Loading...
About this tool
Why a Facade Produces Less in Summer but Matters in Winter
Installing solar panels on a facade or balustrade changes a building's production logic in Switzerland. On a standard roof, the tilt captures very strong direct radiation during the warm season, when the sun is highest in the sky. On a south-facing facade or a vertical balustrade, the geometry reverses this behavior. In mid-summer, the angle of incidence of solar rays on a vertical wall is grazing, which reduces gross production per square meter compared to a roof slope.
In winter, the situation flips. The sun stays low on the horizon for several months. The rays then strike the vertical modules at a much more direct angle of incidence than on a flat or slightly sloped roof. Moreover, snow does not accumulate on a vertical cladding or glass balustrade, whereas it can cover roofs and completely block their production for days. If the ground or a terrace below is covered in snow, diffuse reflection further increases the light received by the facade.
This distribution is particularly well-suited to the actual energy needs of buildings in Western Switzerland. During the cold months, the building's needs for heating and domestic hot water increase. The facade provides a significant share of electricity precisely when the general grid records its highest demand peaks. The overall annual volume is lower than that of a roof, but the kilowatt-hours obtained fall during the critical period of the calendar.
The Orientation Factor and Its Starting Value
To estimate the predictable production of a solar installation, the quantity surveyor or architect applies an orientation factor. This coefficient weights the theoretical solar resource according to the azimuth and installation angle of the modules. This page opens the solar tab on a south-facing facade at 85° integrated into the building. At this almost vertical tilt, the orientation factor from the starting specifications is lower than that used for a traditional tilted roof facing south. The resulting power generation curve is flattened in summer and raised in winter.
This orientation factor provided by default is not set in stone. The local conditions of your project modify field reality: a distant mask created by mountainous relief, the shadow cast by a neighboring building, trees, or a loggia recess reduce the irradiation received by the facade. Conversely, an open space in front of the building or a light-colored courtyard amplifies the light reflected toward the bottom of the walls.
You can directly correct this starting value in the calculation screen. Simply replace this coefficient with the precise orientation factor from your shading simulation tool or 3D site modeling. The calculation will recalculate the forecasted production without modifying the rest of your take-off data.
The Tilt Bonus: Integrated or Added
To support winter production, the single-use incentive managed by Pronovo includes specific financial provisions for vertical and heavily tilted walls. The single-use incentive tilt bonus applies from an installation angle of at least 75%. Vertical facades, active cladding, and balustrades fall into this geometric category.
The amount of this aid depends on the construction nature of the installation:
- Building-integrated installation: the solar module fulfills a waterproofing, facade cladding, or physical balustrade function in direct replacement of a traditional building material. For these achievements, the tilt bonus is higher.
- Added installation: the modules are fixed over an existing facade using a sub-structure, without ensuring the envelope's waterproofing or replacing cladding elements. The allocated financial aid remains accessible, but its scale is lower than that of the integrated system.
The amounts proposed in the tool are indicative values from the parameterization manual. They are fully modifiable. These scales have not been proofread at the source and must be verified against current guidelines from Pronovo and your canton before finalizing a financial plan. In addition, cantonal aid most often requires a complete application submission before actual work begins on the construction site.
Facade, Balustrade, and Coupling with the Heat Pump
The integration of photovoltaic collectors on balcony balustrades or along facade spandrels makes complete sense when combined with the operation of a heat pump. When the cold season sets in, the heat pump's electricity consumption rises to cover the thermal losses of the envelope. This is precisely the period when the sun's low angle favors capture on vertical elements.
The screen displays together the forecasted electricity production, the self-consumption rate with the heat pump, and the estimated single-use incentive. This global view makes it possible to measure the share of production consumed directly on site without injection into the public grid. Photovoltaic balustrades are a useful technical complement for multi-family buildings where the available roof surface area relative to the number of apartments remains limited.
