How the one-off fee for a small photovoltaic system is calculated
For a solar installer, electrician, or client, estimating federal subsidies starts with the one-off fee managed by Pronovo. This financial assistance takes the form of a one-time payment for the construction of a photovoltaic solar installation. The total amount depends on the installed capacity, expressed in kilowatt-peak.
In our tool, the page opens directly on the solar tab with a base capacity of ten point eight kilowatt-peak. The calculation is based on a tiered capacity system. A financial contribution applies for the first tier, for example for capacity up to thirty kilowatt-peak, and then a different contribution applies for the capacity tier beyond this threshold. This tiered principle allows the aid to be adjusted according to the size of the roof covered by the solar panels.
However, there are application limits. The one-off fee for small installations only applies within a well-defined capacity range. If your project is below the required minimum or exceeds the maximum threshold set by the aid framework, the simulator will indicate this immediately on the screen. You thus know whether the file falls under this scheme or if it requires different administrative processing.
On the construction site, every square meter counts to make the assembly time of the modules and the routing of technical shafts profitable. Calculating the Pronovo aid right from the preliminary project stage allows you to set the size of the sensor array with the client without any unpleasant surprises on the final financial statement.
Bonuses: steep inclination, carport
Not all photovoltaic installations are flat-mounted or on a traditional medium-pitch roof. Certain architectural typologies require specific structures and grant entitlement to specific financial supplements in the form of bonuses.
The simulator takes into account two frequent cases on construction sites in western Switzerland:
- The steep inclination bonus: this concerns in particular solar modules integrated into facades or placed as balcony balustrades. In winter, these vertical walls capture valuable direct solar radiation when the sun remains low on the horizon.
- The carport bonus: it applies to structures erected above parking spaces to shelter vehicles while producing renewable electricity.
These bonuses modify the amount of the one-off fee. When you activate the option for a facade or a carport in the interface, the calculation adds the corresponding line to the result. For both the artisan and the designer, this distinction avoids underestimating financial returns when preparing the technical offer.
The costly mistake in the field consists in promising a facade bonus for panels that do not reach the angle of inclination required by the guidelines. Files are often rejected during the final inspection because the sensors are laid too flat. The action that avoids this mistake is simple: check the real angle on the architect's cross-section before validating the bonus box in your measurement.
A modifiable scale rather than a fixed value
The amounts allocated as the one-off fee evolve over time according to decisions by federal authorities. In our free tool, the scale is displayed with its year of release. However, each value remains entirely modifiable in your browser.
The values integrated into the studio come from the studio notebook. They have not been proofread at the official source. We therefore invite you to check the scale in force with the managing body at the time of your entry. You can then adjust the base contribution per tier, the amount per kilowatt-peak, or the value of the bonuses directly in the provided boxes.
This flexibility protects your study. If a tariff revision comes into force between the first draft and the signing of the contractor agreement, you correct the figure in a few seconds without waiting for a software update. You keep control over the economic calculation of your installation.
Similarly, the starting values relating to solar technology or the building (equivalent full-load hours, yields, specific loads, machine template values, design temperature, and station irradiation) remain simple orders of magnitude to be confirmed. They are freely modifiable according to the reality of your terrain and the altitude of the structure.
Combining one-off fee, cantonal grant, and municipal grant
As part of a village house renovation or a rental building, the installation of photovoltaic panels is regularly accompanied by a change of heating system. Financial aid can then be combined to ease the overall bill for the work.
The simulator allows you to integrate these different streams:
- The Pronovo one-off fee for the electricity production part.
- The cantonal grant linked, for example, to replacing fossil fuel heating with a heat pump or a district heating network.
- Municipal subsidies voted by certain municipalities to encourage the local energy transition.
The cantonal and municipal grant scales entered in the tool are those from the studio notebook. Just like for the Confederation, they have not been proofread at the source and must be verified by you with the relevant administration before any firm commitment. Each canton applies its own subsidy conditions depending on whether you operate in Vaud, Geneva, Valais, Fribourg, Neuchâtel, or Jura.
