How much does earthmoving cost: why a price per cubic metre without a take-off is a trap
Drawing up an earthmoving quote based on a simple lump-sum price per cubic metre often leads to major discrepancies on the construction site. A quick estimate treats excavation as a simple rectangular block. In reality, an excavation incorporates slope geometry, initial topsoil stripping and constraints imposed by the workspace. Without precise detail, the company underestimates the volumes of material to extract and dispose of.
On site, the nature of the ground modifies the handled volumes. The studio offers six typical Swiss ground types with editable default values, namely sandy gravel from the Plateau, compact moraine, weathered or marl molasse, sound sandstone molasse or compact limestone, clayey silt or soft lacustre deposit, and heterogeneous old urban fill. These indicative values must be confirmed by a site-specific geotechnical report.
The classic mistake is to order skips based on the theoretical in-place volume. As soon as the excavator extracts the earth, the material bulks and takes up more space. To anticipate actual transport and disposal costs, the bulked volume must be calculated using the bulking coefficient of the encountered soil.
Items in an earthmoving quote: stripping, excavation, disposal, backfill
A comprehensive earthmoving quote structures operations according to the logical progress of the work. The first step concerns topsoil stripping. This surface material is carefully stripped and then stored separately on the construction site to be reused later for external works.
Next comes bulk excavation. According to the Ordinance on Construction Work (BauAV), as soon as an excavation exceeds 1.50 m in depth, an unsupported or unshielded wall must be sloped or secured by other measures. The slope must be adapted to the soil's strength, with special measures if rain, thawing, loads or tremors compromise its stability. A vertical wall without shielding beyond 1.50 m is flagged as a blocking issue by the studio. Furthermore, the edge of the excavation must remain clear for at least 1 m if the wall is sloped, and for at least 50 cm if it is supported or shielded. The studio also retains a clear strip of at least 1 m along a plant track and a clear working space of at least 0.60 m between the structure and the toe of the slope.
For the disposal of earth to authorised channels, the Ordinance on Waste (OVaut) prescribes that earthen and excavation materials must be sorted on the construction site and recycled as far as possible if they are unpolluted. The client indicates in their permit application the type, quality, quantity and disposal channels when the quantity is likely to exceed 200 m³ or in the presence of hazardous pollutants. Finally, peripheral backfilling requires suitable imported gravel if the extracted soil is not reusable.
Items for a retaining wall: blinding concrete, formwork, concrete, steel, drainage
Pricing an L-shaped reinforced concrete retaining wall brings together several inseparable items. Earthmoving prepares the foundation bed which receives blinding concrete. This lean concrete provides a clean, flat surface to lay the footing reinforcement without direct contact with the earth.
Quantities are then broken down between formwork for both faces of the stem, formwork for the footing edges, pouring structural concrete and shaping B500B steel reinforcement. The studio's sizing evaluates the stem's bending moment to propose a reinforcement section calculated against Rankine's active earth pressures. It also checks overturning stability, sliding and eccentricity under the footing according to Meyerhof's approach.
Rear drainage constitutes a key structure for the wall's durability. Water accumulated behind the stem represents a classic cause of excessive pressure: without a drain, hydrostatic pressure adds to that of the earth, which multiplies the loads. The take-off counts rear drainage in metres of wall and the protective membrane in square metres.
From calculation to quantities: take-off formulas
To obtain reliable bulk cubatures, the studio applies the geometrical prismoidal formula by dividing the solid according to its lower base, its mid-height section and its upper crest. This method incorporates the width at the bottom of the excavation, the working space of at least 0.60 m, as well as the slope of the four embankments.
