Why replace fixed electric heating with a heat pump
Replacing fixed electric heating with a heat pump concerns many detached houses and small apartment blocks in Switzerland. Direct heaters or storage heaters convert current directly into heat. This installation consumes a significant amount of electricity every winter. Installing a heat pump captures calories from the air, ground or groundwater to heat the building using a large proportion of renewable energy.
From a contractual and technical perspective, this transformation completely changes the heating principle. The building moves from decentralized room-by-room production to a centralized generator. A technical room must be created or a location reserved for the indoor unit, a control panel installed and pipe runs planned to each floor. Unlike replacing an oil or gas system, you will not find an oil tank to cut up or a cluttered flue. However, the take-off contains no boiler removal: direct electric heating has no existing boiler to dismantle or dispose of.
The project also requires a careful review of the main electrical panel. Removing the heating elements frees up power on the miniature circuit breakers, but the new machine requires a dedicated power supply suited to the compressor and safety devices. This technical point must be coordinated between the heating engineer and the electrician during the initial visit.
From electricity consumption to machine power
To assess the required thermal power, our tool starts sizing via consumption with a starting value of 16,000 kWh of electricity per year. The efficiency of direct electric heating is 1. All final energy measured at the meter therefore corresponds directly to useful heat delivered to the building's rooms.
The required power is then calculated by dividing this useful heat by the site's equivalent full-load hours. These hours depend on altitude, climate zone and building type. The starting values proposed by the software for equivalent full-load hours, efficiencies and specific loads remain indicative orders of magnitude to be confirmed. You can modify each parameter in the input fields to match the building's thermal reality.
The machine is then selected and checked at the design temperature of -7 °C. At this outdoor temperature, the compressor must cover the building's heat losses without excessive recourse to a backup heater. The tool also includes a module for noise calculation according to the Noise Circle execution guideline method. This indicative calculation helps position the outdoor unit relative to neighbours' windows. It replaces neither the noise protection certificate required for the building permit, nor the decision of the municipal or cantonal authority. You must check the sound power level on the manufacturer's technical datasheet or in the sound data list of the Swiss Professional Association for Heat Pumps.
Cantonal grants and replacement obligations: check your canton
Several cantons set legal requirements or progressive renovation obligations for fixed electric heating. In parallel, cantonal incentive programmes financially support the transition to air-water or brine-water heat pumps. The grant amount depends on the type of appliance installed, the removal of electric heating elements and the overall thermal power.
In the application, the cantonal grant for replacing fixed heating is entered in the solar tab using the canton's scale. The grant scales integrated in the tool are those of the studio workbook and have not been reviewed at the official source. You must personally check the scale in force with your region's cantonal energy office. In addition, several cantons strictly require the grant application to be submitted before work actually begins. Any signed quote or construction site started prior to prior agreement may lead to the refusal of financial support.
The costly mistake on site concerns the administrative timeline. Clients are often seen ordering the heat pump and having the first pipes installed before receiving the cantonal acknowledgement of receipt. To avoid the outright loss of grants, the installer must state on their quote that the start of work remains conditional on the validation of the grant application by the authority.
Heat distribution: radiators or underfloor heating
A building heated by electric radiators or storage heaters has no hydraulic distribution network. Replacement with a heat pump therefore requires the complete creation of this network in all living rooms. This step represents a significant share of the quote and working time on the construction site.
The main technical choice is between installing hot water radiators and underfloor heating. This choice changes the water temperature regime. A heat pump has a higher efficiency coefficient when the flow temperature remains low. Underfloor heating operates with low-temperature water, which limits the compressor's work in the dead of winter. Conversely, its integration during renovation requires removing floor coverings or applying a low-thickness dry system, with door and threshold adjustments.
Installing hot water radiators requires less invasive work on floors. However, to maintain good efficiency on the heat pump, large radiators capable of heating at medium or low temperature should be sized. The installer must also include in their take-off core drilling through slabs, insulation of risers in technical shafts and the connection of a buffer tank to ensure the machine's defrost cycles without disturbing occupants' comfort.
What the free version does not do
The online version of Art Construction is provided free of charge, without registration and without account creation. You use it directly in your web browser. The imported plan, drawn positions, your inputs and sizing results remain in your browser. The only exception concerns address searching to display a background map: the entered address and displayed area are transmitted to swisstopo via its public read-only API. Nothing is sent to Art Construction's servers.
This free version has no memory. Nothing is stored on a server: reloading the page or closing the tab immediately erases your data. You must export your work before leaving the page. The exported plan and printed sheet feature an Art Construction watermark, and the CSV take-off export bears the mention of the free version. In addition, the tool contains no prices from the ACIP price database: the unit cost of supplies and installation must be entered by you.
To go further in managing your construction sites, you can use the paid range with our tenders, ERP and Portal software. These solutions allow you to save your projects on a secure cloud space, load an existing file, work as a team and output watermark-free reports with your company contact details. You can also transfer calculated quantities to our pricing tool integrating the ACIP database then generate complete commercial quotes on our dedicated Pro quotes page.
Frequently asked questions
Does the sizing calculation take into account the efficiency of old radiators?
Yes. For direct electric heating, efficiency is 1. The tool therefore considers that the totality of the annual consumption of 16,000 kWh of electricity entered at the start corresponds to useful heat injected into the building to offset heat losses.
Can the tool be used to justify noise to the municipality?
The tool uses Noise Circle formulas to assess noise impact. This is an indicative technical aid. This calculation does not replace the official noise protection certificate or the agreement of the municipal department when applying for the building permit.
Where can I find the sound power of the heat pump?
The sound power value must be taken from the technical datasheet provided by the appliance manufacturer or consulted in the sound data list published by the Swiss Professional Association for Heat Pumps.
Why is there no boiler removal item in the take-off?
Direct electric heating operates with radiators or storage heaters without a central boiler. There is therefore no boiler or burner to dismantle or dispose of as part of this work.
When should the application for cantonal replacement grants be made?
In several cantons, the complete financial grant application must be submitted and validated before work starts on the construction site. A signed order or a construction site started before prior agreement may cancel the right to the subsidy.
Is my calculation data saved on your servers?
No. In the free version, calculations and data remain stored locally in your web browser. If you close the tab without exporting your documents, all entered information is permanently lost.
Are the subsidy amounts indicated contractual?
No. Cantonal grant scales come from the studio workbook and are not updated automatically at the source. You must check the amounts and eligibility criteria with your canton's energy office.