About this tool
Boundary retaining wall: why the footing extends under the backfill
Installing a reinforced concrete wall exactly on a property boundary imposes an immediate geometric constraint: no foundation element may encroach on the neighbouring plot. In this configuration, the usual front toe is eliminated. The entire footing is shifted upstream, beneath the retained soil.
Mechanically, this layout alters the overall equilibrium of the structure. The weight of the backfill soil above the rear heel becomes the predominant stabilising factor. It presses the footing down onto the subsoil and compensates for the absence of an outward projection. The contractor must prepare a wider upstream excavation to cast this footing, as the volume of excavation increases to accommodate the heel.
This page opens the studio with a zero toe. It positions the outer face of the stem along the boundary line whilst applying earth pressure on the fictitious vertical plane behind the footing. This approach provides an initial assessment before submitting the file to a consulting engineering office.
Zero toe: overturning, sliding and eccentricity
The absence of a toe transfers stresses towards the front edge of the stem and modifies load paths. The studio analyses stability according to several failure modes: overturning, horizontal sliding and the eccentricity of the resultant load.
For active earth pressure, the studio adopts Rankine's method applied along the fictitious vertical plane behind the heel, whilst displaying Coulomb's coefficient for comparison. Verifications are based on precise criteria:
- Overturning: the stabilising moment is generated by the self-weight of the concrete and the soil column resting on the heel. The utilisation rate must remain less than or equal to 100%.
- Sliding: the horizontal resisting force depends on friction beneath the footing. The studio allows you to include or omit a shear key under the slab to mobilise a fraction of downstream passive earth resistance.
- Eccentricity: without a front toe to counterbalance rotation, the resultant moves rapidly towards the front edge of the foundation, increasing the risk of uplift at the rear of the heel.
The automated pre-sizing button identifies an economical concrete geometry whilst keeping each utilisation rate below the 95% threshold.
Road or car park surcharge: baseline values and limits
A wall located along a public domain boundary or beneath a roadway is subject to significant operational loads. Traffic from heavy goods vehicles, the presence of a municipal road, or a car parking area generate additional lateral pressure that adds to the lateral earth pressure.
The studio allows you to input this uniform surcharge at the crest of the slope. This live load increases the overturning moment and magnifies the sliding force at the base of the footing. The studio applies this supplementary pressure across the entire height of the fictitious wall.
Water management behind the wall is another critical factor. Water is a common cause of damage and failure in reinforced concrete retaining structures. The studio offers a direct comparison with and without a drainage system:
- With functional rear drainage, hydrostatic pressure does not build up behind the stem.
- Without drainage, full hydrostatic pressure is added to the earth pressure, which doubles or triples the overturning moment acting on the structure.
The integrated soil parameters serve as baseline workbook values without official validity, to be adjusted according to the specific project.
Ground bearing pressures and middle-third resultant
The distribution of contact stresses between the footing and the foundation ground governs the durability of the structure. With an exclusively upstream-oriented heel, the transferred load is not uniform. Maximum ground bearing pressure concentrates under the front edge, directly along the property boundary line.
The studio calculates the position of the resultant action at the serviceability limit state (SLS). If the resultant remains within the middle third of the footing width, the pressure diagram remains trapezoidal and the entire foundation works in compression. If the resultant falls outside the middle third, a theoretical tension zone develops at the rear: the studio then indicates potential heel uplift.
Bearing capacity is assessed according to Meyerhof's model, which applies an effective footing width reduced by the calculated eccentricity. The studio compares the maximum applied pressure with the declared allowable ground bearing capacity. The tool indicates whether the resulting utilisation rate is within or exceeds 100% of the design allowable value.
Neighbours, roadways and ground investigations: when a formal survey is required
The pre-sizing carried out in the browser provides initial geometric guidance, but in no way replaces professional on-site engineering assessments. The Construction Work Ordinance (OTConst / BauAV) requires a safety verification signed by a geotechnical specialist or civil engineer for heights exceeding 4 m, or in the presence of additional surcharges or water ingress.
