Loading...
About this tool
What remains to be paid: entered cost, subsidies and tax savings
To assess the financial viability of a heating renovation combined with a photovoltaic roof, the gross amount of the quote is not enough. The owner or installer must measure the final net cost. This page opens the financial balance of the project to lay out the construction site data with complete clarity.
The operation is based on a simple rule: you enter the cost of your work including all taxes. The calculation studio offers no predefined prices or official commercial catalogues. The tool then subtracts potential subsidies from your gross amount: the single-rate remuneration for photovoltaics, the cantonal subsidy for the heat pump and any municipal aid. Next, the system estimates the foreseeable tax relief by applying your own marginal tax rate to the invested balance.
As long as the overall cost of the work is not entered in the interface, the page only presents the sum of potential subsidies. The tax saving calculation is activated as soon as your provisional investment is entered. If the subsidy amounts exceed the total cost entered, no tax savings are taken into account.
This approach provides a realistic projection of your remaining balance. You can visualize the relationship between initial cash outflows and financial returns spread over the fiscal year. The tool runs in your web browser, without account creation, without registration and without transmitting your financial data to a third-party server.
Single-rate remuneration, cantonal subsidy and municipal aid: cumulative checks
The financial setup of an energy system often brings together several sources of public aid. Federal programs must be distinguished from local support to avoid any surprises regarding final cash flow.
| Type of support | Competent body | Calculation principle |
|---|---|---|
| Single-rate remuneration | Pronovo (federal program) | Installed capacity of the photovoltaic generator |
| Cantonal subsidy | Cantonal energy services | Replacement of a fossil fuel system with a heat pump |
| Municipal aid | Municipal administration or local authority | Fixed local scale, varying according to current regulations |
The scales integrated into the tool are those of the studio workbook. They have not been directly rechecked at the source during each calculation session. You must verify current scales with Pronovo and your cantonal service before finalizing your cash flow forecasts. The calculation fields remain editable to allow you to adjust amounts to the realities of your municipality.
The costly mistake in the field consists of integrating municipal aid into the budget without verifying its existence or annual budgetary allocation. Clients are often seen relying on municipal participation when the municipal incentive fund is depleted or reserved for specific technical conditions. The action that avoids this disappointment is to consult municipal services with the technical data sheet of the installation before freezing the financing.
The accumulation of aid is subject to caps set by public regulations. Each entity can restrict the total amount received to prevent subsidies from exceeding the actual costs incurred for the work.
Tax deduction for energy-saving works
Beyond direct subsidies, Swiss taxation reduces the net amount of energy investments. Expenses incurred for a heat pump or solar installation are deductible from taxable income under certain maintenance and renovation conditions.
The tax saving calculation applied in the module is expressed by the following formula:
Tax savings = marginal rate × (cost of works incl. VAT − total public subsidies received)
Only the portion actually paid by the property owner qualifies for this reduction. You cannot enter amounts already covered by a subsidy from Pronovo, the canton or the municipality on your tax return. The depreciable base corresponds to the amount of paid invoices minus received contributions.
The deduction for energy-saving works depends on cantonal practices and the taxpayer's personal situation. Carrying over the burden to several tax years is sometimes allowed if the deductible amount exceeds the net income of the year of the works. The result displayed by our tool remains purely indicative. It is up to each owner to confirm the applicable treatment with the tax administration of their canton of residence or with their fiduciary.
The marginal tax rate varies greatly depending on the place of residence and income brackets. The tool allows you to freely adjust this rate to measure the sensitivity of your financing plan according to your actual situation.
Order of steps: application before works
The administrative timeline conditions the obtaining of financial aid for a heating and photovoltaic production installation. A rigorous order must be respected to preserve your rights.
- Establishment of sizing and request for tenders from trade contractors.
- Submission of the aid application to the cantonal energy service.
- Waiting for the formal decision or authorization to commit expenses.
- Submission of the building permit or work notification according to cantonal law.
- Execution of installation works on the construction site.
- Commissioning, inspection of installations and sending of proof of payment.
The cantonal aid application is generally submitted before the start of works. Any anticipated commitment of a firm order or construction site without prior agreement from the administrative service can lead to the definitive rejection of the subsidy file. Company certificates and detailed final invoices are required for the effective release of funds.
For the outdoor heat pump, noise emission management represents a decisive step in the authorization file. The noise calculation integrated into the tool follows the method of the Noise Circle execution aid. This indicative calculation replaces neither the noise protection certificate submitted with the permit application, nor the decision of the competent authority. The sound power level to be entered in the forms must correspond to the manufacturer's technical data sheet or the sound data list of the Swiss Professional Group for Heat Pumps.
What the free version does not do
The tool accessible on this page operates entirely within your web browser. The imported plan, drawn positions, your entered figures and all results remain confined to the temporary memory of your local session. Only exception: if you search for an address to display a map background, the searched address and the displayed map area are requested from swisstopo via the Confederation's public read-only API. No files or financial results are sent to Art Construction.
This free version has no permanent working memory: nothing is saved on a server. Closing or reloading the tab erases your entire study. It is up to you to export your elements before leaving the page. The plan image and the printed sheet bear a watermark in the name of Art Construction. Similarly, the CSV export of the measurement bears the mention of the free version.
The free module contains no price data extracted from the ACIP database: the cost of the work must be entered manually by you. Starting values (equivalent full-load hours, yields, specific loads, machine templates, design temperature and station irradiation) remain modifiable orders of magnitude to be validated in the field.
For advanced professional needs, switching to the paid range enables full functions:
- Permanent cloud backup of the construction site with version history.
- Direct loading of a saved project from the Portal or ERP system.
- Automated pricing from the ACIP price database then transfer to the quote in Tenders.
- Team collaboration mode on the same renovation files.
- Generation of reports and measurements without watermark, in your company's colors, via the offer accessible on our order page.
Frequently asked questions
How is the tax saving calculated in the balance?
The estimate applies a simple formula: the marginal tax rate is multiplied by the cost of the works including VAT minus the subsidies received. If subsidies cover the totality of the works, the tax saving is reduced to zero. This result is indicative and must be validated by the tax administration.
Can works begin before obtaining the decision for cantonal aid?
As a general rule, the cantonal aid application must be formally submitted before the start of construction works. Signing a quote or committing a machine order before this step can cancel the right to the subsidy according to each canton's guidelines.
Are the subsidy scales displayed in the tool updated automatically?
No, the amounts come from the studio's internal workbook and have not been rechecked at the source for each situation. You must imperatively verify current regulations with Pronovo, your canton and your municipality before freezing your budget.
Does the noise calculation module replace the official acoustic certificate?
No, the calculation follows the Noise Circle execution aid method for indicative purposes. It does not replace the noise protection certificate required for the building permit, nor the final decision of the competent authority regarding noise emissions.
Is my financial data or plans kept on your servers?
No, everything is processed locally in your web browser. Nothing is sent to Art Construction. Only the address search queries the public swisstopo API for cartography. As soon as you close or reload your tab, all your entries are erased.
Does the free tool include an installation price database?
No, the free tool contains no price data from the ACIP database. You must obligatorily enter the estimated or quoted cost of the works yourself for the studio to calculate the remaining balance and predictable tax effect.
What functions does the paid version bring for installers?
The paid version allows you to save construction sites in the cloud, manage successive versions, use the ACIP price database, transfer data to tender quotes and edit reports without a watermark with your company logo.