The joint dimensioning of solar and the heat pump also requires acoustic vigilance. The evaluation of the machine's external noise relies on the method from the Noise Bulletin execution aid. You must report the sound power level value from the manufacturer's technical sheet or the list of the Swiss Professional Group for Heat Pumps. This preliminary calculation helps place the unit on the plan, but it does not replace the official noise protection form required for the building permit application.
The Costly Mistake in the Field
On the construction site, the classic mistake is validating the panel layout of facade or balustrade modules without noting the location of ventilation units, rainwater downpipes, and concrete overhang returns. Junction boxes or solar panels are often seen blocked during installation because a ventilation duct or air exhaust crosses the lining at the exact spot planned for the load-bearing framework or structural fixings.
A second frequent blunder concerns the underestimation of cast shadows at ground level. In winter, neighboring buildings cast elongated shadows that can mask the bottom of a south facade for several hours of the day. If module strings are connected in series over the entire height of the wall without appropriate sectioning, the shading of the lower panels lowers the yield of the entire electrical branch.
The action that avoids these setbacks lies in a rigorous check of the technical reservation plan before ordering glass elements and arranging electrical circuits. Check shadow altimetries at the winter solstice and separate the wiring of lower rows from that of upper floors. This preliminary check protects the work's profitability without forcing the trade master into improvised modifications right in the middle of the assembly phase.
What the Free Version Does Not Do
The tool available on this page works for free, without registration and without creating a user account. Processing takes place in your web browser: the imported plan, positions, entries, and calculated results remain on your workstation. The only exception occurs if you enter an address to display a background map: the location request and corresponding map area are then sent to the Confederation's public swisstopo API in read-only mode. No data is sent to Art Construction servers.
This free version has no working memory. Nothing is saved on a server. If you close the window or reload the page, all entered data and quantities are erased. Remember to export your documents before leaving the application. In addition, image exports and printed sheets bear an Art Construction watermark, and the CSV quantity export includes mention of the free version. The tool contains no unit price extracted from the ACIP database: execution costs must be entered manually by you, and aid scales remain modifiable starting values to be validated by the user.
To go further on your construction sites, the full versions offer extended features for professional teams:
- Save your folders directly to the cloud with successive version management in the Portal or ERP.
- Resume an existing project at any time to update it through construction addenda.
- Transfer quantities to the Tenders module to establish your quotes with the ACIP price database.
- Activate collaborative work in Team mode on the same technical folder.
- Generate final engineering reports and watermarked-free exports, customized to your company's colors and header via our offers for professionals.
Frequently asked questions
From what tilt angle does the Pronovo bonus apply?
The tilt bonus for the single-use incentive applies from an installation angle of 75%. Vertical facades as well as vertical balustrades fulfill this condition. The granted amount differs depending on whether the installation is integrated into the building or simply added onto the existing envelope.
What is the difference between an integrated and added facade?
An integrated installation replaces a construction element while ensuring a waterproofing or mechanical balustrade function. The added installation consists of placing modules on a structure fixed over an existing facade. The financial aid for the integrated system is higher than for the added one.
Are calculation results kept if I close my browser?
No. The free version has no storage memory. If you close or reload your tab, all information and quantities are erased. You must export your work to CSV or print your sheet before leaving the page.
Are my plans and construction site data sent to Art Construction?
No file or result is transmitted to Art Construction. Everything executes locally in your browser. The only external transmission concerns the address and map background requested from the Confederation's public swisstopo API when you perform a location search.
Where do the subsidy scales displayed in the tool come from?
The amounts come from the studio's basic parameterization manual. They constitute modifiable starting values. They have not been proofread at the source and must be verified with Pronovo and your canton's energy department.
Does the heat pump acoustic estimation replace the official certificate?
No. The calculation applies the Noise Bulletin execution aid method for indicative purposes. It in no way replaces the noise protection certificate required for the building permit application nor the opinion of the competent authority.
Can I modify the orientation factor proposed by default?
Yes. The starting value calculated for a south facade at 85° is indicative. You can replace it directly in the provided field with the orientation factor from your shading simulation software or local solar study.