From Heating Capacity to Subsoil Extracted Capacity
The sizing of a geothermal installation begins with the evaluation of the building's thermal requirements. The tool defaults to a ground source heat pump of approximately 12 kW. To determine the linear footage of drilling, you must first isolate the share of energy actually drawn from the ground. A thermodynamic machine combines the electrical energy supplied to the compressor and the thermal energy extracted from the subsoil.
The calculation applies a direct physical relationship: the capacity extracted from the subsoil equals the heating capacity multiplied by one minus one over the coefficient of performance (COP) taken at the B0/W35 operating point. This reference value corresponds to brine entering at zero degrees and heating supply water at thirty-five degrees, a common situation for underfloor heating in the middle of winter.
On site, the costly mistake is confusing the total capacity delivered to the distribution network with the capacity requested from the subsoil. If you size the probe on the entire 12 kW of heating without deducting the electrical input of the compressor, you get a drilling that is too long. Conversely, overestimating the COP leads to undersizing: the probe thermally depletes over the winters, the heat transfer fluid temperature drops and the compressor consumes more electricity to compensate for the lack of underground heat.
All calculation variables are modifiable in the interface: required thermal capacity, COP of the machine and annual operating hours. The values proposed upon loading constitute starting orders of magnitude. The surveyor or heating engineer adapts these figures according to the thermal balance established for the building and the technical documentation of the machine manufacturer.
Drilling Length According to Ground Nature
Once the underground cooling capacity is established, the next step consists of converting this thermal load into meters of drilling. The total length of the vertical probe is obtained by dividing the capacity extracted from the ground by the unit extraction capacity specific to the local geology. The displayed result is rounded to the multiple of five meters, which corresponds to the current practice of drilling companies.
The thermal exchange capacity varies greatly depending on the geological layers encountered during excavation work:
- Plateau molasse: sedimentary formation frequent on the Swiss plateau, with an average extraction rate.
- Water-saturated gravel: alluvial formations where the flow of a water table considerably improves thermal transfer by convection.
- Dry limestone and clay: consolidated rocks or soils presenting higher thermal resistance, requiring a greater cumulative depth to extract the same amount of heat.
The tool integrates a starting value for each of these soil types, as well as a modifiable correction coefficient. This coefficient makes it possible to refine the estimation when the subsoil presents an alternation of molasse layers and scree. The usual mistake is to adopt an optimistic extraction capacity without consulting the cantonal geological register or the history of neighboring construction sites. If the real ground conducts heat less well than expected, the ground freezes around the tubes and natural regeneration in summer is no longer sufficient to restore the balance of the rock mass.
No External Noise with a Ground Source Heat Pump
Unlike air-water heat pumps which integrate a ventilated evaporator placed on a facade, a garden or a roof, the ground source heat pump does not reject any aero-acoustic component outside. The compressor, plate heat exchanger and circulators are installed inside the technical room or boiler room.
On the acoustic radar of our tool, the external noise emission value remains zero. The generated measurement sheet automatically removes the external sound attenuation item and directly adds the geothermal drilling item with the calculated probe lengths. This configuration considerably simplifies relations with the neighborhood in a dense built environment.
However, the machine emits vibrations and noise inside the building. The installer must ensure mounting on anti-vibration pads and the installation of flexible sleeves on the hydraulic outlets to avoid the transmission of solid-borne sound to the living rooms located on the upper floors. The calculation of the noise produced by the compressor is based on the method of the Noise Circle execution aid. This indicative result does not replace the noise protection certificate requested during the permit application, nor the final decision issued by the urban planning services. For your internal acoustic checks, always enter the sound power levels indicated on the manufacturer's documentation or in the registers of the Swiss Professional Group for Heat Pumps.
Authorization, Depth and Number of Drill Works: What the Studio Does Not Calculate
The calculation of the total length constitutes only one part of the execution file. The implementation of a vertical geothermal probe depends on legal, hydrogeological and technical constraints that our tool does not take into account:
- The number of drill works: a large cumulative length is rarely executed in a single hole. The choice to install two or three drill works depends on the available space on the plot, distances to property boundaries and the minimum spacings to be maintained between each probe to avoid mutual thermal interference.
- The maximum permitted depth: each canton defines geothermal restriction maps. The presence of drinking water tables, gypsum layers, tectonic faults or old underground structures limits the maximum depth authorized on each cadastral sector.
- Administrative authorization: drill works are subject to the granting of a building permit and a special authorization from the cantonal environment or energy service. The request must be submitted by the agent or engineering geologist before engaging the drill rig on the site.
The financial aid scales (Pronovo and cantonal subsidy programs) integrated into the tool are taken from the studio's manual. They represent indicative starting values and have not been subject to direct proofreading at the official source. The client and installer must verify the amounts in force with the competent bodies. Aid requests must imperatively be submitted before the opening of the construction site.
What the Free Version Does Not Do
The free version works entirely in your browser. You can load a file, position the elements, adjust the heating capacity and export the data without creating an account or filling out a registration form. Your entry data remains locally on your workstation. The only exception concerns the map background call: if you enter an address in the location field, this address and the viewed geographic area are transmitted via the public swisstopo API in read-only mode. No file or measurement sheet is sent to Art Construction's servers.
This absence of server storage imposes management limits: the browser has no memory. If you reload or close the page, all your work disappears immediately. It is necessary to download a CSV export or print the technical sheet before leaving the screen. In this free edition, plans and sheets feature an Art Construction watermark, and the CSV export expressly mentions the free version. In addition, no unit price is automatically injected: the financial estimation requires the manual entry of your drilling costs.
To archive your projects, create calculation variants and structure your tender files, professional gateways integrate into our business tools:
- Centralize history and document management on the Portal.
- Generate your descriptions, quotes and calls for tenders directly in Tenders.
- Consult deployment and complete pricing options on our offer dedicated to construction companies.
Professional modules allow multi-version cloud backup, injection of the ACIP price base, teamwork and the editing of neutral documents in your company's colors.
Frequently asked questions
How is the drilling length calculated?
The total length is obtained by dividing the capacity extracted from the subsoil by the unit extraction capacity of the ground. The extracted capacity is equivalent to the heating capacity multiplied by one minus one over the machine COP at B0/W35. The final result is rounded to the nearest multiple of five meters.
What geological extraction values are applied by default?
The tool offers indicative values for plateau molasse, water-saturated gravel as well as dry limestone or clay. A correction coefficient remains modifiable to adjust the ratio according to the geological data provided by the project engineer.
Does the ground source heat pump cause external noise problems?
No. Thermal and mechanical components operate in a closed boiler room inside the building. No ventilation unit is installed outside. The acoustic radar thus displays a zero noise emission level on the outer perimeter of the plot.
Does the studio decide on the number of drill works to carry out?
No. The software only calculates the total probe length required. The distribution of this linear footage into one, two or more drill works depends on the available surface on the plot, the technical spacing required between the probes and the depth restrictions set by the canton.
Is my project data saved online?
No. In the free version, all information remains in the RAM of your web browser. Nothing is kept on our servers. The single network exchange corresponds to the map background call via the public swisstopo API during an address search.
Are the displayed financial aid amounts authoritative?
No. The amounts of cantonal programs and Pronovo come from the studio's internal manual. They constitute modifiable starting bases. You must check the current official scales with the cantonal energy services before launching contractual procedures.
What does the professional version bring compared to free access?
The professional version allows you to save your measurements on the cloud, resume a file as a team, export technical sheets without a watermark and automatically associate the calculated quantities with the ACIP price base to establish your company quotes.