The intervention of a civil engineer and the completion of a ground investigation according to standard SIA 267 are essential in the following cases:
- Presence of an adjacent building within the wall's zone of influence.
- Structure exceeding 4 m in height or presence of a groundwater table.
- Unstable slope or permanent execution of a retaining structure.
- Wall located close to a roadway: subject to validation by the project engineer.
For reinforcement calculation, the studio assumes simple bending for both stem and footing, using B500B rebar in C30/37 concrete. It does not check shear force, crack control, or anchorage lengths, which remain part of the final detailed design project.
Contractor liability near a boundary or roadway
On the construction site, the contractor is responsible for carrying out the works in accordance with the rules of the trade, SUVA regulations, SIA standards 118, 260, 262, and statutory obligations under the Code of Obligations (CO) (Code des obligations). During excavations near a road or a built parcel, any settlement or slope failure may trigger civil liability (responsabilité civile), or even provisions of the Swiss Criminal Code in the event of bodily endangerment.
Excavated soil must also be managed in compliance with the Waste Ordinance (OLED / VVEA). Unpolluted excavated earth must be sorted on the construction site to be recycled or reused wherever possible. The client indicates in their permit application the type, quality, quantity, and disposal or recycling pathways when the expected excavation volume exceeds 200 m³ or if hazardous contaminants are suspected. If there is any doubt regarding the environmental quality of the soil, verification with the cantonal authority and laboratory testing are required.
The free studio runs entirely within your browser: no login details are required, no files are transmitted to a server, and no data is stored. Closing or refreshing the page resets all inputs. To preserve your records, manage study revisions, and export your take-offs into a priced quote module aligned with the cantonal ACIP database, explore our suite featuring Soumissions, our ERP software, and the Portail solution.
Frequently asked questions
How do you stabilise an L-shaped retaining wall if the footing cannot cross the boundary?
When there is no toe, equilibrium relies entirely on the width of the heel extending under the upstream soil. The weight of the compacted backfill on this footing compensates for the lack of front support. If sliding remains an issue, adding a shear key under the slab helps mobilise additional lateral passive resistance in the foundation ground.
What live load surcharge should be applied at the top of a roadside wall?
The studio provides standard guideline values for uniform surcharges to model vehicle movement or parking. This operational surcharge depends on traffic intensity and vehicle classifications: it must be confirmed by the project engineer. It introduces supplementary lateral thrust acting across the full back face of the structure.
What should be done if the load resultant falls outside the middle third?
A resultant outside the middle third indicates theoretical uplift beneath the heel and high stress concentration along the front toe edge. To resolve this, increase the upstream heel width, lower the foundation founding level, or reduce lateral earth pressure through an efficient rear drainage system.
Why is rear drainage critical along a boundary line?
Water accumulation is a classic cause of structural failure. Without a drainage layer and collecting pipe, hydrostatic pressure adds to the lateral soil load. This additional pressure can double or triple the overturning moment, requiring a substantially oversized upstream heel or a much thicker concrete stem.
What are the OTConst requirements for retaining wall excavations?
The Construction Work Ordinance (OTConst) requires that, beyond a depth of 1.50 m, an unshielded excavation must be battered back or adequately supported. A clear berm of at least 1 m must be maintained along the crest of the slope. A structural stability certificate signed by a qualified geotechnical engineer is required for heights over 4 m, or in the presence of surcharges and water ingress.
How should excavated soil be sorted and removed under OLED regulations?
The Waste Ordinance (OLED) requires unpolluted soil and excavation material to be sorted on the construction site to maximise recycling and recovery. When the expected excavation volume exceeds 200 m³ or if contaminants are present, the client must specify disposal and recycling pathways in the building permit application. In case of uncertainty, chemical analysis and consultation with the cantonal department are mandatory.
What are the limitations of the calculations in this online studio?
The free studio applies the Rankine and Meyerhof methods for homogeneous ground without downstream passive resistance and neglecting cohesion on the active side. It calculates the required steel reinforcement area under simple bending, but does not verify shear stress, cracking limits, or differential settlement. Results serve as a preliminary sizing aid and cannot replace a comprehensive civil engineering investigation in accordance with standard SIA 267.