The table below summarises the transition from theoretical parameters to take-off items:
| Take-off item | Calculation formula or parameter | Quantity to report |
|---|---|---|
| Topsoil stripping | Enlarged crest footprint, multiplied by the stripped thickness | In-place volume |
| Bulk excavation | Prismoid (bottom, mid-height, crest) | Theoretical extracted volume |
| Spoil disposal | Extracted volume multiplied by bulking | Bulked volume or mass in tonnes |
| Truck rotations | Total mass divided by payload | Number of transports required |
| Blinding concrete | Enlarged footing surface | Surface area or volume of lean concrete |
| Reinforced concrete wall | Stem and L-footing section | Volume of C30/37 concrete |
The bulked volume directly determines the number of rotations for four-axle tipper trucks. The formulas remain visible within the tool, ensuring step-by-step control before deploying mechanical means.
Pricing with the ACIP base: what happens on the server
The online tool operates 100% within the browser: nothing is sent, nothing is saved and no browser memory is retained. Closing or reloading the tab erases all input. This free version allows detailed cubatures to be established and a CSV table to be exported featuring the free version notice, or a study sheet bearing an Art Construction watermark to be printed.
The free version contains no prices, codes or descriptions from the ACIP base. Financial pricing is carried out exclusively on the server via the Pro formula. The take-off established in the browser can then directly feed the Tenders application to associate regional unit prices with the calculated volumes.
Switching to Pro mode via the ERP or the Porthal also allows files to be saved in the cloud, successive versions of a construction site to be managed, team collaboration, and pre-sizing reports to be edited in your company's branding, without any watermark.
Responsibility of the contractor submitting a price
Using a calculation studio constitutes a decision-making aid during preparatory study, but it does not remove the technical responsibility of the professional submitting their tender. Slope stability depends on local singularities that only an on-site inspection can reveal.
The Ordinance on Construction Work (BauAV) requires justification of slope safety signed by a specialised engineer or geotechnical engineer, particularly beyond 4 m of slope height, in the event of additional loads or water inflows. The studio displays an orange warning from 1.50 m with water or a crest load, and a red alert beyond 4 m advising a berm at mid-height. Default values (cohesion, internal friction, slope class) remain indicative: they must be replaced by data from a site geotechnical report.
Similarly, for the L-shaped wall, checks are limited to simple bending and overall global stabilities. Shear reinforcement, cracking, contraction joints or anchorages require the intervention of the civil engineer responsible for the structure.
Frequently asked questions
How does the studio check the safety of a sloped excavation?
The studio applies the rules of the Ordinance on Construction Work (BauAV). An unsupported vertical wall of more than 1.50 m is flagged as a blocking issue. It applies default slopes per soil class and triggers an alert beyond 4 m of slope height, recalling the obligation for justification signed by a specialised engineer or geotechnical engineer.
What is the difference between excavated volume and bulked volume?
The excavated volume corresponds to the in-place soil calculated according to the excavation geometry. Once extracted by the mechanical excavator, the soil decompresses and its volume increases. The bulked volume incorporates this expansion coefficient to size the number of disposal trucks required to the landfill site.
Why provide drainage at the rear of a retaining wall?
The presence of pore water constitutes a classic cause of damage on retaining structures. Without a drainage system, water pressure adds to earth pressure, which greatly increases the overturning moment. Drainage protects the stem and maintains structural stability.
Are the data entered in the online studio saved?
In the free version, calculations run 100% in your browser. No data is transmitted or stored on a server. If you close or reload your tab, all entries are erased. Cloud backup is reserved for Pro version users.
What obligations apply to the disposal of excavation earth according to OVaut?
According to the Ordinance on Waste (OVaut), materials must be sorted on the construction site and recycled if unpolluted. If the volume is likely to exceed 200 m³ or presents hazardous pollutants, the client must declare their nature, quantity and disposal channel in their permit application.
Can a priced quote be obtained directly within the free tool?
The free version provides the complete quantitative take-off with its formulas, without displaying any unit price. Automated pricing with ACIP pricing base codes and descriptions is carried out on the server in the Pro version, with transfer to the quote module.
Does the pre-sizing of the wall replace the plans of a civil engineer?
No. The online calculation provides indicative pre-sizing in simple bending according to simplified soil assumptions. For final execution, site investigation and calculation notes signed by a civil engineer in accordance with SIA 267 standards remain mandatory.