatoid method by integrating the bottom footprint, mid-height, slope crest and surface stripping. This provides the estimator with a clear basis for declaring the expected volumes by disposal class (on-site reuse, type A landfill disposal or transfer to a specialized channel). Such preparation avoids blocking transport logistics during the first weeks of earthworks.
Volume, mass and rotations to the landfill: what the studio calculates
The calculation of disposal costs is not based on the simple in-place volume measured on the plan. Once extracted from the ground, the terrain undergoes mechanical swelling that increases the actual volume to be transported by skips. The studio applies a parameterizable swelling coefficient to move from compacted volume to swelled volume loaded onto trucks.
To determine the necessary logistical means, the studio takes as a baseline a four-axle truck with a payload of 18 tons, a value that can be modified according to the carrier's fleet. From the density of the terrain and the swelled volume, the tool calculates the total evacuated mass and the theoretical number of truck rotations. This approach avoids frequent underestimations in earthworks price offers.
The studio also compares the six Swiss standard terrains for the same excavation geometry:
- Sandy gravel of the Plateau
- Compacted moraine
- Weathered or marly molasse
- Sound sandstone molasse or compact limestone
- Clayey silt or soft lacustrine deposit
- Old heterogeneous urban fill
Soil parameters (density, friction, cohesion, swelling) remain modifiable in the free online tool. To save your measurements on an online construction site or switch these items to a company quote, explore the Tenders module, the ERP management software or your space on the Art Construction Portal.
Contractor liability and duty to notify
The execution of excavation work engages the civil liability and criminal liability of the contractor in the event of an accident or environmental pollution, according to the provisions of the Code of Obligations (CO) and the Swiss Criminal Code. The SIA 118 standard also recalls the company's duty to notify: if the encountered terrain does not correspond to the assumptions of the tender description or if signs of contamination appear, the contractor must notify the client in writing without delay.
Regarding personnel safety, the Construction Work Ordinance (OTConst) sets the provisions applicable to excavations and trenches. Beyond 1.50 m in depth, a wall that is neither shored nor braced must be sloped or secured by other measures. The slope must be adapted to the resistance of the terrain, with additional measures if rain, thawing, loads or tremors compromise it. The free edge of the excavation must be maintained at least 1 m if the wall is sloped and at least 50 cm if it is shored or braced. In addition, proof of slope safety signed by a specialized engineer or geotechnical engineer is required in particular beyond 4 m of slope height, in the event of additional loads or water inflows.
The studio constitutes a decision-support tool for construction site pre-dimensioning. Its results do not replace a soil investigation, nor a technical report signed by a civil engineer or geotechnical engineer according to SIA 267 standard, nor on-site inspection by the site manager.
Frequently asked questions
Does using the excavation calculation studio require an account?
The studio operates for free, without registration and without creating an account. Everything happens in your web browser: no file is sent to a server and no memory is kept. Closing or reloading the tab erases all your construction site input.
What is the difference between OLED type A and type B landfills?
According to the studio workbook, the type A landfill accommodates unpolluted excavation materials from healthy terrain. The type B category receives slightly polluted materials or mineral deconstruction materials. The final classification must always be validated with the competent cantonal department.
When is it necessary to have excavation earth analyzed?
A chemical analysis must be done as soon as a terrain presents visual or olfactory signs of pollution, in the presence of old urban fills, or when the plot is registered in the polluted sites register. Soils directed to the type E category imperatively require this verification.
From what volume must the client declare waste?
According to the Waste Ordinance (OLED), the client must indicate in their permit application the type, quality, quantity and disposal channels for waste when the volume is likely to exceed 200 m³ or in the presence of hazardous pollutants.
How does the studio calculate the number of trucks to anticipate?
The studio first calculates the volume of the excavation using the prismatoid method and deduces the swelled volume loaded onto trucks with the chosen soil coefficient. The evacuated mass comes from the in-place volume and the density of the terrain. It divides this mass by the payload of a four-axle truck, set by default at 18 tons.
Is proof of slope safety mandatory for any excavation?
According to the text of the Construction Work Ordinance, proof signed by a specialized engineer or geotechnical engineer is required in particular beyond 4 m of slope height, in the presence of additional loads at the top of the excavation or during water inflows into the terrain.
What are the technical limits of the calculations provided by the free studio?
The studio applies indicative soil values for a homogeneous terrain without calculating the actual stability of the slope. It does not integrate prices or ACIP descriptions and does not replace a civil engineer calculation report according to SIA 267 standard or a laboratory soil study.