Regarding projects combining solar and heat pumps, let us recall that the noise calculation proposed in our tools follows the enforcement aid of the Noise Circle (Cercle Bruit). It replaces neither the noise protection certificate to be submitted with the building permit application, nor the decision of the municipal or cantonal authority. The acoustic power level to be entered in this context comes from the manufacturer's technical datasheet or the sound data list established by the Swiss Professional Group for Heat Pumps.
Submitting the application in the correct order
The administrative chronology of a solar or energy renovation construction site tolerates no missteps. A subsidy can be purely and simply refused if work begins before the competent department validates the form.
For cantonal grants, the general rule requires submitting the application before work begins. Concretely, no equipment must be ordered with an advance payment and no framework or electrical element must be dismantled before receiving the acknowledgment of receipt or formal authorization from the canton. Anticipating this delay in the construction schedule avoids major disputes with the client.
For the Pronovo one-off fee, payment occurs after the completion and commissioning of the installation, upon presentation of the completion notice from the electrical installer holding the installation authorization. However, to plan the company's cash flow and capital calls, the estimated amount must appear in the initial financing plan.
The site manager must maintain a rigorous dashboard of dates: project announcement, cantonal acknowledgment of receipt, start of assembly on roof lathings, OBTIC inspection by an independent body, and transmission of the finalized file for payment. Compliance with this sequence preserves the subsidies calculated during the quote.
What the free version does not do
The simulator accessible on this page works free of charge, without registration, and without creating an account. You use it directly in your web browser. The imported plan, drawn positions, your entries, and your figured results remain confined to your browser. There is a single technical exception: if you search for an address to display a map background, this address and the corresponding map area are requested from swisstopo via the Confederation's public API in read-only mode. Nothing is sent to Art Construction's servers.
This free version has no memory. Nothing is stored on a server: if you close or reload your tab, all your entries are erased. You must export your work before leaving the page. The plan image and printed sheet feature a watermark in the name of Art Construction, and the CSV export of the measurement mentions the free version.
Furthermore, the free tool contains no pricing data from the ACIP database. The cost of the work is entered manually by you, and the displayed grant scales are modifiable starting values that you must check.
For companies managing dozens of construction sites per year, the paid suite grouping Tenders, ERP, and Portail offers extended features:
- Save the project to a construction site in the cloud with successive version history.
- Load a saved project at any time.
- Cost the work using the ACIP price database then inject quantities directly into the company quote.
- Activate Team mode to work with multiple site managers on the same file.
- Generate an export without watermark, customized to your company's colors and header via our solutions for professional offers.
Frequently asked questions
How is the Pronovo one-off fee calculated for a single-family home?
The calculation relies on a base capacity and applies a rate per capacity tier expressed in kilowatt-peak. A first tier covers capacity up to thirty kilowatt-peak, supplemented by a different tier beyond that. The simulator applies these tiers automatically based on the values entered in the interface.
What bonuses apply to a photovoltaic installation?
Pronovo provides financial supplements for two architectural configurations: a steep inclination of the solar array (modules on facade or on balustrades) and the arrangement of a carport. If your installation meets these criteria, the bonus amount is added to the base contribution calculated by tiers.
Are the scales displayed in the simulator verified at the source?
No. The federal and cantonal grant scales correspond to the data entered in the studio notebook and have not been proofread at the source. You must verify the official scale in force. The tool allows you to modify each amount manually to reflect the updated scales at the time of your project.
When should the grant application be submitted to the canton?
As a general rule, the application for cantonal grants for heating replacement or energy efficiency work must be submitted and registered before work begins on the construction site. Any early commencement without prior agreement from the administration can lead to the permanent loss of the right to the subsidy.
Is my data entered in the free simulator saved?
No. Everything stays in your web browser without any storage on our servers. Closing or reloading the tab erases all your work. Only the address search for a map background queries swisstopo's public API in read-only mode. You must export your document before closing the session.
Can the studio's acoustic calculation be used for a building permit application?
The proposed noise calculation follows the Noise Circle enforcement aid but does not replace the noise protection certificate required for the building permit, nor the authority's decision. You must enter the acoustic power taken from the manufacturer datasheet or data from the Swiss Professional Group for Heat Pumps.
What advantages does the paid version bring for an installer?
The paid software Tenders, ERP, and Portail allow you to save files to the cloud with version management, cost using the ACIP price database, collaborate as a team on tenders, and produce watermark-free reports in your company's colors.